EUROPEAN COMMISSION

DG MOVE

SEVENTH FRAMEWORK PROGRAMME

GC.SST.2012.2-3 GA No. 321592

European LNG/L-CNG technology

Deliverable No. LNG-BC D3.1


Deliverable Title European LNG/L-CNG technology

Dissemination level Public


Written By Yanouch BAUX (GNVERT) 15/10/2013
Checked by Milagros Rey Porto (GNF) 11/11/2013
Approved by Xavier Ribas (IDIADA) 13/11/2013
Issue date 13/11/2013
Executive summary

This report describes the technology of LNG and LCNG refueling stations based on existing stations.

LNG stations are mainly based on a tank which contains the LNG.

This tank delivers the LNG to the truck via a dispenser. Between the tank and dispenser, some stations
may have a cryogenic pump for faster filling but it is not mandatory.

Designing a typical station is quite difficult as the dimensions of the tank or the need for a pump
depends on the customer. Considering the survey made, latest stations are with the following
configuration:

- One 60m LNG tank


- One cryogenic pump
- One dispenser delivering 2 different pressures ( 8 or 16 bar)
- An L-CNG infrastructure

Anyway, an economical study has to be made regarding the different potential for delivering LNG and
CNG fuels.

Regarding the end user experiences, LNG is new and unfamiliar to the general public. All safety
procedures have to be taken into account, otherwise any accident at an LNG station could set the LNG
industry back a decade.

Page | 2
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

Contents
1 Introduction ...........................................................................................................................................................................4
What is the LNG BLUE CORRIDORS Project .......................................................................................................................4
2 General presentation ..........................................................................................................................................................6
2.1 LNG and L-CNG Station presentation ...............................................................................................................6
2.1.1 LNG Station .............................................................................................................................................................6
2.1.2 L-CNG Station ........................................................................................................................................................8
2.2 LNG and L-CNG Station technologies............................................................................................................ 10
2.2.1 Permanent station ............................................................................................................................................. 11
2.2.2 Mobile station ..................................................................................................................................................... 18
3 LNG Fuel stations in Europe ......................................................................................................................................... 22
3.1 Spain ............................................................................................................................................................................ 23
3.2 The United Kingdom ............................................................................................................................................. 24
3.3 The Netherlands...................................................................................................................................................... 25
3.4 Sweden ....................................................................................................................................................................... 26
3.5 Portugal ...................................................................................................................................................................... 27
3.6 Other European countries ................................................................................................................................... 27
4 End user experiences....................................................................................................................................................... 28
4.1 Safety and Training ................................................................................................................................................ 28
4.2 Feedbacks from customer ................................................................................................................................... 28
4.2.1 France ..................................................................................................................................................................... 28

LNG consumption ................................................................................................................................29

Drivers feedback ............................................................................................................................................................... 29


4.2.2 Germany ................................................................................................................................................................ 30
4.2.3 Spain ....................................................................................................................................................................... 32
5 Conclusion ........................................................................................................................................................................... 33

Page | 3
1 Introduction
What is the LNG BLUE CORRIDORS Project
The Blue Corridors projects aim is to establish LNG as a real alternative for medium & long distance
transport - first as a complementary fuel and later as an adequate substitute for diesel.

Up to now the common use of gas as fuel was for heavy vehicles running on Natural Gas (NG) only for
municipal use, urban buses and garbage collection trucks. In both types of application engine
performance and autonomy are good with present technologies, being well adapted to this alternative
and cleaner fuel.

However analyzing the consumption data, the equivalence in autonomy of 1 liter of diesel oil is 5 liter
of CNG, compressed to 200 bar. Five times more volume of fuel prevents the use of CNG in heavy road
transport, because its volume and weight would be too big for a long distance truck.

This opens the way for LNG (Liquefied Natural Gas), which is the way to transport natural gas by ship to
any point of the globe. NG liquefies at 162 C below zero, and the cost in energy is only 5% of the
original gas.
This state of NG gives LNG the advantage of a very high energy content. Only 1,8 liter of LNG are
needed to meet the equivalent autonomy as using 1 liter of diesel oil.

