File: ch07, Chapter 7: Moving Into Design

Multiple Choice
1. In what SDLC stage do we determine the business needs for an information
systems project?
a. The design phase
b. The analysis phase
c. The dissection stage
d. The installation stage
e. The big bang stage
Ans: b
Response: See Transition From Requirements to Design
Difficulty: Medium

2. System design is the determination of the overall system architecture-


consisting of a set of physical processing components, _______________, and
the communication among them-that will satisfy the systems essential
requirements.
a. Workmanship
b. Order entry methods, HR feedback
c. Hardware, Software, People
d. Engineering data plans, fiber optic specifications
e. None of the above
Ans: c
Response: See Transition From Requirements to Design
Difficulty: Medium

3. In the initial stage of design, what are business requirements converted into?
a. System Requirements
b. Work Order Summary
c. Computer Qualifications Checklist
d. Vanilla System
e. Hardware Blueprint
Ans: a
Response: See Transition From Requirements to Design
Difficulty: Medium

4. During the design stage, the team must create a(n) _________ by specifying
access restrictions and by identifying the need for ________, authentication
and virus control.
a. System, integration
b. Security breach, emergency access
c. Secure system, encryption
d. Automated program, constant testing
e. Pecking order, governmental access
Ans: c
Response: See Transition From Requirements to Design
Difficulty: Easy

5. Where are the decisions stored that are made regarding the hardware and
software that will be purchased to support the new system?
a. Order Manifest
b. Hardware Sales Receipt
c. Suppliers Computer System
d. Presidents Office
e. Hardware and Software Specification
Ans: e
Response: See Transition From Requirements to Design
Difficulty: Easy

6. The system inputs and outputs will be designed along with a plan or__________
of the way the systems features will be navigated.
a. Blueprint
b. Compass
c. Instructional Guide
d. Roadmap
e. FAQ
Ans: d
Response: See Transition From Requirements to Design
Difficulty: Medium

7. _______ repository entries are updated to reflect specific technology decisions


as they are made.
a. DFD
b. Sequential
c. CASE
d. Hardware
e. None of the above
Ans: c
Response: See Transition From Requirements to Design
Difficulty: Medium

8. Which of the following lists indicates the correct ordering of deliverables in a


system specification document?
a. System Acquisition Weighted Alternative Matrix, Interface Design,
Physical Data Model Data Storage Design
b. Data Storage Design, Interface Design, Architecture Design, Updated
Crud Matrix
c. Hardware and Software Specifications, Interface Design, Data Storage
Design, Architecture Design
d. Program Design Specifications, Physical Data Model, Data Storage
Design, Architecture Design
e. Update CASE Repository Entries, Update CRUD Matrix, Interface
Design, Architecture Design
Ans: a
Response: See Transition From Requirements to Design
Difficulty: Medium

9. If on a limited time budget, the best way to be sure you remain efficient and
effective in designing a system is to utilize the ____________.
a. Porters 5 Forces Model
b. Outsourcing Model
c. RAD and Timeboxing Techniques
d. Hire/Fire Motivational Theory
e. Not Attempt the Project
Ans: c
Response: See Avoiding Classic Design Mistakes
Difficulty: Medium

10.The system specification contains what?


a. Design documents, hardware and software specification
b. Physical process models, interface design
c. Physical data model
d. Architecture design
e. All of the above
Ans: e
Response: See Transition From Requirements to Design
Difficulty: Medium

11.How many ways does the text suggest one can approach the creation of a
new system?
a. 1
b. 2
c. 3
d. 4
e. 7
Ans: c
Response: See Transition System Acquisition Strategies
Difficulty: Medium

12.What skills are necessary when undertaking a custom software design?


a. Technical
b. Functional
c. Project Management
d. A and C
e. A, B, and C
Ans: e
Response: See Transition System Acquisition Strategies
Difficulty: Medium

