INSTALACIONES SANITARIAS (INCLUYE TUBERIA Y CONEXIONES AGUAS SERVIDAS)
PTO AGUA RESIDUALE PVC ASTM. 2" (51 MM) E=3.2 MM, COLGAN. INCL. CONEX (140 PTOS)
1 TUBO 2" 3MTS A/S ML 441.00
2 CODO PVC 2" X45 A/S PZA 560.00
3 YEE 2 PVC A/S PZA 280.00
4 CODO PVC 2" X90 A/S PZA 280.00
5 TEE 2" A/S PZA 420.00
6 SIFON PVC DE 2" PZA 120.00
1 LIJA 3-M GRANO 150 PLIEGO 9"X11" PZA 45.00
2 SOLDADURA PVC 1/4 GALON ENVASE 5.00
7 TUBO 4" 3M A/S ML 252.00
8 CODO PVC 4" X45 PZA 120.00
9 YEE 4" PVC A/S PZA 120.00
10 CODO PVC 4" X90 PZA 60.00
11 TEE 4" A/S PZA 120.00
CONCRETO ARMADO Y ACERO REFUERZO PARA LOSA DE FUNDACION
CONCRETO PARA BASE DE PAVIMENTO (210 KG/CM2)
12 210 kgs/cm2 - ASENTAMIENTO 5" M3 62.60
13 CABILLAS ESTRIADAS 1/2 PULG PZA 58.05
14 CABILLAS ESTRIADAS 3/8 PULG PZA 126.17
15 CABILLAS ESTRIADAS 3/4 PULG PZA 161.15
16 CABILLAS ESTRIADAS 5/8 PULG PZA 27.33
17 PIEDRA DE 1" M3 18.50
18 ARENA GRIS M3 15.00
19 LISTONES 5x5 M3 0.34
20 LMINA COMPUESTO DE PINO RANURADO 12MM (1,22 X 2,44 MTS) M3 0.08
21 CLAVO DE 4" KG 17.58
INSTALACIONES ELECTRICAS
23 TUBO CONDUIT 4" X 3M ML 36.00
24 TUBO CONDUIT 2" X 3M ML 36.00
25 TUBO CONDUIT 1" X 3M ML 72.60
26 TUBO CONDUIT 1/2" X 3M ML 454.80
27 CURVA CONDUIT 4" X90 PZA 2.00
28 CURVA CONDUIT 2" X90 PZA 11.88
29 CURVA CONDUIT 1" X90 PZA 23.96
30 CURVA CONDUIT 1/2" X90 PZA 150.08
INSTALACIONES SANITARIAS (INCLUYE TUBERIA Y CONEXIONES AGUAS BLANCAS)
31 TUBO PVC 1/2" 6M PZA 6.00
32 TUBO PVC 3/4" 6M PZA 6.00
33 TUBO PVC 1" 6M PZA 5.00
34 TUBO PVC 1.1/2" 6M PZA 12.00
35 LIJA 3-M GRANO 150 PLIEGO 9"X11" PZA 1.00
36 SOLDADURA PVC 1/4 GALON ENVASE 2.00
37 LIMPIADOR 760G SELLADOR ENVASE 1.00
38 UNION UNIV LISA PVC 1/2" PZA 2.00
39 UNION UNIV LISA PVC 3/4" PZA 2.00
40 UNION UNIV LISA PVC 1" PZA 1.00
41 UNION UNIV LISA PVC 1.1/2 PZA 3.00
42 CODO PVC 1/2" X90 PZA 1.00
43 CODO PVC 3/4" X90 PZA 1.00
44 CODO PVC 1" X90 PZA 1.00
45 CODO PVC 1 1/2" X90 PZA 2.00
46 TEE 1/2" PVC PZA 2.00
47 TEE 3/4" PVC PZA 2.00
48 TEE 1" PVC PZA 2.00
49 TEE 1.1/2" PVC PZA 4.00
INSTALACIONES GAS
50 TUBERIA DE H.G.ASTM DIAMETRO 1" L=6.40M PZA 12.00
51 PERMATEX ENVASE 2.00
52 ESMALTE AMARILLO CARTERPILLAR GALON 5.00
53 CODO H.G. 90 1" PZA 4.00
54 TEE H.G. 1" PZA 4.00
55 ANILLO H.G. D=1" PZA 4.00
ETAPA DE ESTRUCTURA
ESTRUCTURA METALICA PREFABRICADA
31 COLUMNAS PIEZA 18.00
32 VIGAS PRINCIPALES PIEZA 74.00
33 VIGAS SECUNDARIAS PIEZA 116.00
34 ELEMENTOS MISCELNEOS PIEZA 204.00
35 CONECTORES Y ARANDELAS PIEZA 5275.00
36 TORNILLOS JUEGO 2312.00
ETAPA DE CERRAMIENTOS
INSTALACIONES SANITARIAS (INCLUYE TUBERIA Y CONEXIONES AGUAS SERVIDAS)
PTO AGUA RESIDUAL PVC ASTM. 4" (102 MM) E=3.2 MM, COLGAN. INCL. CONEX (60 PTOS)