A 40 ton road tractor in Europe needs a tank of 400 to 500 liters for a 1.000 km trip; its equivalent
volume with liquid gas would be 700 to 900 liters of LNG, a tank dimension that could be easily fitted
to the lateral of the truck chassis. LNG is therefore opening the use of NG to medium and long
distance road transport.

LNG has huge potential for contribution to achieving Europes policy objectives such as the

Commissions targets for greenhouse gas reduction, air quality targets, while at the same time reducing
dependency on crude oil and guarantying supply security. Natural gas heavy duty vehicles already
comply with Euro V emission standards and have enormous potential to reach future Euro VI emission
standards without complex exhaust gas after treatment technologies, which cause increasing
procurement and maintenance costs.

Page | 4
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

To accomplish its objective it has defined a roadmap of LNG refueling

points along four corridors covering the Atlantic area (green line), the
Mediterranean region (red line) and connecting Europes South with the
North (blue line) and its West and East (yellow line) accordingly. In order to
implement a sustainable transport network for Europe, the project has set
the goal to build approximately 14 new LNG stations, both permanent and
mobile, on critical locations along the Blue Corridors whilst building up a fleet of approximately 100
Heavy Duty Vehicles powered by LNG.

This European project is financed by the Seventh Framework Programme (FP7), with the amount of 7.96
M (total investments amounting to 14.33 M), involving 27 partners from 11 countries.

LNG Blue Corridors Project is supported by the European Commission under


the Seventh Framework Programme (FP7). The sole responsibility for the
content of the website lies with the authors. It does not necessarily reflect the
opinion of the European Union. Neither the FP7 nor the European
Commission are responsible for any use that may be made of the information
contained therein

Page | 5
2 General presentation
2.1 LNG and L-CNG Station presentation
2.1.1 LNG Station
The LNG refueling system, using a liquid natural gas (or liquid biogas) storage tank, allows
refueling of liquefied gas at pressures up to 20 bar.

Figure 2-1 Example of a flow scheme of an LNG Station

As described above, a LNG station is mainly composed of a vaporizer, an LNG tank and a
dispenser.
Some stations operate without a LNG cryogenic pump which implies a slightly lower flow rate
and sometimes a higher storage pressure (around 12 bar compared to 3 or 8 bar).
LNG is delivered at different pressures according to the truck manufacturer: it may be 3, 8 or
18 bar: Unfortunately, not all stations deliver the full range of existing pressures.

Figure 2-2 FordonGas LNG Station in Sweden


Page | 6
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

The capacity of the tank is generally a function of its use. It may be a 10m storage
corresponding to approximately 4.5 T or less than 30 truck refilling. Otherwise, it may be
60m (or more) which may refuel 200 trucks.

The table below shows the general technical specifications of LNG components from the
main suppliers in Europe:

Working
ITEMS Capacity Pressure Flow rate Manufacturers
(bar)

CHART, INDOX, VRV,


Storage 10 to 70m 3 to 20 bar
CRYOLOR, CRYOVAT
Cryogenic Pump 20 to 84kg/min Vanzetti, Cryostar, Messer
Vanzetti, Cryostar,
INDOX/Cetil, HAM, Ballast
3, 8, 13, 15 According to pump
Dispenser Nedam, Cryonorm Projects,
& 18 bar or the process
Chart, Liquiline, Indox/LNG
Europe, Road Gas
Parker Kodiak, JC CARTER,
Nozzle
Macrotech

Figure 2-3 Dispenser from Cryostar with Parker Kodiak nozzle

Page | 7
2.1.2 L-CNG Station

A LCNG fueling station compresses liquefied natural gas (or biogas) up to 300 bar in order to
fuel CNG vehicles.

Figure 2-4 Example of flow diagram of an L-CNG Station with High pressure LNG pump

An L-CNG station is a CNG station except that the gas comes from an LNG tank and is
compressed at more than 200 bar at a liquid phase. Then the pressurized liquid is vaporized
and heated to become gas. The gas is odorized (if it is required due to national regulations)
and stored in high pressure vessels before being delivered.

Another way to obtain CNG from an LNG Tank is that LNG is directly vaporized / heated from
the tank, then goes through an odorizer and the gas is finally compressed by a standard gas
compressor. This solution can be advantageous if the operator does not want to maintain a
liquid cryogenic compressor but it consumes more electrical energy for the same capacity.