13.For efficiency purposes, it is wise to___________ when there is a basic software


need to be satisfied.
a. Implement a company-wide project team to handle a custom software
scripting
b. Purchase a packaged system
c. Design a blueprint and contract an outside vendor to develop a
program
d. Make do with the current software package
e. Utilize a professional consultant to develop a system of servers7
Ans: b
Response: See Transition System Acquisition Strategies
Difficulty: Easy

14.Enterprise Resource Planning (ERP) Systems are:


a. All-encompassing systems
b. Difficult to install and can result in serious problems for a company
c. Cheaper since they are created by a third party
d. A and B
e. B and C
Ans: d
Response: See Transition System Acquisition Strategies
Difficulty: Hard

15.Workarounds are:
a. Not supported by a vendor who supplied the software
b. Designed by the vendor
c. Created to interface two software packages that are compatible with
each other
d. Enterprise Wide Software Packages that are designed for satellite use
e. None of the above
Ans: a
Response: See Transition System Acquisition Strategies
Difficulty: Hard

16.Systems Integration refers to:


a. The process of synching all computers to the mainframe
b. The delivery of systems to the final destination office
c. Combining packaged software, the legacy system and new software
d. Adding the original hard drives to a newer system
e. Creating a new software to monitor power consumption
Ans: c
Response: See Transition System Acquisition Strategies
Difficulty: Medium

17.What makes systems integration so difficult?


a. Finding the original data to install on the new server
b. Creating a ghost drive to house the old information
c. Installing new software packages on older machines
d. Bringing legacy system data and new data together
e. None of the above
Ans: d
Response: See Transition System Acquisition Strategies
Difficulty: Medium
18.Another name for custom development might be:
a. Offshore outsourcing
b. In-house development
c. Vendor supplied in-house consulting
d. CASE tools
e. Package software
Ans: b
Response: see Custom Development
Difficulty: easy

19.Which might NOT be a good package software solution?


a. Payroll at Cloverfarms dairy
b. Accounts receivable at Staples
c. Rocket control software for NASA
d. Course management system at the University of Nebraska
e. Scanning software for Kroger grocery stores
Ans: c
Response: see Packaged Software
Difficulty: easy

20.Which is probably true about packaged software


a. In most cases, the software is a perfect fit for the companies need
b. Packaged software works best where the company has a unique need
c. The time frame is flexible to long
d. The business need is common
e. The project has a highly skills project manager who has been with the
company for many years and has an excellent relationship with both
business users and the IT development staff
Ans: d
Response: see Packaged Software
Difficulty: easy

21.Outsourcing can include:


a. Hiring an external vendor
b. Hiring an external developer
c. Hiring an external service provider
d. A and C
e. A, B and C
Ans: e
Response: Outsourcing
Difficulty: easy

22.Outsourcing firms called _____________ supply software applications and/or


software related services through the Internet.
a. Application Service Providers (ASPs)
b. Enterprise Resource Providers (ERPs)
c. System Development Life Cycle Companies (SDLCs)
d. Information Technology Developers (ITDs)
e. None of the above
Ans: a
Response: Outsourcing
Difficulty: Medium

23.A time and arrangements deal is considered:


a. Very flexible
b. Very rigid
c. Cheaper than any other option
d. Useless when considering a systems design
e. Always the best option for any project
Ans: a
Response: Outsourcing
Difficulty: Medium

24.Fixed-price contracts are considered:


a. Very flexible
b. Very rigid
c. Always cheaper than any other option
d. Useless when considering a systems design
e. Always the best option for any project
Ans: b
Response: Outsourcing
Difficulty: Medium

25.Value-added projects are:


a. When the outsourcer earns a percentage of the completed systems
benefits
b. Not a feasible option for any project at any time
c. Gaining popularity
d. A and C
e. None of the above
Ans: d
Response: Outsourcing
Difficulty: Medium

