Test Plan for Power Conversion system

Module: Test plan No:

Manufacturer/Person responsible for Manufacturing Site:


putting the equipment on the market:

Technical data of type / type family:

Category:
Description of pressure equipment / type /
family:
Intended use:
Type identification:
Manufacturer logo:
Identification:

(Additional data relevant for the type/type


family, add if needed)
(delete non-appliccable items)

Seite 1 von 3
TV SD Certification and Testing (China) Co., Ltd.

Test Plan for Power Conversion system

Testing based on:

Directive:
Standards:

Deviations: N/A

Intended tests and Tests according to checklist:


examinations:

1. Measurements/examinations and results (CHECKLIST) Lead time

clause Test items for DEWA standard V2.0


1. D.1.4.3 Functional tests
2. D.1.4.3.1 Test procedure for overvoltage and
overfrequency functions
3. D.1.4.3.2 Test procedure for undervoltage and
underfrequency functions
4. D.1.4.3.3 Test procedure for Loss of Mains functions
5. D.1.4.3.4 Additional prescriptions for functional tests
6. D.1.4.4 Self-test
7. D.1.4.5 EMC compatibility tests
8. D.1.4.6 Tests of environmental compatibility
9. D.1.4.7 Insulation tests
10. D.1.4.8 Overloading tests of the measuring circuits
11. D.3.2 Tests on inverters for low voltage connected
RRGUs
a) harmonic emission limits for Class A
c) limits of voltage fluctuations and flicker
12. D.3.2.1.1 Verifying connection and reconnection
13. D.3.2.1.2 Verification of step release of the active power
14. D.3.2.2.1 Verification of constructional requirements:
reactive power capability
15. D.3.2.2.2 Mode of execution and registration of the test
results
16. D.3.2.2.3 Exchange of reactive power according to an
assigned level
- Mode of execution and registration of the test
results (assuming Q regulation)
17. D.3.2.2.4 Time response to a step change in the level
assigned
18. D.3.2.2.5 Automatic delivery of reactive power according to
a characteristic curve cos = f (P)
test plan for DEWA.doc
Seite 2 von 3
TV SD Certification and Testing (China) Co., Ltd.

Test Plan for Power Conversion system

19. D.3.2.3.1 Control of active power in the presence of


transients on the transmission network ()
20. D.3.2.3.2 Active Power Limitation upon external command
21. D.3.2.4.1 Verification of emission of a DC component
22. D.3.2.4.2 Verification of protections to prevent the injection
of a DC component
23. D.3.2.5 Verification of insensitivity to voltage dips (LVRT
capability)
24. D.3.2.6 Verification of insensitivity to automatic reclosing
under phase mismatching
Note to entry 1: test items listed based on the previous test experience of power conversion system, it may
vary if the sample/product is different than the previous ones.
Note to entry 2: test lead time not includes for retest in case of failures

Previously performed tests:

Selection of test sample(s):

Quantity: 1 piece

Document (s):

type: Rating lable or marking plate, Products datasheet


installation anual,
circuit drawings With critical mark,
PCE Construction drawing (External)
PCE Construction drawing (Internal)
PCB layouts Each layer
Critical components list: specifications and certification documents if available
Transformer specification: Material list & certificate
Reactive Coil specification: same as above

Comments:

The sample(s) is (are) representative for the type (type family). The tests listed above will be performed in
compliance with the test requirements of the standards/regulations quoted in this test plan.
The tests will be performed to establish whether the solutions/standards adopted by the
manufacturer meet the essential requirements of the Directive.