Page | 8
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

The table below shows the general technical specifications of L-CNG components from some
suppliers in Europe:

Working
ITEMS Capacity Pressure Flow rate Manufacturers
(bar)

CHART, INDOX, VRV,


Storage 10 to 70m3 6 to 18 bar
CRYOLOR, CRYOVAT
Cryogenic Up to
692 to 1400Nm3/h Vanzetti, Cryostar, Messer
Compressor 300bar
NANOBOX GALILEO, CETIL,
Up to
CNG compressor All ranges SAFE, BRC, ASPRO and all
300bar
standard CNG compressors
Dresser Wayne, Elettrogas,
Dispenser Max 100 kg/min Fornovogas, Meurs B.V.,
SAFE

Figure 2-5 L-CNG filling station in Poirino, Italy

Page | 9
2.2 LNG and L-CNG Station technologies

There are several designs of refueling stations with different level of technology.
The chart below summarizes different configurations of LNG station with mean options:

Station Configuration Advantages Disadvantages

Cryogenic storage tank + LNG


Venting to
dispenser with mass meter + Lower CAPEX and
Fixed station atmosphere, requires
payment system + one control maintenance cost
regular customers
panel
Boil-off recovery system Improve performance &
Optional
safety (no venting)
Higher CAPEX &
Optional Cryogenic centrifugal pump Higher flow of rate
OPEX
Optional Nitrogen tank cooling system No venting Operational cost
Different pressure Refuel all kind of LNG
Optional Cost
management trucks
The station may deliver
Cost,
Optional L-CNG 2 fuels: LNG & CNG
Need CNG customers
High flow rate
Safety, as all valves
Cryogenic storage tank + LNG Flexibility of a mobile are handled manually.
Mobile station
pipe solution.
Requires an operator
LNG dispenser with mass
Optional meter/ payment system / Automatic system Cost
control panel
The station may deliver As mobile station, the
Optional L-CNG
2 fuels: LNG & CNG flow rate is limited

The following states some examples of LNG and L-CNG station configurations.

Page | 10
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

2.2.1 Permanent station

Station type A

A station will refer to the more simple station based on the following main equipment:
One cryogenic storage tank.
One LNG dispenser with mass meter and payment system.
Control panel based on PLC (located in safe area or Atex box).

Figure 2.6. Station type A

In this station LNG is transferred by means of differential pressure, so no transfer pump is


required. LNG is stored at about 7 to 11 bar, which means gas phase in the tank will be at
slightly higher pressure. A programmable logic controller (PLC) validates the vehicle and
controls the refueling process with no intervention by the driver except connecting and
disconnecting the filling hose.

Advantages Limitations

Low capital and operational costs. Not capable for high pressure trucks.
Low space requirements. Dispenser cannot be located far away from
tank as there is not pumping system.
Since it is not possible to recover the boil-
off from tank, it must be properly designed
(control system) to specific requirements
(custom design).

Page | 11
Station type B

This station upgrades the A type with a boil-off recovery system, which means:

Possibility to supply CNG from the same station to cars or medium powered trucks.
Using boil-off makes station more flexible at attending LNG demand (a minimum
number of LNG trucks is not required).

Figure 2.7:. Station type B.

Plant configuration is based on the following equipment:

Cryogenic LNG storage tank.


One LNG dispenser with mass meter and payment system.
Odorizing system.
CNG compression units featuring:
o Gas Compressor with blowdown vessels
o High pressure storage vessels
o CNG dispenser
Control panel based on PLC (located in safe area).

Page | 12
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

Advantages Limitations

Medium capital. Not capable for high pressure


Low space requirements. trucks.
Possibility to supply CNG vehicles. LNG Dispenser cannot be allocated
Doesnt require a minimum number of far away from tank.
LNG trucks. Moderate operational costs
(compressor).

Station type C

Station referred as C type changes the transfer system of LNG by using a cryogenic
centrifugal pump.
Differential pressure given by the pump makes also possible to refuel on several dispensers
at the same time and they could be placed farther away.

Figure 2.8 Station type C

Plant configuration in this case is based on the following equipment:


Cryogenic LNG storage tank
Centrifugal cryogenic pump
LNG dispenser
Control panel based on PLC (located in safe area).