26.Custom development is used when:


a. The business need is unique
b. The business need is not core to the business
c. The project has a project manager who can coordinate vendor efforts
d. The time frame is short
e. The skills are not strategic
Ans: a
Response: Outsourcing
Difficulty: Medium

27.Packaged systems are used when:


a. The business need is not core to the business
b. There is a desire to build in-house skills
c. The time frame is flexible
d. The project has a project manager who can coordinate vendor efforts
e. The decision to outsource is strategic
Ans: d
Response: Outsourcing
Difficulty: Medium

28.Application service providers might be best associated with:


a. In-house development
b. Packaged software
c. Unique and strategic systems
d. Outsourcing
e. Internet Service Providers
Ans: d
Response: see Outsourcing
Difficulty: easy

29.Matt is an analyst for the Pauxtis Media Company. He is in his office at 5:00
a.m. every Tuesday morning for a project update videoconference. He is
probably involved in:
a. In-house development
b. Working with vendors on an RFP
c. Customizing a package to fit Pauxtis
d. Working with his regional Ernst and Young consulting team
e. Offshore outsourcing
Ans: e
Response: see Outsourcing
Difficulty: medium

30.Outsourcing is used when:


a. The project has a project manager who can coordinate vendor efforts
b. There is a desire to build in-house skills
c. In-house functional and technical skills exist
d. The business need is not core to the business
e. None of the above
Ans: d
Response: Outsourcing
Difficulty: med

31.What can push a project off track?


a. Funding
b. Staffing
c. Business users
d. A and B
e. A, B and C
Ans: e
Response: Project Management
Difficulty: hard
32.Requests for Proposals (RFPs) serve what purpose?
a. Integrate systems with one another
b. Create synergy amongst staff members
c. Solicit information from providers
d. Engage mobile computers with mainframe technology
e. Develop morale amongst managers
Ans: c
Response: Selecting an Acquisition Strategy
Difficulty: hard

33. Becky is preparing a document that has detailed description of needs,


special technical factors, evaluation criteria, timetable and more. She is
probably working on a(n):
a. CRUD matrix
b. Alternative Matrix
c. RFP
d. ERP
e. DFD
Ans: c
Response: see Selecting an Acquisition strategy
Difficulty: medium

34.Requests for Proposals (RFPs) should contain


a. Detailed description of needs
b. Special technical needs
c. Evaluation criteria
d. A and B
e. A, B and C
Ans: e
Response: Selecting an Acquisition Strategy
Difficulty: hard

35.When only a price is needed from a vendor, the following will likely be
requested from the possible vendors:
a. Request for Proposal (RFP)
b. Request for Information (RFI)
c. Request for Quote (RFQ)
d. Request for Efficient Information Distribution (REID)
e. More Optimal Desires (MOD)
Ans: c
Response: Selecting an Acquisition Strategy
Difficulty: medium

36.The following document is utilized with possible vendors on projects with


smaller budgets, instead of sending a lengthy document to all possible
vendors:
a. Request for Proposal (RFP)
b. Request for Information (RFI)
c. Request for Quote (RFQ)
d. Request for Efficient Information Distribution (REID)
e. More Optimal Desires (MOD)
Ans: b
Response: Selecting an Acquisition Strategy
Difficulty: medium

37.A Request for Information (RFI) is used with vendors when there is a need for
________?
a. Pricing
b. Data Analysis
c. Information
d. Network Associate Password Help
e. None of the above
Ans: c
Response: Selecting an Acquisition Strategy
Difficulty: easy

38.The score column in the Alternative Matrix represents what?


a. How expensive the install will be
b. How easy the install will be
c. How well the criteria are met by the alternative
d. How long the coded page will be
e. A and D
Ans: c
Response: Alternative Matrix
Difficulty: hard

39.The design phase of the SDLC:


a. Produces a users manual, does users training and creates online
documentation for the new system
b. Involves writing of code (generally in an object oriented language)
c. Uses the output of JAD sessions to create logical use cases and DFDs
d. Involves interviewing of users to determine requirements
e. Uses the requirements that were gathered during analysis to create a
blueprint for the future system
Ans: e
Response: see Introduction
Difficulty: easy

