Вы находитесь на странице: 1из 8

CURRICULUM VITAE

1.PERSONAL DATA
 NAME : KARNALIS

 DATE OF BIRTH : 07 JUNI 1970

 ADDRESS : JLN. JEND SUDIRMAN GG. SELAMAT NO : 83 RT/RW 02/01

BALAI MAKAM DURI - RIAU

 SEX : MALE

 MARITAL STATUS : MARRIED

 NATIONALITY : INDONESIAN

 EDUCATION : SENIOR HIGH SCHOOL

 RELIGION : MOSLEM

 HP : 0813 6550 3740

 Email : kkarnalis3@gmail.com

2.RECOMMENDATION COURSE / CERTIFICATE


 CERTIFICATION OF COMPLETION IIF - PT. CPI

 CERTIFICATE OF APPRECIATION FSWP - PT. CPI

 CERTIFICATE EFFECTIVE LEADERSHIP - OTI

 CERTIFICATION OF APPRECIATION SAFETY PROCEDURE - PT. RW- CPI

 CERTIFICATE OF EMPOWERMENT - PT. MS

 SAFETY WORKER AWARD FUEL GAS LINE PROJECT - PT. CPI

 CONSTRUCTION SUPERVISOR SAFETY COURSE - PT. TF

 ACHIEVING EXCELLENCE GOAL THROUGH EXCELLENCE PERFORMANCE - PT. MS

 COACHING AND COUNSELING SKILLS - PT. MS


 ESCORTER TRAINING - PT. CPI

 FIRST AID AND HIV / AIDS - PT. TJE

 THE BEST INDIVIDUAL PERFORMANCE - PT. TJE

 CERTIFICATE OF ACHIEVEMENT - PT. TPEC

 FIRE COURSE - PT. TPEC

 SFWP - PT. CPI

 JOB SAFETY ANALYSIS - PT. TPEC

 CONSTRUCTION JOB SUPERVISOR - PT. TPEC

 CERTIFICATE OF ACHIEVEMENT - PT. CPI

 ADVANCED FIRST AID COURSE - PT. TPEC

 JOB SITE INSPECTION - PT. TPEC

 CERTIFICATE OF APPRECIATION - PT. CPI

 PIPING 2 COURSE - PT. TPEC

 SAFETY WORKER AWARD - PT. CPI

 SPECIAL INDIVIDUAL SAFETY AWARD - PT. TPEC

 BASIC MATCH COURSE - PT. TPEC

 ADVANCED MATCH COURSE - PT. TPEC

 LEAD PIPE FITTER COURSE - PT. TPEC

 PIPE FITTER COURSE - PT. TPEC

 SAFETY MONITOR - PT. RMI

1. SUMMARY EXPERIENCE.

Has over twenty-four years in the construction pipeline oil and gas projects. It is included pipeline
corridor and fabrication, the central gathering station, central steam station, test cvc / AWT station Duri
oil field of fabrication through installation and start-ups. Productivity project control, standardization and
supervise all employees who work safely and follow safety procedures. To emphasize the employees to
wear safety equipment during work hours.
Agustus 2014 Feb PT.Adhi Karya Tbk CS WUR A NG
2016 ( Chevron Project Duri Hoou )
Responsible for the installation and manufacture of
pipe, pipe rolls for all kinds of sizes. Coordination 2
and 6 crew supervisor pipes ranging from making up
the installation of the pipe rolls. And make daily
reports, weekly and monthly reports required by the
company, the field coordinator RW / CPI .
Responsibilities: Manage 2 supervisors and 6 crew
pipes, update and monitor the progress of goals,
work procedures security purposes, communication
Sr. Supervisor
with management, RW and CPI.

Type of works :

 Lift up and Replacement cvc line 8


condensate Duri HO
 Replacement cvc condensate line 10 , 8
Duri HO
 Replacement Header 30 , out going and in
coming 16, bypass 6 Heater exchanger Duri
HO
 Chemical Injection Duri HO
 Fabricate and install SID MFU Duri HO
 Soft water injection WWD line 16 Duri HO

 Fabricate and Install line 4 WWD Duri HO

 Insatall steam injector dan Test Spool

Februari 2014 25 PT.Sumigita Inwha CS WUR D CPI Project,HOOU


juni 2014 Duri
(PT. Rumpun Jaya Mandiri )
Responsible for the installation and manufacture of
pipes, pipe spools for all types of pipe sizes. 6 crew
Superintendent
coordination ranging from the form, the installation
of the pipe rolls. Make daily reports, weekly and
monthly reports required by the company, the field
coordinator RW and CPI. Responsibilities: Managing
the pipe 6 crew, and monitor the progress of
progress, goals safely work, security procedures,
communication with management, RW and CPI.

Type of works :

 Fabricate and Install pipe line 24 out going


MFU Duri HO
 Fabricate and Install pipe 3,4 Wellpad
improvement Duri HO
Agust 2009 PT.MULTI STRUCTURE
31 Jan 2014 (Chevron Project)
Responsible for the installation and manufacture of
pipe, pipe rolls for all kinds of sizes. 4 crew
coordination pipes, ranging from making up the
installation of the pipe rolls. And make daily reports,
weekly and monthly reports required by the
company, and the field coordinator TF / CPI.
Responsibilities: Managing the 4 crew piping and 2
companies sub cont, update and monitor the
progress of Progress, work procedures safely, security
procedures, communication with management, tf
and cpi.