Page | 13
Advantages Limitations

LNG dispenser does not need to be nearby Moderate-high investment cost.


the storage tank. Moderate operational cost.
High LNG refueling capacity (several Not capable for high pressure trucks
dispensers can be served at same time). Since it is not possible to recover the
boil-off from tank, it must be properly
designed (control system) to specific
requirements (custom design).

Station type D

Station referred as D type refers to an upgrade of type C with a boil-off recovery system as
type B.

Figure 2.9 Station type D

Page | 14
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

Plant configuration in this case is based on the following equipment:

Cryogenic LNG storage tank


Centrifugal cryogenic pump:
LNG dispenser
Odorizing system.
CNG compression units
Control panel based on PLC (located in safe area).

Advantages Limitations:
Limitations

LNG dispenser doesnt need to be


nearby the storage tank Moderate-high investment cost

High LNG refueling capacity (several


dispensers can be served at same
time). Moderate operational cost
Possibility to supply CNG vehicles Not capable for high pressure
trucks
Doesnt require a minimum number of
LNG trucks, if the CNG sales volume is
appropriate

Station type E

The last station example consists of integrating a station able to provide LNG at different
equilibrium pressures so multiple types of trucks can be refueled.
One of the principles is to include a system which enables saturation of the LNG prior to
refueling between the pump skid and the dispenser. This system may be repeated to obtain
several filling pressures. Then, the 3 bar storage pressure can be increased at 7/8bar which
can also be increased at 18 bar.

Additionally, instead of using a compressor, CNG is obtained by compressing LNG up to 300


bar with a piston pump.

Page | 15
As liquids are much less compressible than gases, compressing a liquid is a more efficient
process requiring less energy. As a rule of thumb, a 22 KW piston pump is able to deliver
about 700 Nm3/h at 300 bar. To do the same work by compressing gas, a compressor with
about 100 KW of power is required.

Once the liquid is compressed (usually at 300 bar), it is regasified by using ambient
vaporizers designed for high pressure service (usually up to 400 bar). In this case odorization
needs to be done at high pressure by using an injection system with metering pumps. So,
this station is able to serve a wide number of CNG vehicles with lower power consumption
and with relatively low maintenance costs.

This station is also designed with an ordinary gas compressor but in this case the main
function of that compressor is to take boil-off filling the CNG storage. Not being linked with
the vehicle supply this compressor is very small (about 7 KW).

Figure 2.10 Station type D

Plant configuration is based on the following equipment:

Cryogenic LNG storage tank.


Centrifugal cryogenic pump
LNG dispenser with mass flow meter and electronic display.

Page | 16
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

Boil-off recovery compressor


Cryogenic piston pumps
High pressure ambient vaporizer in aluminum finned pipe with internal stainless steel
pipe.
High pressure odorized injection system.
CNG storage cylinders
CNG dispenser with mass flow meter and electronic display.
Control panel based on PLC (located in safe area).

Advantages Limitations

Possibility to refuel all kind of LNG trucks. High investment cost.


LNG dispenser does not need to be
High operational cost.
nearby the storage tank.
High LNG refueling capacity (several
dispensers can be served at same time).
High CNG refueling capacity.
Doesnt require a minimum number of
LNG trucks, if the CNG sales volume is
adequate.

The following examples are focused on mobile station configuration.

Page | 17
2.2.2 Mobile station

Mobile Station type 1

This is the simplest mobile station. The station can be installed on a 20 or 40 platform.

Where following equipment will be installed:

Cryogenic ISO container 20 or 40


Manual valves and hose/nozzle
Cryogenic pump can be installed

Figure 2.11: Mobile Station type 1 (from Rolande LNG BV)

Figure 2.12 : Mobile Station type 1 (from Gazprom Germania operated by GasCom)
Page | 18
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

Advantages Limitations

Very low capital and operational costs. Need an operator


Low space requirements. No weights and measures
Flexibility due the mobile concept. homologation
More easy to obtain approvals (risk Not capable for high pressure trucks.
assessment) being an ADR vehicle. Because it is not possible to recover the
No power supply needed boil-off from tank, it requires to be
If cryogenic pump is installed it must be properly designed (control system) to
operated by an external power supply or specific requirements (custom design).
by the hydraulic drive of the truck cab However, boil off is less critical if a
No approvals for operation required pump is used to refuel the truck.
immediate implementation permitted for Without a cryogenic pump, the refueling
up to 12 months. is done by increasing the temperature
If cryogenic pump is installed, a vent back of the fuel in the storage tank, thereby
line can recover the gas phase from the increasing its pressure.
vehicle to the tank of the filling station.