40.CRUD matrix can be used in the design phase to work with tables and
possible user interaction with those tables. The letter C in CRUD stands for:
a. Computer
b. Create
c. Communicate
d. Complete
e. Constant
Ans: b
Response: see Transition from Requirements to Design
Difficulty: medium
41.The letter R in CRUD matrix (for tables and user involvement) stands for:
a. Replace
b. Replicate
c. Relationship
d. Read
e. Read-only
Ans: d
Response: see Transition from Requirements to Design
Difficulty: medium

42. The letter D in CRUD matrix stands for:


a. Delete
b. Deny use
c. Deliver
d. Document
e. Denormalize
Ans: a
Response: see Transition from Requirements to Design
Difficulty: easy

43.Which of the following is normally NOT done in the design phase of the SDLC?
a. Decisions for hardware and software purchases are made
b. User interactions are planned out (inputs, outputs, user interfaces)
c. Cost / Benefits of the new system are carefully calculated
d. Logical DFDs and ERDs are converted into physical DFDs and ERDs
e. The physical data model is created
Ans: c
Response: See Transition from Requirements to Design
Difficulty: medium

44.Which is NOT a part of the System Specification document?


a. Use Cases
b. Physical Data Model
c. Updated CRUD matrix
d. Architecture Design
e. System Acquisition Weighted alternative Matrix
Ans: a
Response: See Transition from Requirements to Design
Difficulty: medium

45. Which of the following is NOT a system acquisition strategy as presented in


the book?
a. Custom development
b. Outsourcing to a regional consultant (like IBM)
c. Use a JAD session to acquire the system
d. Using the companys programming staff to write the code (aka in-
house development)
e. Buying a pre-written software package
Ans: c
Response: See System Acquisition Strategies
Difficulty: medium

46.If (a) the business need is unique, (b) there is a desire to build in-house skills;
(c) the time frame is flexible, it might be best to:
a. Do in-house / custom development
b. Buy an ERP system
c. Outsource to India
d. Purchase a software package
e. Hire a consultant
Ans: a
Response: See Business Need (especially figure 7-4)
Difficulty: medium

47. If (a) the business need is common; (b) the skills needed are not strategic;
(c) the time frame is short; it might be best to:
a. Use in-house / custom development
b. Hire a vendor to write the code for you
c. Outsource to India
d. Purchase a software package
e. Hire a consultant
Ans: d
Response: See Business Need (especially figure 7-4)
Difficulty: medium

48.If (a) the business need is not core to the business; (b) the project has a
highly skilled project manager; (c) in-house functional or technical experience
does not exist; it might be best to:
a. Use in-house / custom development
b. Buy an ERP system
c. Outsource to a company specializing in that technology
d. Purchase a software package
e. Hire a consultant
Ans: c
Response: See Business Need (especially figure 7-4)
Difficulty: medium

49.One problem with using packages software systems is:


a. It takes a very long time to get the system and get it installed
b. The company has to accept the functionality that is provided with the
system
c. Many common software packages have been written and tested and
are readily available
d. There are many good software packages that are reasonable in price
e. Most software packages allow for some customization
Ans: b
Response: See Business Need (especially figure 7-4)
Difficulty: medium

50.An advantage of custom development might be:


a. You get a system that is tailored to the current business and meets
specific needs
b. The rapid development of custom systems
c. The low cost (as compared to buying a package)
d. The low risk factor
e. The ability for in-house developers to work on systems that are in new
programming languages and in technologies that are unknown to them
prior to the development
Ans: a
Response: see Custom Development
Difficulty: medium

51.Which is NOT true of outsourcing?


a. It can be done offshore
b. It can be done by an ASP
c. There can be a low cost of entry
d. It requires a large in-house staff
e. It can reduce internal IT costs
Ans: d
Response: See Outsourcing
Difficulty: easy

