Вы находитесь на странице: 1из 11

Curriculum Vitae

Ari Sulistiono
Male, 26 years old
Jl. Garuda II No. 47
Kel. Pasir Gunung Selatan
Cimanggis Depok 16951
Phone: (+62 21) 8771 6951
Hp: +62 813 1584 8490
Email: ari.sulistiono@gmail.com or
me@ari-sty.cz.cc, website: www.ari-sty.cz.cc

Objective

Electrical Engineering 5 Years Experiences

Graduate

D3 State Polytechnic of Jakarta (Polytechnic of University of Indonesia) 2002 2005.


th
Date of graduate : September 29 , 2005.
Final duty title : Design Software MMI (Man Machine Interface) and Design Fuzzy
Distributed Intelligent Control System using Microcontroller AT89S52.
Last GPA: 2.83 of four scales.

Personal Data

th
Place / Birthday: Kediri / March 27 , 1984
Sex: Male
Status: Single
Religion: Moslem
Nationality: Indonesian

Page 1 12/14/2010
Education Attainments

FORMAL EDUCATION
2002-2005: D3 State Polytechnic of Jakarta (Polytechnic of Indonesia University)
majoring Electrical Engineering
1999-2002: Senior High School SMUN 1 Grogol in Kediri, East Java
1996-1999: Junior High School SMPN 1 Tarokan in Kediri, East Java
1990-1996: Elementary School SDN 02 Jati in Kediri, East Java

NON FORMAL EDUCATION


2004: Basic applications of Programmable Logic Controller (PLC) and SCADA system
in industrial automation system, PNJ kampus baru UI-Depok.
2004: Electronic general lecture: Mechatronics on robotic system, PNJ, kampus baru UI
Depok.
2003: Management Organization Training, PNJ-Depok.
2002: Telecommunication General Lecture GPRS from Nokia and IM3
2002: Industrial Electronic General Lecture Automation Robotic and Application Lab
view
2002: Microcontroller Application for Industrial Control System Seminar, at Polytechnics
State of Jakarta
2002: Basic Training of Leadership Collaboration PNJ with Indonesian Army, Cibubur
2006: Training AutoCAD 2004 at Binus Center.
2006: Feeder management relay training (UR F60), GE-Canada.
2006: Partial Discharge Mapping & Test, SebaKMT-Germany.

Additional Skills

Computer Skills:

Microsoft Office: Microsoft Word, MS Excel, MS Power Pont, Microsoft Visio,


Microsoft FrontPage, Microsoft Project

Primavera Project: Primavera P3, SureTrak, Primavera Project Planner Essential

Drawing: AutoCAD 2D - 3D, El-CAD, Protel PCB & Schematic, AutoCAD Electrical
2011, Microsoft Visio, Photoshop, Flash (3D), Freehand.

Database: Microsoft Access, Microsoft Jet ADODB, Microsoft SQL Server, MySQL,
XML

Page 2 12/14/2010
Programming Language: Visual Basic 6.0, Visual Studio.Net, C++, Assembler, PHP,
HTML, ASP, PERL.

Software which I have been made: Software MMI/SCADA for Batch Plant,
Microcontroller Programmer, Fuzzy Logic Evaluator, Multimedia Laboratory for
Electrical Simulation, CPM 3P, Database HME, Servo Control, Control PLC Tester,
Water Treatment Monitoring System, PLN CBM Monitoring & Data Logging System,
etc.

E-Tap Powerstation 7.0 (Design, Calculate & Power System Analysis)

SCADA Power System (Citect).

Control System:
Electro-Mechanical (Conventional):

Panel Design & Panel Making, SAT and Modification for ACDB, DCDB,
Control Panel, Protection Panel.

High-risk building installation and power distribution.

Troubleshooting electrical installation: LV, MV and HV Electrical System.

Install and Troubleshooting AC/DC Motors and Control-Positioning Drives


(Inverter and Servo)

Design, Installation and Troubleshooting of Pneumatic and Hydraulic Control


System.

Digital Control:

Installation, programming and troubleshooting PLC (hardware & software).


Familiar PLC Type: Omron, LG, Mitsubishi, Schneider, Siemens, Idec,
Yokogawa, Allen Bradley, etc.

Mucrocontroller & Microprocessor programming (ASM, C, Ladder) and build


software for integration between plant to mucrocontrollers.