Station type 2

This type 2 station is basically the same as the type 1, with a dispenser.
The station is intended to be installed on a 40 platform. Where following equipment will be
installed:
Cryogenic ISO container 20 (approx. 18.000 lts), 18-20 bar MAWP.

LNG dispenser.

Control panel designed for classified area.

Cryogenic pump can be installed

Page | 19
Figure 2.12: Station type A.M.

This plant will require a power supply system specifically designed in accordance with ATEX
requirements and local regulations.

Advantages Limitations

Very low capital and operational costs. Not capable for high pressure trucks.
Low space requirements. Being not possible to recover the boil-
Flexibility due the mobile concept. off from tank, it requires to be properly
More easy to obtain approvals (risk designed (control system) to specific
assessment) being an ADR vehicle. requirements (custom design).
Fully automatic However, boil off is less critical if a
If cryogenic pump is installed it must be pump is used to refuel the truck.
operated by an external power supply or Without a cryogenic pump, the refueling
by the hydraulic drive of the truck cab is done by increasing the temperature
No approvals for operation required of the fuel in the storage tank, thereby
immediate implementation permitted for increasing its pressure.
up to 12 months.
If cryogenic pump is installed, a vent back
line can recover the gas phase from the
vehicle to the tank of the filling station.

Station type 3
Page | 20
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

This third type is the most advanced mobile station which combines LNG and L- CNG.

Figure 2.13: Mobile unit from Ham

The mobile unit can supply natural gas in different modes:


Gas Phase at 250 bar for CNG application
Liquid phase at 8,5 bar of equilibrium for LNG Vehicular applications

Advantages Limitations

Possibility to refuel all kind of LNG trucks Since it is not possible to recover the
LNG dispenser doesnt need to be nearby boil-off from tank, it requires to be
the storage tank. properly designed (control system) to
Low capital and operational costs. specific requirements (custom design).
Low space requirements.
Flexibility due the mobile concept.
CNG refueling capacity.
Doesnt require a minimum number of
LNG trucks.

Page | 21
3 LNG Fuel stations in Europe
LNG and L-CNG refueling stations are mainly in Spain, UK, the Netherland, Sweden and
Portugal as tagged in the map below:

Figure 3-0 LNG and L-CNG Stations in Europe

Page | 22
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

3.1 Spain
Spain is undoubtedly the pioneer in Europe of LNG as fuel. Indeed, in 2000, the Spanish
transporter, HAM, purchases from the US, 10 truck tractors powered with Liquefied Natural
Gas, what made them the leader in its use for the transport in Europe.
Nowadays, this country counts over 16 fixed stations, delivering LNG and L-CNG. Other
stations are under developments within GARnet TEN-T EA project and FP7 LNG Blue
Corridors Projects.
Public and private refilling stations are stated below:
No. Refueling station Natural Gas Fuel Owner and Operator

1 Abrera, Barcelona LNG & L-CNG HAM


2 Castellon de la Plana, Castellon LNG & L-CNG MONFORT
3 Torremocha del Campo, Guadalajara LNG & L-CNG HAM
4 Olaberria, Guipizcoa LNG & L-CNG GN TRUCK/VICUNA
5 Lleida, Lleida LNG & L-CNG GNF
6 Tarragona LNG & L-CNG BIONET/HAM
7 Alovera, Guadalajara LNG & L-CNG J. SANTOS/GNF
8 Vitoria, Alava LNG & L-CNG EUROCAM/GNF
9 Valencia LNG & L-CNG DISFRIMUR VALENCIA/GNF
10 San Isidro, Alicante LNG & L-CNG DISFRIMUR ALICANTE/GNF
11 Riba Roja del Turia LNG & L-CNG GNF
12 Zaragoza* LNG & L-CNG VIA AUGUSTA GAS
13 Rivas, Madrid* LNG & L-CNG GHC/GNF
14 Montilla del Palancar, Cuenca* LNG & L-CNG MONEGAS/GNF
15 Sevilla* LNG & L-CNG PREMIUM/GNF
16 Malaga LNG & L-CNG VILLANUEVA/GNF
* Stations built in 2013.