52.Which is NOT one of the primary contract types made with outsourcing?
a. Time and arrangements
b. Fixed-price contract
c. Distance and confluence contract
d. Value-added contract
e. Paying for the expenses and time to get the job done
Ans: c
Response: see Outsourcing
Difficulty: medium

53.Which is NOT a recommended guideline for managing outsourcing?


a. Define and stabilize requirements before signing a contract
b. Dont outsource what you dont understand
c. Emphasize rigid expectations and short-term relationships
d. Select the vendor, developer or service provider carefully
e. Keep the lines of communication open between you and your
outsourcer
Ans: c
Response: see Outsourcing
Difficulty: medium

54.Which is NOT a factor in choosing a development option?


a. Data base normalization
b. In-house experience
c. Time frame
d. Project skills
e. Project management
Ans: a
Response: see Business Need
Difficulty: easy

55.What percentage of companies on the InformationWeek 500 list of business


technology innovators say they engage in offshore IT outsourcing?
a. 0 to 10%
b. 10% to 25%
c. 25% to 40%
d. 40% to 60%
e. Over 60%
Ans: e
Response: see Business Need
Difficulty: medium

56.In terms of project management, which option might require excellent project
management skills and a proven methodology?
a. Outsourcing to Nebraska
b. Outsourcing to India
c. Buying a packaged solution
d. Doing custom development
e. Buying an ERP system
Ans: d
Response: see Project Management
Difficulty: hard

57.RFP is an acronym for:


a. Reason for Programming
b. Request for Proposal
c. Rational Forensics Platform
d. Relationship with Foreign Providers
e. Real Forecast Project
Ans: b
Response: see Selecting an acquisition Strategy
Difficulty: easy

58.Which of the following will probably NOT be part of a Request for Proposal
(RFP)?
a. Certain key facts that the vendor requires
b. Special technical needs
c. Procedures to follow
d. Project timetable
e. Use case diagrams
Ans: e
Response: see Selecting an Acquisition Strategy
Difficulty: easy

59.A Request for Proposal (RFP) will result in a:


a. Vendor proposal that is a binding offer to accomplish the tasks
described in the RFP
b. Gentlemans agreement on the offer
c. Substantially more expensive project
d. Custom development
e. Reduction in in-house programming effort
Ans: a
Response: see Selecting a Acquisition Strategy
Difficulty: medium

60.A table that can be used to look at various design options is a(n):
a. RFP
b. CRUD
c. Gantt Chart
d. Alternative Matrix
e. SQL query
Ans: d
Response: see Alternative Matrix
Difficulty: easy

61.When using an alternative matrix, frequently analysts will assign ____________


to certain factors to signify the importance of the factor in the decision.
a. Probabilities
b. Reluctance factors
c. Weights
d. Project sponsors
e. Data stores
Ans: c
Response: see Alternative Matrix
Difficulty: easy

62.An outsourcing arrangement where you pay no more than what was expected
is known as a(n):
a. Time and arrangements contract
b. Fixed-price contract
c. Value-added contract
d. Distance and time contract
e. Billing operational contract
Ans: b
Response: See Outsourcing
Difficulty: easy

True False
63.System requirements are communicated through a collection of design
documents and physical processes and data models.
Ans: True
Response: See Transition From Requirements to Design
Difficulty: Medium
64.Business requirements are communicated through a collection of design
documents and physical processes and data models.
Ans: False
Response: See Transition From Requirements to Design
Difficulty: Medium

65.The decision to make, to buy, or to outsource influences the design tasks that
are performed throughout the rest of the design phase.
Ans: True
Response: See Transition From Requirements to Design
Difficulty: Easy

66.There is no need to determine the reliability or performance of a new system


due to the inherent dangers all technologies pose.
Ans: False
Response: See Transition From Requirements to Design
Difficulty: Easy