Data Link and Monitoring System: PC/Server to Devices via Modbus, DNP,
IEC or other open protocols using software (citect, excel/vb script, .Net, etc).
Power Electronic:

Power & Energy Utilities:

Protective Relays: UR Relay - GE, Siprotec series Siemens, ABB REL series,
Toshiba GRZ & GRL, Areva Micom, Schneider - SEPAM.

Page 3 12/14/2010
Design and develop a software/HMI/SCADA for Power & Energy Monitoring over
devices protocol using any digital devices which support open protocols and data
communication capability.

Primary & Secondary Injection test for HV Equipments nor Protective Relaying.
Capable for operate any injection kits (Omicron CPC series and CMC series, ISA
DRTS series, KoCoS, GE Programma, etc.)

HV Current Transformer FAT & SAT: Ratio, Knee-point, Burden, and CT


Characteristic Test.

Installation, Troubleshooting and Test/Commissioning of Battery and Battery Charger:


Capacity Test, Charger Function Test, etc.

Partial Discharge Test & Detection for Underground Cable and switchgear.

Design, calculation and analysis of new power plant, substation/switchyard,


transmission network and distribution of power with e-tap PowerStation software or
manual calculation.

Practical work Experiences

Practical Work: - P.T. Cipta Rantau Mandiri Comp. As freelance (2004, 1 Months)
- P.T. Hibec Indonesia as freelance (2003, 1 month), Assembly Connector
Cable for Musical Instrument Test Set.
- P.T. Citra Langgeng as freelance: digital display, error-assembling
detectors (for Yamaha Music Manufacturing Asia).
- C.V. Pratama teknik terapan as PLC trainer: PLC training in Neomax,
Krakatau Steel Industrial Estate (2005), and PLC Training for the student
in PNJ (2005).
- P.T. Anavasi as staff production: high frequency detector for analyzes the
pianos tweeter, March November 2005.

Organization Experiences

9 As Secretary in Himpunan Mahasiswa Jurusan Elektro period 2003/2004.


9 As project manager in Sehati 04, (Seminar Sehari Teknologi Listrik Industri 2004).
9 As event organizer in Electro fair 2004, HME PNJ.
9 As Event organizer in pekan cerdasku, Dept. Sospol BEM IKM PNJ.
9 As Project Officer in Ramadan Inside Electro 03
9 As Event organizer in Entrepreneurship Seminar and Product Creativity, BEM IKM
PNJ.
9 As Event Organizer in EDCM.

Page 4 12/14/2010
9 As Coordinator in LIMAPO (Liga Mahasiswa Politeknik)
9 As Coordinator in socialization of majors electro (2005).

Experiments

9 Development of laboratory of control system base on the multimedia and simulation


using macromedia flash 4.0, August 2005, DIKTI, Ciwaruga - Bandung.
9 Implementation of theory fuzzy set by computer as controller of speed of rotation of
motor dc servo, August 2005, DIP-PNJ, Depok Jawa Barat.
9 Design software and controller (automatic & remote operation) for controlling a 3-
phases induction motor, September 2005, DIKS-PNJ, Depok Jawa Barat.
9 Design soft-panel for control system test & simulation (for PLC exercise) without
actual objects, September 2005, DIP-PNJ, Depok Jawa Barat.
9 Sensitive color censor for detects color of manual book (manual book for each country
has different color indication), July 2005, PT YMMA (Yamaha Music Manufacturing
Asia).
9 Direct Control System uses the parallel port of computer, August 2005, DIKS-PNJ,
Depok Jawa Barat.
9 Electrical Studies : e-Tap Powerstation 4.0 + Substation Automation Simulation
Program.

Achievements

9 Fourth champion of Oration Competition in SMPN1 Tarokan Kediri, 1997.


9 Second champion of Boy Scout exploration next bunch of SMPN1 Tarokan, 1997.
9 Second champion of acoustic competition, SMUN1 Grogol, Kediri, 1999.
9 Fourth champion, Student Research and Technology Competition 2005, Direktorat
Menteri Pendidikan Tinggi, Jakarta, November 2005.
9 National Students Research Competition, Dirjen Pendidikan Tinggi, UMM - Malang,
June 2006.

Page 5 12/14/2010
Work Experiences

1. PT. Dinamika Elektra Mandiri, as Senior Electrical Engineer start in January 2006 February
2008. Project Experiences at PT Dinamika Elektra Mandiri:

1. Change over ES PLTG to PLTD and Installation of Double Feeder from ES1 to SWS1
Pertamina UP II Dumai Indonesia: Programming and Setting of relays protection, UR GE
Multilin - Canada, such as protection element, logic control, TCP/IP address, transfer &
remote operation, Auto Synchronous Transformator, Auto transfer Switch (ATS), Relay
Blocking, Metering and Display Configurations, etc. January March 2006.