Technically, these stations are equipped with


30 or 60m tank storage and the filling
pressures are from 8 to 18 bar. Some
stations, such as in Tarragona, Motilla del
Palancar or Ribarroja del Turia, are not
equipped with a cryogenic pump.
F
Figure 3-1 Ham LNG Station in Tarragona

Page | 23
3.2 The United Kingdom
With 9 LNG refilling station, the United Kingdom is a high LNG developing country in Europe.
No data are available about L-CNG refilling stations.
Some public and private refilling stations are stated below:

No. Refueling station Natural Gas Fuel Owner and Operator

1 Daventry LNG Gasrec


2 Warrington LNG BOC Gases / Stobart Group
3 Nottingham LNG Portal Gas Group (Hardstaff)
4 Tebay LNG Chive Fuels
5 Castleford LNG Chive Fuels
6 Carlisle LNG Chive Fuels
7 Londonderry LNG Chive Fuels
8 Middlesborough LNG BOC Gases
9 S. Yorkshire LNG BOC Gases / DHL Bawtry

These stations are equipped with 6 to 29T (13 to 65m) LNG storage.

In May 2013, Gasrec opened the first Bio-LNG stations in the UK.
Bio-LNG is a natural, green source of renewable energy produced from organic matter such
as household food waste. Gasrec is Europes largest producer of this fuel.

Figure 3-2 Gasrec LNG Station in Daventry

Page | 24
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

3.3 The Netherlands


The Netherlands count over 8 operating LNG fuelling stations and more than 100 LNG-
fuelled trucks on the road. The Nationaal LNG plateform highlights the high potential of
LNG in the Netherlands and ensures that by 2015, 500 trucks will be fuelled with LNG.

Public and private refilling stations are stated below:

No. Refueling station Natural Gas Fuel Owner and Operator

1 Oss, N. Brabant LNG Vos Logistics


2 Oss, N. Brabant LNG & L-CNG Rolande LNG B.V.
3 Tilburg, N. Brabant LNG & L-CNG Rolande LNG B.V.
4 Amsterdam, N. Holland LNG Simon Loos
5 Zwolle, Overijssel LNG & L-CNG Salland Ollie/LNG 24
6 Delfgauw LNG Albert Heijn
7 Utrecht, Utrecht LNG Rolande LNG B.V.
8 Duiven LNG LNG Solutions GDF SUEZ

These stations feature a large range of storage capacities, from 10 to 70m, with different
filling LNG pressures 3 to 18 bar. Probably the very first in Europe, the station in Duiven, built
by LNG Solutions GDF SUEZ, delivers LNG at 3, 7 or 18 bar with one dispenser.

Figure 3-3 LNG24 LNG Station in Zwolle with Ballast Nedam technology

Page | 25
3.4 Sweden

Sweden counts over 5 refueling stations.

Public and private refilling stations are stated below:

No. Refueling station Natural Gas Fuel Owner and Operator

1 Gteborg, Stig Center LNG & L-CNG Fordonsgas


2 Jrna, Sdertajle LNG & L-CNG Statoil/AGA
3 Malm LNG Preem/EON
4 lvsi LNG AGA Gas AB
5 Jnkping, Finnvedens Lastvagnar LNG & L-CNG Fordonsgas

These stations are equipped with 60m tank storage and the filling pressures are from 6 to
12.5 bar.

The NGVA Europe reports that there are 9 further L-CNG (only) stations in Sweden operated
by AGA, EON, the City of Uppsala and the Swedish Biogas.

Figure 3-4 Fordongas LNG Station in Gteborg

Page | 26
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

3.5 Portugal

GoldEnergy has built a gas complex including LNG/L-CNG refueling station in Mirandela,
Tras os Montes. Unfortunately, no data is available about this station.

Figure 3-5 GoldEnergy LNG Station in Mirandela

Galp Energia aims to build 2 LNG stations in Lisbon and Porto. With storages of 20m and
60m, the stations will deliver LNG at 8 and 16 bar.

