Project: 15250 15250-ME-DAS-021 Rev-A SHEET 1 OF 4
Number
R RETURNED WITH COMMENTS. REVISE & RESUBMIT WORK SHALL NOT PROCEED
C APPROVED & ACCEPTED AS MARKED. REVISE & RE-SUBMIT WORK MAY PROCEED
A APPROVED NO COMMENTS.
NAME :
DATE :
Orientation Horizontal
Service GAS/LIQUID EXCHANGER
Type BEM Horz. Size NPS 8" x 3048 (Tube length) Connected In 1 PARALEL
Shell/Unit Surf/Unit (Eff) 5.5 m Surf/Shell (Eff)
1 PERFORMANCE OF ONE UNIT
2 Fluid allocation SHELL SIDE
3 Fluid name HCDP LIQUID
Fluid quantity, Total
4 kg/s(lb/h) 0.917(7277)
5 Vapor (In/Out) kg/s 0 0.019
6 Liquid kg/s 0.917 0.898
7 Noncondensable kg/s 0 0
8
9 Temperature (In/Out) C(F) -23.3(-10) -11.2(11.76)
10 Dew/Bubble point C(F) 533.8(992.99) -23.3(-9.99)
102.3(6.384) /
11 Density Vapor/Liquid kg/m3(lb/ft3) - /35.883(574.791) 565.4(35.294)
12 Viscosity - / 0.1936 0.0143 / 0.1791
13 Molecular wt, Vap 21.15
14 Molecular wt, NC
2.64(0.6324) /
15 Specific heat kJ/(kg-K)(BTU/lb-F) - / 2.23(0.5347) 2.29(0.5479)
0.034(0.02) /
16 Thermal conductivity W/mK (BTU/ft-h-F) - / 0.097(0.056) 0.156(0.09)
17 Latent heat kJ/kg (BTU/lb) 126.8(54.5) 126.8(54.5)
18 Pressure (abs) bar (psi) 78.23(1134.7) 78.23(1134.5)
19 Velocity (Mean/Max) m/s (ft/s) 0.18(0.6) / 0.29(0.96)
20 Pressure drop, allow./calc. bar (psi) 0.483 (7) 0.012(0.17)
21 Fouling resistance (min) m2.K/kW(ft2-h-F/BTU) 0.088 (0.0005)
22 Heat exchanged 27.6 KW MTD (corrected) -4.92 C
23 Transfer rate, Service 2214 (390) Dirty 2694.3 (474.5) Clean 2978.82 (524.6) W/m 2.K (BTU/(h-ft2-F))
CONSTRUCTION OF ONE SHELL
24 SHELL SIDE
Page 2 of 13
40 Channel/rear channel shell: SA-420 WPL6 / SA-333 Gr.6 Tubesheet-floating: -
41 Tubesheets-stationary: SA-350 LF2 Cl. 1 Impingement protection: None
42 Floating head cover: -
43 Baffle-cross SA-516 Gr.485 Baffle No.: 16 Type: Single segmental Cut(%d) 38.6
44 Baffle-long.: -
45 Supports-tube U-bend: 0 Type: -
46 Tube-tubesheet joint: Partial strength weld
47 Expansion joint: Type None
48 RhoV2-Inlet nozzle 473 Bundle entrance 13 Bundle exit 30 lb/(ft-s2)
49 Gaskets - Flexitalic spiral wound 316 SS non-asbestos graphite filler with 316 SS inner & CS outer ring.
50 Floating head: -
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
Page 3 of 13
ROCESSING FACILITY (GPF III)
Rev-A SHEET 2 OF 4
Horizontal
GAS/LIQUID EXCHANGER
1 PARALEL 1 Series
5.5 m
RFORMANCE OF ONE UNIT
TUBE SIDE
HCDP GAS
3.663(29073)
3.39 3.38
0.274 0.285
0 0
-2.35(27.77) -5.37(22.33)
82.2(179.99) -216.778(-358.2)
94.3(5.887)/772.5(48.226) 95.7(5.979)/763(47.631)
2.4(0.5733)/2.49(0.5944) 2.42(0.5797)/2.47(0.5909)
0.034(0.02)/0.141(0.082) 0.034(0.02)/0.138(0.08)
168.9(72.6) 145.6(62.6)
78.9(1144.7) 78.6(1140.56)
6.74(22.03) / 6.78(22.23)
0.348(5) 0.285(4.14)
0.088 (0.0005) 0.0006 A based
K (BTU/(h-ft2-F))
STRUCTION OF ONE SHELL
TUBE SIDE
89.63(1300)
66 (150)
89.63 @ 66
12.7 / 11.11 (min)
11.11 (min)
50 mm (COLD)
1
3
1 / 80 / 600#
1 / 80 / 600#
Page 4 of 13
Tubesheet-floating: -
Impingement protection: None
ter ring.
Page 5 of 13
GAMBAT SOUTH GAS PROCESSING FACILITY (GPF II
11
12 ESTIMATED WEIGHT AND VOLUME
13 Volume Shell/Tube m3
14 Empty Weight Kg
16 Piping,Platforms,Ladders Weight Kg
17 Insulation Weight Kg
21 Erection Conditions Kg
22 Operating Conditions Kg
23 Test Conditions Kg
24 Cladding Weight Kg
25
26 LOAD AT BASE
27 Operatin
28 Maximum Vertical Saddle Load Kgf 154
29 Maximum Transverse Saddle Shear Load Kgf 88.
30 Maximum Longitudinal Saddle Shear Load Kgf 17
34 Maximum Wind Saddle Moment Kgf-m 18
35 Maximum Seismic Saddle Moment Kgf-m 71
36
37
38
39
40
41
42
43
44
45
Page 6 of 13
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
Page 7 of 13
ROCESSING FACILITY (GPF III)
Rev-A SHEET 3 OF 4
AND TESTING REQUIREMENTS
Impact Testing Yes, As Per Code
Special Heat Treatment As Per Code
Radiography Yes, 100 % (RT-1)
Pressure Test As Per Code
PWHT As Per Code
Dimensional Control As Per Code
Visual Inspection As Per Code
LOAD AT BASE
Page 8 of 13
Page 9 of 13
GAMBAT SOUTH GAS PROCESSING FACILITY (GPF I
SIZE
24 SR . NO. NOZZLE NO. NOZZLE IDENTIFICATION QTY RATING FLANGE
(INCH)
Page 10 of 13
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Page 11 of 13
S PROCESSING FACILITY (GPF III)
Rev-A SHEET 4 OF 4
SCHEMATIC DIAGRAM
NOZZLE SCHEDULE
REMARKS
long weld
long weld
long weld
long weld
long weld
NOTES
Page 12 of 13
Page 13 of 13