67.CASE repository entries are updated to reflect specific technology decisions


as they are made.
Ans: True
Response: See Transition From Requirements to Design
Difficulty: Medium

68.Prototyping is the interface design step that often uncovers additional


information that is needed in the system, leading to a revision of the physical
DFDs or ERPs.
Ans: False
Response: See Transition From Requirements to Design
Difficulty: Medium

69.There is absolutely no need for designing a custom system since there are
already so many pre-packaged systems available to any company regardless
of its size.
Ans: False
Response: See System Acquisition Strategies
Difficulty: Easy

70.Building a system in-house builds technical skills and functional knowledge


that one may not want to allow to walk out of the door.
Ans: True
Response: See System Acquisition Strategies
Difficulty: Easy

71.Highly skilled IS Professionals are easy to hire and retain.


Ans: False
Response: See System Acquisition Strategies
Difficulty: Easy
72.In a custom software case, all parts of the system need to be completely
customized and scripted to the companys specifications including ancillary
software to the current system.
Ans: False
Response: See System Acquisition Strategies
Difficulty: Medium

73.Letting technology drive a business can be dangerous.


Ans: True
Response: See System Acquisition Strategies
Difficulty: Medium

74.A workaround is a custom-built add-on program that interfaces with packaged


applications to handle specific needs.
Ans: True
Response: See System Acquisition Strategies
Difficulty: Medium

75.The key challenge in systems integration is avoiding a system wide crash


upon installation of legacy software.
Ans: False
Response: See System Acquisition Strategies
Difficulty: Medium

76.Outsourcing requires the least in-house resources.


Ans: True
Response: Outsourcing
Difficulty: Easy

77.Outsourcing firms called Application Software Providers (ASPs) supply


software applications and/or software related services through the Internet.
Ans: True
Response: Outsourcing
Difficulty: Easy

78.Application Software Providers (ASPs) should be utilized when considering


non-core programming and/custom needs.
Ans: True
Response: Outsourcing
Difficulty: Medium

79.Time and arrangements deals are potentially more expensive if the service
provider requires unforeseen resources to complete the project on time.
Ans: True
Response: Outsourcing
Difficulty: Easy
80.If the business need is core to the business then it is best to outsource the
system development.
Ans: False
Response: Outsourcing
Difficulty: hard

81.A common need to the business should be satisfied by contracting with an


Application Service Provider (ASP).
Ans: True
Response: Outsourcing
Difficulty: Medium

82.Custom development that can be achieved by the in-house team and core
business practices are both examples of times when outsourcing is not an
option.
Ans: True
Response: Outsourcing
Difficulty: Medium

83.The only skills that are applied during systems projects are technical.
Ans: False
Response: Project Skills
Difficulty: easy

84.The only skills that are applied during systems projects are functional.
Ans: False
Response: Project Skills
Difficulty: easy

85.The score column in the Alternative Matrix represents how easily specific
criteria are met by the alternative.
Ans: True
Response: Alternative Matrix
Difficulty: easy

86.An IT department has just received its newest onslaught of system


maintenance requests from the finance, marketing and accounting divisions
and has added them to the growing list of fixes needed. Tomorrow, there will
be a request placed by the CTO that there is to be a new processing system
put into place that will take the place of the current MS Word system. The
best alternative is to utilize a custom program that will replace the original
program.
Ans: False
Response: Influences on Acquisition Strategy
Difficulty: easy
87.A department head is apprehensive as to what implementation system he
should employ. The best method of ensuring a successful and efficient
installation of the new systems would be to utilize an alternative matrix.
Ans: True
Response: Alternative Matrix
Difficulty: easy

88.The Design phase of the SDLC uses the requirements that were gathered
during analysis to actually build (and code if necessary) the final system.
Ans: False
Response: See Introduction
Difficulty: Medium