3.6 Other European countries

Excepted that in Italy where 6 L-CNG stations (in Villafalletto - Cuneo, Poirino - Torino,
Tortona - Alessandria, Varna Bolzano , Calderara di Reno - Bologna, and Roma) are built
and can easily be adapted for an LNG distribution, there are no operating LNG stations in
Belgium, France, Germany, Slovenia and Croatia. Missing type approvals for LNG vehicles
in most of these countries delay necessary investments to the infrastructure. If that obstacle
will not be overcome in the next months, the whole project will fail! At least the planned time
schedule must be extended. The distances between countries that already have some
refueling infrastructure are too long to create the defined corridors for a trans-European
network.

Page | 27
4 End user experiences

4.1 Safety and Training


LNG & L-CNG stations are mainly built according to local regulations. All safety measures
cannot be gathered in one document as these differ from one country to another or even by
the individual supervising authorities. Missing or incomplete national regulations require
individual approvals, causing inappropriate implementation phases and inflating costs.

One common point is that added to the instructions on how to fuel a vehicle displayed at the
dispenser, only trained persons are allowed to fuel a vehicle. The trainee is especially
focused on safety procedures, actions in emergency situations and fueling procedures.

Personal protective equipments are mandatory against potential spray of LNG (the risk of
skin and eye burns on contact), for which the minimum requirements are gloves and face
shield,

4.2 Feedbacks from customer


4.2.1 France
Generally, feedbacks from customer are relatively good.
Further to some tests held in the south of France with a transporter, the following feedbacks
from one IVECO truck Stralis 330cv has been made.
The context of the tests was as followed:
During the first part of the trial that lasted 2 weeks, the truck was running night and day
and travelling 400km per day with a relatively medium load on the portage of the truck.
For the second part of the trial that lasted 2 weeks, the truck was running at full load on
highway and travelled 1000km per day.
During the trial, several parameters either quantitative or qualitative were monitored:
The consumption of the truck according to the load and the profile of the road (flat or
sharp)
Noise and perception of the drivers
The comfort of driving
Engine brake
Acceleration

Page | 28
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

Acceleration at low speed and low torque


Gear box

LNG consumption

According IVECO, the expected consumption of the truck is 35kg/100km. The measurement
of the consumption was lower and in average close to 27-28kg/100km. But the consumption
varied significantly with the profile of the road. In a hills area, the consumption reached
35kg/100km. A second parameter that has an incidence on the consumption was the
behavior of the driver. Finally, the load of the truck has also an influence on the consumption.
The figure hereafter is indicated how was varying the consumption profile according to the
load of the truck.

Figure 3-5 Consumption profile according the load of the truck

Drivers feedback

Qualitative parameters were marked by the 4 drivers that have participated to the trial. All
drivers gave a note for each parameter according a reference that is a diesel engine truck of
the same category.

Page | 29
Figure 3-5 Qualitative parameters quotation results

Noise
Noise: the truck is very quite with almost no vibration whatever the speed is. Time to
time when stopped, drivers opened the window to hear if the engine was still running!
At very high engine speed, often used at full load while climbing a sloppy road, the
noise was comparable to the one of diesel with less vibration.
Acceleration:
Acceleration the feeling of acceleration was more important mainly due to the fact
that it was recommended to run the truck at high engine speed.
Driving comfort:
comfort Drivers appreciated the lack of noise and vibration. The drive of the
truck was perceived as softer than the one with a diesel engine.
Engine brake
brake: the engine brake is much less efficient than the one of a diesel engine.
Gear box:
box the use of a gear box was very well accepted.

4.2.2 Germany
In cooperation with Volvo Truck Center Berlin and Gazprom Germania, erdgas mobil
conducted a test run with one 460 HP Volvo EURO-V dual fuel truck at ACT Abfall
Container Transport, a subsidiary of Alba Group. ACT operates a HDV-fleet in the waste
management business. From April 15th to May 10th 2013 this vehicle was operated for 18
days between the center of Berlin and Schwedt a town located northeast of Berlin at the
German-Polish border. For one distance of 150 km the truck was loaded to its maximum load
of 40t with waste paper for recycling purposes. In total the truck was operated for 5.152 km.
This route is characterized by 15 percent city traffic, 25 percent state road and 60 percent

Page | 30
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

motorway. Furthermore, the route does not feature any unusual conditions, i.e. mountainous
geography, etc.
To refuel the truck a 6 ton mobile filling stations of Type 1 was installed at the facilities of

Volvo truck center Berlin. The station was equipped with a cryogenic pump, a vent back line,

a JC Carter nozzle and a manual control panel for billing.