2. Installation of Partial Discharge Monitoring for switchgears insulation. Location: main


substation PLN kebun sirih, Indipard 16 May Electronic Germany: Designing of the
control, installing device, & programming the device. March 2005.

3. Partial Discharge Mapping on 20kV underground cable: Collecting data of underground


cable using OWTS equipment and determine weak point of the cable. March April 2006.

4. Design software Multifunction Power Quality Meter: this software pooling the data each
hour from any revenue meters via ModBus protocol. Tested and implemented at PLN
using energy meter Shark 100 & 100 T (Electro Industries). April 2006.

5. Installation of battery (NiCad) and battery charger 230V 600Ah. Location: Indonesia
Power. March 2006.

6. Build system integrator between line transmission power meter operator


management maintenance staff for supporting CBM (Condition Based Maintenance)
program on PLN. Component used are power digital meter shark100, modbus protocol,
and visual basic 6.0.

7. As Trainer in Automatic Relay Test System Training, Oil & Gas Comp., Cnooc SES
Offshore, August 06.

8. Installation & Commissioning Digital Power Meter: PLTU Indonesia Power Semarang,
September 2006.

9. Site Acceptance Test for Generator Protection Relay Elin + CT Saturation contracted by
GE Turbine France: Cikarang Listrindo, Cikarang, April 06.

10. Test & Calibration Star-Relay contracted by GE Turbine France: Pupuk Kujang,
Kerawang, April 06.

11. Design Power & Energy Monitoring + Installation of Digital Power & Energy Meter
Shark100 PLN P3B Region Center of Java & DIY, November 2006.

12. Test & Callibration Elin - Differential Relay for Generator contracted by GE Turbine
France: Cikarang Listrindo, June 06.

13. Test & Callibration Distance Relay REL511 C1*2.5 + Overcurrent Relay contracted by
ABB Transmission & Distribution Tangerang, November 2006.

Page 6 12/14/2010
14. Installation & Commissioning of Digital Power and Energy Meter Shark100 Electro
Industries (USA) + Build Real Time Monitoring Software for Supporting CBM (Condition
Base Maintenance) CrazPro.exe VB.Net. Location: PLN P3B RJTD : UPT Solo, UPT
Kudus, UPT Purwokerto, UPT Jogja, UPT Semarang on December, 2006.

15. Installation & Commissioning of Online Partial Discharge Monitoring Indipard May
Elektronik, Gambh for Switchgear 12kV, Location: CNOOC South East Sumatra on
November, 2006.

16. Installation of Retraceable Grounding Assembly (RGA) 44 Units at Tank Farm Area.
Location: Total E&P Balikpapan, January - February 2007.

17. Perform Relay Test & Callibration for Generator Protection Relay Generator #2015 UA.
Location: Pertamina UPIII Plaju, Palembang, March 2007.

18. Conduct Training: Installation and Operation of Revenue Meter, 0.06 Class Accuracy
Nexus 1262 EIG (USA) for PLN P3B Jawa Bali. Location: Hotel Nikki, Denpasar, Bali
on 27th 29th March 2007.

19. Installation & Commissioning of Online Partial Discharge Monitoring Indipard May
Elektronik, Gambh for Generator and CB Cubicle, Location: PT Freeport Indonesia:
Puncak Jaya Power (FMI) Papua on May 2007.

20. Contract Service To Perform Calibration And Verification For Unit 7 Protection Relay
13.8KV Medium Voltage Switchgear. Location: IPMOMI Paiton, Situbondo, East Java.
June 2007.

21. Repair & Calibration Digital Revenue Meter 0.06% Class, 12 Units Nexus 1262 PLN P3B
JB, June 2007.

22. As Sub Contractor Toshiba Corporation, Japan: Data collection for Renewal of
Transmission Line Protection Relay Project at Siguragura P/S, Tangga P/S, and Kuala
Tanjung S/S: GRZ100 Protection Relay 275kV. Indonesia Asahan Alumunium, July 2007.

23. Power Quality Analysis & Data Collecting, Indah Kiat Pulp and Paper, PT. Contracted by
GE Energy, Singapore. September 2007.

24. Design Bay Monitoring System for Trafo, Line, Coupler, & Feeder: CrazPro Power &
Energy Monitoring 7 (develop using Visual Studio 2005, supporting Digital Power Meter
0.2S Shark 100) for PLN P3B JB RJTD UPT Solo & UPT Kudus. October 2007.

