Академический Документы
Профессиональный Документы
Культура Документы
Routine(NR)
Hazardous
Hazard /
Activity
Sr. No.
Event
Lifting, carrying , Pushing of Stay
1 R Uneven ground level
2 R poor housekeeping
Consequences
exposed to
People
risk
(OCP, HSMP, PPE etc.)
Tripping over
Workers
Workers Tripping
Availabilty of drinking water, Availability of
Workers Heat stroke
rest area.
Probability
Severity
Y/N
Risk
N 3 2 6
N 3 2 6
Y 4 3 12
Y 3 2 6
N 4 1 4
Y 3 3 9
Y 4 3 12
N 2 1 2
Additional Control Measures Residual Risk
Probability
Severity
Risk
(OCP, HSMP, PPE etc.)
Training
Hazardous
Hazard /
Activity
Sr. No.
Event
1 Fitting of hardwares on the pole and R Heat, humidity
2 R
Sunlight, high wind
lifting of conductor
3 R
Working on Ladder at height
above 2 mt
4 R
6 R
Working on Ladder at height
above 2 mt
tor
Consequences
exposed to
People
risk
(OCP, HSMP, PPE etc.)
3
2
2
2
2
2
2
3
Probability
2
3
4
3
2
2
3
3
Severity
Base Risk
6
6
8
6
4
4
6
9
Risk
Additional Control Measures Residual Risk
Probability
Severity
Risk
(OCP, HSMP, PPE etc.)
Training, supervision 1 4 4
Hazardous
Hazard /
Activity
Sr. No.
Event
Erecting pole under or near
1 NR
charged HT /LT line
2 R
Pole erection
3 R
Working on Ladder at height
above 2 mt
4 R
6 R
Working on Ladder at height
above 2 mt
tor
Consequences
exposed to
People
risk
(OCP, HSMP, PPE etc.)
2
2
3
Probability
2
3
3
Severity
Base Risk
4
6
9
Risk
2 2 4
2 3 6
2 4 8
2 3 6
3 2 6
Additional Control Measures Residual Risk
Probability
Severity
Risk
(OCP, HSMP, PPE etc.)