37 TUBO 4" 3M A/S ML 252.00
38 CODO PVC 4" X45 PZA 120.00
39 TUBO 4" 3M A/S, COLG. INCLUYE CONEX. ML 90.00
40 TUBO 4" 3M A/S EMBUT. ENTERR. INCL. CONEX. ML 69.00
PTO VENTIL. AGUA RESID. PVC 2" (51 MM) E=3.2 MM, AMB, INTER. RECINTO SAN. (120 PTOS)
41 TUBO 2" 3MTS A/S ML 360.00
42 CODO PVC 2" X90 A/S PZA 240.00
43 TEE 2" A/S PZA 240.00
44 TUBO 3" 3MTS A/S ML 221.00
INSTALACIONES SANITARIAS (INCLUYE TUBERIA Y CONEXIONES AGUAS CLARAS)
45 TUBO PVC 1/2" 6M PZA 20.00
46 TUBO PVC 3/4" 6M PZA 23.00
PTO AGUA CLARA PVC AGUA FRIA ASTM. 1/2" EMBUT. ENTERR. INCL. CONEX. (180 PTOS)
47 TUBO PVC 1/2" 6M ML 5.00
48 CODO PVC 1/2" X90 PZA 12.00
49 TEE 1/2" PVC PZA 4.00
50 LLAVE DE PASO PVC 3/4" PZA 20.00
51 LLAVE DE PASO PVC 1 1/2" PZA 4.00
INSTALACIONES ELCTRICAS (INCLUYE TUBERIA Y CONEXIONES)
52 TUBO CONDUIT 1" X 3M ML 290.40
53 TUBO CONDUIT 1/2" X 3M ML 1,819.20
54 UNION CONDUIT 1 PZA 96.00
55 UNION CONDUIT 1/2" PZA 601.00
56 CURVA CONDUIT 1" X90 PZA 96.00
57 CURVA CONDUIT 1/2" X90 PZA 601.00
58 CAJETIN OCTAGONAL PLASTICO PZA 214.00
59 CAJETIN 4"X2" PLASTICO PZA 490.00
60 CAJA DE PASO DE 16"x 15"x 6" PZA 5.00
61 CAJA DE PASO DE 8"x 8"x 6" PZA 10.00
INSTALACIONES GAS
62 TUBERIA DE H.G. ASTM DIAMETRO 1/2" L=6.40M PZA 26.00
63 CODO H.G. 90 1" PZA 17.00
64 TEE H.G. 1" PZA 55.00
65 ANILLO H.G. D=1" PZA 25.00
66 PERMATEX ENVASE 10.00
67 VLVULA PARA GAS TIPO MULLER DE SEGURIDAD. PZA 20.00
68 VLVULA TIPO ASME 16,44 PZA 1.00
MORTERO ESPECIAL DE CONCRETO PARA RECUBRIMIENTO DE TUBERIA DE GAS
69 CEMENTO PORTLAND TIPO I SACO 11.00
70 ARENA GRIS M3 2.00
PINTURA FONDO TIPO ALQUDICO Y ASFLTICA EN TUBERIAS ASTM PARA ACOMET. DE GAS
BRIGADA DE INGENIERIA. CONSTRUPATRIA CONSTRUCCION
Distrito Capital
DOCUMENTOS TECNICOS
Distrito Capital
DOCUMENTOS TECNICOS
ETAPA DE ACABADOS
ALBAILERIA (INCLUYE ACABADOS CON CERAMICA EN PISOS Y PAREDES)
102 CEMENTO PORTLAND TIPO I SACO 70.00
103 ARENA GRIS M3 11.00
104 CERAMICA DE MEDIDA: 20 X 20 M2 127.00
105 LANILLA DE ACERO ROLLO 50.00
105 PEGO GRIS SACO 32.00
106 CEMENTO BLANCO SACO 26.00
107 ARENA P/ FRISO M3 5.00
HERRERA Y CARPINTERA (INCLUYE COLOCACION DE PUERTAS, CERRADURAS Y MACHIHEMBRADO PARA TECHO)
108 PUERTAS ENTAMBORADA 0.90 X 2.10 PZA 20.00
109 PUERTA SEMIENTAMBORADA 0.85 X 2.05 M PZA 60.00
110 PUERTAS ENTAMBORADAS 0.75 X 2.10 DERECHA PZA 40.00
111 PUERTA METALICA MACIZA 0.85 X 2.10 M PZA 2.00
112 CERRADURA TIPO POMO PZA 100.00
113 CERRADURAS CON CILINDRO PZA 80.00
114 LISTONES DE MADERA PARA MACHIHEMBRADO M 510.00
115 MACHIHEMBRADO M2 312.00
INSTALACIONES ELECTRICAS (INCLUYE COLOCACION DE CONDUCTORES ELECTRICOS, PEINADO DE TABLERO Y COLOCACION DE ACCESORIOS ELECTRICOS)