25. Installation & Commissioning of Online Partial Discharge Monitoring Indipard May
Elektronik, Gambh for New Feeder Cubicle (Scneider), Location: Pertamina UP V
Balikpapan, August 2007.

26. Sub Contract with Toshiba Corporation Japan (as Commissioning Engineer & Relay Test
Operator): Execution of Renewal of 275 kV Transmission Line Protection Relay at
Siguragura P/S (Nov. 2007), Tangga P/S (Dec. 2007), and Kuala Tanjung S/S (Jan. 2007):
GRZ100. Client: Indonesia Asahan Alumunium, PT. Responsibility: Relay Testing,
Erection & Cable Termination, Insulation Test, Sequence Check, Ass. Built Drawing, etc.

Page 7 12/14/2010
2. Sumitomo Corporation Switchyard & Substation (SCSS) under Toshiba Plant Service &
System Corp., as Test & Commissioning Engineer for 150kV Muara Karang Gas Power
Plant Project (MKGPP), Contract Period: 7th March 2008 up to 6th September 2010
(extended):

1. Assistance to Construction Service for procurement material and construction for PLTU
Muara Karang (PLN) - Gas Power Plant Project (JBIC Loan).

2. Electrical studies: starting from basic design up to detail design of 150kV RCPP,
Substation Automation & replacement method for Substation & Switchyard of PLTU Muara
Karang, PLTGU Muara Karang, Duri Kosambi S/S, Petukangan S/S, Budi Kemuliaan S/S,
Angke S/S.

3. 150kV PLTU Muara Karang Switchyard & Substation:

a) Design Protection Panel (schematic and operation hierarchy), ACDB, and Marshaling
Kiosk.

b) Design cable connection list and schematic drawing for Switchyard HV Equipments to
Main Control Panel.

c) Design Installation & Test Procedure for HV Equipments.

d) Conduct Individual Test for 150kV GIS (Gas Insulation System) & AIS (Air Insulation
System) Switchyard (CT, CVT, CCVT, CB, DS, SA, LT, etc.) and analyzing data
(based on IEC standard) per Diameter/Bay. Test included: Contact Resistance Test
for Installation, SF6 moisture test, CT ratio test (Current Injection Method for AIS &
Voltage Injection Method for GIS), CT secondary burden test, CT characteristic test
(kneepoint), CT polarity test up to prot. panel, CVT ratio test, CVT secondary burden
test, CVT polarity test, CB timing test, Contact Resistance Test for CB (Main Contact),
Insulation Resistance for all Equipments, Disconnector Insulation Test, Disconnector
Contact Resistance Test and High Voltage Test.

e) Conduct battery capacity test, rectifier and UPS test, and test and commissioning for
ACDB and DCDB panel.

f) Change over from existing system to new system.

g) Conduct individual test for Control & Protection Panel Siemens using Relay test
System Omicron CMC356: Line Differential Protection, Line Distance Protection
Relay, OCR, Auto re-close, Bus Protection Relay, GFR, Soft Logic Interlocking, Bay
Control Unit, GFR, Outstation metering, etc.

h) Collect and analyzing parameter of protection elements of the existing system and
recalculate for change over to the new system arrangement (up-rating S/Y
equipments & OHL from 1200A to 4000A).

i) Programming and setting protection alphanumerical relay: Siemens SIPROTEC


series for distance protection, differential protection, overcurrent protection, Breaker
Failure, Generator and S/Y interlocking, and IEC protocol for SCADA to RCC/JCC.

Page 8 12/14/2010
j) Programming and modification HMI for Substation Automation System: Siemens-
WinCC as per PLN standard (Teleinformasi plan) via IEC 60850 industrial standard
protocol.

k) Test & commissioning for Substation Control System and new telecommunication
system (gateway, fiber optic and server) up to RCC (Region Control Center) and JCC
(Jawa-Bali Control Center) SCADA System.

4. Duri Kosambi 150kV Substation:

a) Replacement of Bus Coupler, Bus Section, Busbar Conductor and Feeder Kebon
Jeruk.

b) Conduct Individual Test (AIS) for HV Equipments (CT, CVT, CB, DS, etc.) and
analyzing data (based on IEC standard) per Diameter/Bay. Test included: Contact
Resistance Test for Installation, SF6 moisture test, CT ratio test (Current Injection
Method for AIS & Voltage Injection Method for GIS), CT secondary burden test, CT
characteristic test (kneepoint), CT polarity test up to prot. panel, CVT ratio test, CVT
secondary burden test, CVT polarity test, CB timing test, Contact Resistance Test for
CB (Main Contact), Insulation Resistance for all Equipments, Disconnector Insulation
Test, Disconnector Contact Resistance Test and High Voltage Test.

c) Site survey and design cable connection list (cable schedule) for new control cable
that connects new HV equipment installation to existing system installation.

d) Test & commissioning of new telecommunication system.

e) Design, test & commissioning for new AC/DC distribution panel.