89.The Design phase of the SDLC builds on the logical designs from the analysis
phase (like logical ERDs and logical DFDs)
Ans: True
Response: See Introduction
Difficulty: medium

90. The design phase decides how the new system will operate.
Ans: True
Response: See introduction
Difficulty: easy

91.During the initial part of design, the project team converts the business
requirements for the system into system requirements.
Ans: True
Response: See Transition from Requirements to Design
Difficulty: easy

92.During the design phase, physical aspects of the system (like physical DFDs
and physical ERDs) are converted and rebuilt into logical aspects.
Ans: False
Response: See Transition from Requirements to Design
Difficulty: easy

93.One systems development option is to build a system from scratch.


Ans: True
Response: See Transition from Requirements to Design
Difficulty: easy

94.One systems development option is to have a system developed by using an


outsourcing strategy.
Ans: True
Response: See Transition from Requirements to Design
Difficulty: medium

95.One systems development option is to let users build their own system using
tools like Excel and Access, with support from the Microsoft help desk.
Ans: False
Response: See Transition from Requirements to Design
Difficulty: medium

96.CRUD stands for Create, Redesign, Update and Deploy and is a matrix of
table functions in databases.
Ans: False
Response: See Transition from Requirements to Design (actually first defined
in chapter 6)
Difficulty: hard

97.During the design phase, the project team carefully considers the
nonfunctional business requirements (such as performance, cultural and
political aspects).
Ans: True
Response: See Transition from Requirements to Design
Difficulty: medium

98.In the analysis phase, architecture decisions are made and written up in the
hardware and software specifications.
Ans: False
Response: See Transition from Requirements to Design (it is the design
phase!!)
Difficulty: medium

Essaay
99.At the end of the design phase, there is a document named the system
specification that describes the different design documents and their uses.
What is the consolidated purpose of this deliverable and why is it important?

Ans: The system specifications document contains the: physical process models,
physical data model, architecture design, hardware and software specification,
interface design and program design. These elements represent the blueprint for
the physical system layout inclusive of server configurations, cable connectivity and
any ancillary devices that will be a part of the overall system. Additionally, the
documents contain software, hardware and technical specifications that will enable
programmers and service personnel to operate the machinery as well as to
prescribe the proper workaround, patches, fixes and software additions and
upgrades to the physical system.

This is an important consolidation of documents because it provides the creator,


end user and maintenance engineers with a written model of the system they are
about to implement which will minimize errors as well as allow for timely and
effective corrective measures.
Response: See Transition from Requirements to Design

Difficulty: medium
100. What types of influences are there on determining the type of installation to
pursue with relation to resources and the acquisition of a new system?

Ans: When considering a new system, there are five different items to consider.

First, one must consider the business need. Is it unique? Is it able to be solved with
simple packaged software? Is the need core to our system? This will influence the
project strategy as a whole and determine the overall expense of the project.

Second, in-house experience will determine whether or not there is enough skill
located within the current set of employees to manufacture the desired outcome.

Third, project skills: do we have the ability to learn this with our programmers or will
we need to outsource programmers to assist us?

Fourth, project management, can we complete the task with our current
management team or will we need consultants to assist us in completing the task?

Fifth, how much time do we have? Will we be able to complete the project quickly or
are we on a tight time budget? Will we need additional manpower to push the
project through?

Response: See Business Need (and figure 7-4)


Difficulty: medium

101. What is an alternative matrix? What does it do?

Ans: An alternative matrix is a chart that compares the pros and cons of a projects
attributes based on a grading scheme across the multitude of acquisition methods.
The purpose of the chart is to help the IT acquisition team in determining the best
alternative for their specific need. Without performing this analysis, it is difficult to
determine the ultimate implementation plan based on an objective comparison
system.
Response: see Alternative Matrix

Difficulty: medium

102. What are the three acquisition strategies? Describe them.

Ans: Custom development, packaged software and outsourcing are the three
acquisition strategies.

