Document Reference: S-002-PR-01
1.a
CT ratio for 1 MVA transformer shall be changed to 100/1 A and
accordingly settings shall be proposed
1.b
SBEF protection setting study shall be included.
1.c Time setting multiplier shall be revised as the proposed TMS is very
high, which will take long time to clear the fault.
1.d Relay Summary: All the available function, relay input mask, output
mask, etc. shall be indicated.
Grading Curve:
1. I2t damage curve for all equipment shall be indicated.
1.e 2. Grading curve shall be verified for both minimum and maximum
fault condition and also, grading time shall be indicated in the
grading curve.
Sequence of Operation
1.f 1. Breaker operating time shall be confirmed with supporting
document.
2. Sequence of operation shall be verified for all type of faults.
1.h SLD: Normal open point (NOP) and accordingly protection study
shall be considered, for all possible operating conditions.
1.j The entire relay setting calculation soft copy (Native files) and hard
copy shall be submitted. All ETAP model shall be submitted to AADC
in order to integrate with existing model.
1.k Operating time and grading time shall be submitted for both
minimum and maximum fault.
Effect of emerging transients in the aftermath of fault clearance
1.l causing inductive motors to draw high current in excess of relay
setting shall be considered.
The I2t/damage curve of the equipment shall be taken into
1.m consideration. The adequacy of cable, transformer, switchgear to
protect to be justified.
1.n LV side fuse/MCCB /MCB shall be coordinated with O/C & E/F
protection.
Independent setting calculation/ summary table shall be submitted
1.o for each relay /feeder and substation. Typical settings/calculation
will not be entertained.
2.b The entire relay setting calculation soft copy (Native files) including
manual calculation and hard copy shall be submitted.
2.c
Relay settings summary sheet shall be submitted.
2.d
Thermal OL shall be activated as alarm only.
Project: Proective relay Co-ordination Study for AM-0716 AM-0717
Page 3 of 4
Document Reference: S-002-PR-01
To be discussed.