5. Petukangan 150kV Substation:

a) Site survey and collect data for Busbar Replacement.

b) Design cable connection list for new bus protection panel up to existing system.

c) Test & Commissioning of Bus Protection Panel.

d) Test & commissioning for Substation Control System and new telecommunication
system (gateway, fiber optic and server) up to RCC and JCC SCADA System.

e) Design, test & commissioning for new AC/DC distribution panel.

f) Conduct Individual Test (AIS) for HV Equipments (CT, CVT, CB, DS, etc.) and
analyzing data (based on IEC standard) per Diameter. Test included: contact
resistance test, insulation resistance test, SF6 moisture test, CT ratio-burden-
kneepoint and polarity test, CVT ratio-burden and polarity test, CB and DS test.

g) Replacement Busbar Conductor Rel #1 & Rel #2 @4000A and commissioning.

h) Busbar Protection calculation setting and programming, change-over to hi-impedance


bus-pro, test and commissioning.

Page 9 12/14/2010
6. 150kV PLTGU Muara Karang Switchyard & Substation:

a) Design Protection Panel, ACDB, and Marshaling Kiosk.

b) Design cable connection list and schematic drawing.

c) Design Installation & Test Procedure for HV Equipments.

d) Conduct Individual Test (GIS and AIS) for HV Equipments (CT, CVT, CB, DS, etc.)
and analyzing data (based on IEC standard) per Diameter. Test included: contact
resistance test, insulation resistance test, SF6 moisture test, CT ratio-burden-
kneepoint and polarity test, CVT ratio-burden and polarity test, CB and DS test.

e) Conduct test & commissioning for battery capacity/characteristic, battery charger


(rectifier), UPS, AC Distribution Board and DC Distribution Board.

f) Change over from existing system to new system.

g) Conduct protection relay individual test (also End to End test): Line Differential
Protection, Line Distance Protection Relay, OCR, Single Phase Autoreclose, Busbar
Protection Relay, etc.

h) Collect and analyzing parameter of protection elements of the existing system and
recalculate for change over to the new system arrangement.

i) Test & commissioning for Substation Control System (Substation Automation) and
new telecommunication system (gateway, fiber optic and server) up to RCC and JCC
SCADA System.

j) Design DCS Signal Mapping for Substation to Power Plant.

3. TOA Corporation (under Wasamitra Engineering), as Chief Electrical Engineer for Paiton 3
Expansion Project, 815MW Coal Fired Power Plant, Contract Period: 20th September 2010
up to 21th February 2010:

1. Design Construction of Temporary Power Distribution System at Project Site as per Load
Analysis.

2. Manage All Electrical Group to Perform a Safety Work and Safety Electrical System at
Project Site.

3. Manage Permit To Work for All Electrical Works at Live/Energized Electrical Distribution
Board.

4. Coordination of Electrical Works with Paiton Energy (owner) and All Sub-Contractor for
Safety and Electrical System Reliability.

5. Design and Submission of Distribution Board Schematic Diagram / Single Line Diagram
As Built Drawing to Owner (Paiton Energy).

6. Modification, Test and Inspection of Distribution Board with Owner (Paiton Energy).

7. Manage Monthly and Quarterly Inspection of Distribution Panels, Tools and Equipments
for All Sub-Contractor at Project Site then Report to Owner (Paiton Energy).

Page 10 12/14/2010
8. Design Cable Routing, Calculate Cable Ampicity for All Electrical Distribution Network at
Project Site to Comply Owners Requirements of Safety and Reliability Electrical
Installation at Plant.

Personal Characteristics

Self-motivated, hard working, have good analyses and problem solving capability, good
interpersonal and communication skills, high responsibility, able and easy to work with other (in
group), have a good leadership, trustworthy, adaptable and responsible.

I declare that the particulars stated in these curriculum vitae are true of the best of my knowledge
and belief that I have not willfully suppressed any material or facts.

Paiton, December 14, 2010

Ari Sulistiono

Page 11 12/14/2010

Вам также может понравиться