Custom development utilizes the project teams skills in creating a ground-up


software solution. This is often the most time consuming and demanding on in-
house resources. This is a great alternative if the nature of the project is conducive
to the skills already present in-house and the need is core to the business itself.

Packaged software is by far the fastest of the implementation strategies. This option
is when the acquisition team installs a pre-written packaged software solution into
its current IT configuration. Often times workarounds are required to intertwine the
systems; however, this takes the bulk of the programming out of the equation and
doesnt completely remove the programmers from their everyday tasks for as long
as a custom development strategy.

Outsourcing utilizes external programmers and engineers. This is often expensive if


the terms of the contract are not laid out clearly and accurately in the beginning. In
an ideal situation, external programmers can be brought in-house so they may
educate the current team for future projects. If this is not an alternative and time is
of the essence, exporting the responsibilities to an external vendor can expedite the
process of programming. A significant downside to outsourcing is that your system
is exposed to the outside vendors staff, which can be a security concern if the
system data and/or processes are mission-critical or of a sensitive nature.
Response: see System Acquisition Strategies
Difficulty: medium

103. There are three request systems utilized by system acquisition teams.
What are they and what are their differences?

Ans: The three request systems utilized by IT acquisition teams are commonly
known as RFP, RFI, and RFQ.

RFP is a request for proposal that is submitted to a vendor when the in-house team
needs the specifications, time-frame, system description and how the system
proposed will fit their needs.

RFI is a request for information that is submitted by the acquisition team to a


vendor for general information; it is usually targeted to a wider vendor audience to
gather basic information about possible solutions. Its use is often followed with a
targeted RFP to the most possible vendors.

RFQ is a request for quote. This is the final step after the list of equipment needed is
determined and complete. All that is required is a vendors price to complete the
job.

Response: see Selecting an Acquisition Strategy

Difficulty: medium

104. Jeff is an analyst. The human resources department is very unhappy


with their payroll package. They want the information systems department
to write them a new package as they think they have unique needs that cant
be meet with a packaged solution. What should Jeff do?

Ans: Payroll is a very common application and there are many good payroll
programs on the market. Jeff really needs to understand what the problems with
the current package are. Is it old (i.e. only runs on a mainframe system)? What
functions does HR want to do that the package does not support? In that payroll
information must be reported to state and federal officials for tax reasons, it
probably dont not make sense to write a complete package but to find one that
meets HR needs. After a detailed investigation, it may be best to create either an
RPI or RPQ to get additional information and bids from potential vendors.

Response: see System Acquisition Strategies

Difficulty: medium

105. NewTechSystems has contracted with a well-known regional consulting


company (RCC). In the original contract, the agreement was for time-and-
arrangements, but lately it seems like there are excessive time amounts and
excessive arrangements. Sometimes what seems minor to NewTechSystems
with an estimated time of under 2 hours takes RCC 20 hours. What
discussions need to take place?

Ans: It would seem like RCC either has (a) slow, inept people handling this account;
(b) found errors that escaped NewTechSystems view; (c) is milking
NewTechSystems for more money and being unethical. NewTechSystems needs to
fully review the arrangement with RCC and review the work that is billed. Is the
work needed and legitimate? A high-level meeting with NewTechSystems and
Regional Consulting Company is needed now.

Response: See Outsourcing

Difficulty: medium

106. NewTechSystems has contracted some subsystem development to


Indian Technology Group from Bangalore India. Paul is managing the account
for NewTechSystems. When he asks for a status report, he seems to get a
vague answer. When he calls to talk to the manager who was in charge when
the contract was negotiated, that person is always out of the office or
unavailable and never returns phone calls. The subsystem is needed next
month for incorporation into the updated system. What should Paul do?

Ans: (will vary) It seems like maybe there is a communication problem. Paul needs
to find another manager to talk to or to find out an exact time to call the original
manager. It might be that all is going fine, but it might also be that there are
problems.

Response: See Outsourcing

Difficulty: hard