The biggest challenge was to familiarize the driver with the refueling process. Due to the lack
of a permanent dispenser the driver had to learn to handle the different valves, connections

and the sequence of operation. It was necessary to assemble the refueling nozzle and vent
back line, to cool down the cryogenic pump for 30 minutes before refueling, and to
disassemble the equipment after refueling. Within three days and several trials the driver was

able to refuel the truck without any support or supervision.

Regarding drivability and handling the truck operator was totally satisfied with the vehicles
performance: No difference to a familiar diesel truck. However, the refueling process was a
bit intimidating at the beginning. After he understood the refueling process he became used
to it. Knowing that at least a semi-mobile station would be equipped with a fixed dispenser,

ACT is interested to acquire more Volvo dual fuel trucks. During normal operation the truck
would have been operated for two or three shifts leading to a daily mileage of 600 to 900 km
per day. Although the diesel substitution rate was with 36 percent (11.16 kg/100km), below
expectations, the project partners already agreed to choose an area at the ACT facility to

build a first semi-mobile filling station.

Before this goal can be realized, the project team is faced with two major obstacles. First,

ACT plans to replace only one to two trucks per year, leading to an insufficient LNG

consumption at least for the first half of the depreciation period of the refueling infrastructure.
Therefore, a competitive fuel price cannot be offered to ACT. However this obstacle could be

overcome if more fleet operators become interested in acquiring more LNG vehicles.

Unfortunately, no LNG trucks can receive a national type approval; the test vehicle was

registered in Sweden. This is the reason why Volvo does not offer this type of alternative

fueled vehicle in Germany. The next challenge for dual fuels is to meet the EURO-Vl exhaust

Page | 31
limitations, especially the HC emissions. After that challenge is technically solved, the vehicle

has to remain competitive compared to normal Diesel powertrains.

4.2.3 Spain
Generally, feedbacks from users are relatively good.

Two partners of the project, who are fleet operators, provided their feedback: Monfort and
HAM.

Monfort

Noise
Noise: the trucks are less noisy than the diesels, both in case of the otto and dual fuel
natural gas engines.
Acceleration:
Acceleration the feeling of acceleration was in line with the diesels in case of duals,
and good feeling of acceleration of the ottos, but they need to be used at higher
speeds.
Driving comfort:
comfort Drivers appreciated the comfort of the vehicles, at the same level of
diesels.
Engine brake
brake: similar to diesel engine.
Gear box:
box Volvo and Mercedes trucks are available with automatic gearbox, while
others are available only in manual configuration. Scania has a torque converter
which works properly.

HAM

Noise
Noise: Dual fuel engines are slightly less noisy than the diesels and dedicated
engines are less noisy.
Acceleration:
Acceleration the feeling of acceleration was lower both in case of duals and
dedicated engines.
Driving comfort:
comfort At the same level of diesels.
Engine brake
brake: slightly less when compared to diesel engines.
Gear box:
box Same as in diesel.

Page | 32
LNG-BC D3.1 state of LNG and LCNG filling stations technologies in Europe
Public

5 Conclusion

As a conclusion, designing a typical station is quite difficult as the dimension of the tank or
the need of a pump will depend on the customers demand and the LNG supply. This itself is
a function of LNG turnover per time unit, expected CNG-sales volume, lead time to refuel the
LNG storage from the next harbor, tank rhythm, and public or limited access

Considering the survey made, the latest stations are with the following configuration:

- One 60m LNG tank


- One cryogenic pump
- One dispenser delivering at least 2 different pressures ( 8 or 16 bar)
- An L-CNG infrastructure

Anyway, to settle the design, an economic study has to be made regarding the boil-off
management, the customer needs, the number of trucks, the type of the trucks and the
location.

Page | 33