Type of works :
 Install pipe 2,3, 4 10 and pipe 16 soft Supervisor
water injection Duri HO
 General repair fwko tank API 650/653 Duri
HO
 Install disposal line pipe 20 from area 1 to
area 13 Duri HO
 Repair wash tank API 650/653 Duri HO
 Repair brine tank API 650/653 Duri HO
 Replace vent line pipe dia 6, 14, 18, 20,
Duri HO

 Replace pipe dia 8, 30 Heater exanger Duri


HO
 Inactive isolation fasilities pipe dia 8, 12,
16, 18, 20, 24. Duri HO
 Replace brine line pipe dia 2, 3, 4, 6, 8.
Duri HO
 Fabricate and install platform SID all Cgs
 Tie-in pipe dia 8 production line. Kulin 40
 Replace pipe dia 2 , 6 fuel gas line Duri HO
 Fabricate and install pipe dia 8 cooling pond
Duri HO
 Fabricate and install pipe dia 2, 3, 4, utility
water line Duri HO
2005 - 2009 PT. TRUBA JURONG ENGINEERING
(Chevron Project)
Responsibility : Manage and responsible to 4 foreman
piping. Controlling projects productivity
standardization as per program increase productivity
from less than 400 inches per welder per day to 1600
weld inches.

Type of works :
 Fabricate and install platform SID. all Cgs
and all Awt
 Repair wash tank API 650 / 653 Duri HO
 Pit improvement spools 2,3,4 all
awt/cvc General Foreman
 Modify vent tank Awt Duri HO ( Act Supervisor )
 Install pipe line 2 and cassing tank Duri main
Kulim
 Fabricate and install Test manifold pipe dia
3, 8, 10 Duri HO
 Fabricate and install platform SID Kulin TS1
& TS2
 Fabricate and install spools well hook up
producer all area
2004 - 2005 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS.
(Chevron Project)
To supervise about 24 manpower consist of
welders, pipe fitter, helper and operators engaged in
the construction and fabrication shop of various size
and type of pipe such as fabrication and install
manifold for 180 location . This assignment including
to perform necessary coordination with other party
for the execution of this work. Road crossing facility,
platform installation, and shut down completion until
start-up are covered in this assignment. Responsible
to provide any requirements for the job such as
permit and other pre-requisite for the job.
Type of works :

 Repair tank API 650/653


 pipe dia 4 up 30 Road crossing
 fabricate and install spools orifice chock pipe ASST GENERAL
2 , 3 FOREMAN
 fabricate and install Bridges
 fabricate Frame test manifold
 fabricate and install 3,4, 8,10 pipe
production and test manifold
 Casing vapor lines 8
 Shut down pipe line 24 & 30 incoming Duri
HO
 Fabricate and install pipe spools 2,3, 4 10
pilot project Duri HO

Responsible to all the paper work


administrations system include the daily, weekly and
monthly report in the company business. Responsible
for planning and scheduling manpower-man hours
charging to the project. Responsible for quality
control and to do the job site training to
subordinates.
2000 - 2004 PT.TRIPATRA ENGINEERS AND CONSTRUCTORS.
(Caltex Project)
Supervision of pipe fitters, welders and
helpers involved in spooling, structural steel, pressure
vessels and tank erection utilizing ANSI B313, ASME
IX, ASME VII, API 1104, API 650 & 653,codes for the
Caltex pacific Indonesia Duri Steam Flood Project.
Type of works :

 Repair wash tank and fwko tank API 650 Senior Foreman
&653
 piping and structure shop fabrication
 tie-in 30 pipe hot water.
 Fabricate and install 3,4, 8,10 spools test
monifold
 Repair MFU Duri HO

1998 - 2000 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS.


(Caltex Project)
Responsibility :
Manage 7 Labor people which consist of lead
fitter pipe, fitter pipe, welders, helpers and to
instruct to work safely and safe and wear safety
appliance truly.
Type of works :
 Fabrication and install Vent tank Awt Duri HO
FOREMAN
 Fabrication and install over flow tank Awt
Duri HO
 fabricate over flow tank SE,SW,NE,NC Area 10
 Fabricate spool manifold 3, 4
 Fabricate and install guardrail
 Fabricate light pole
 Fabricate platform
 safety monitor
1995 - 1998 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS.
(Caltex Project)
Type of works :

 Supervised Fab crews to fabricate and install :


 Piping and structure shop fabrication
 Structure erection
 Repair tank
 Fabricate vent stack
 Fabricate pipe anchor all size
Lead Pipe Fittrer
 Fabricate pipe shoe all type
 Fabricate spool manifold
 Fabricate bridges
 safety monito

1992 - 1995 PT. TRIPATRA ENGINEERS AND CONSTRUCTORS.


(Caltex Project)
Type of works :

Fabricate and install buildings, pipe manifold,


vessel, separator, pipe spool fin fan cooler, platform,
Pipe Fitter
and repaired old tank in fabrication shop

1991 - 1992 PT. RMI.


(Caltex Project)
Type of works :

Fabricate and install buildings, pipe manifold, Helper


vessel, separator, pipe spool fin fan cooler, platform,
and repaired old tank in fabrication shop.

Вам также может понравиться