Вы находитесь на странице: 1из 29

Kuliah-15

PERALATAN KOMPLESI

Dosen : Ir. Andry Halim, MM


Universitas Trisakti
Objective/Sasaran
j

Memahami konsep-konsep Komplesi sumur dan kerja ulang


sumur
Memahami teknik perencanaan dan penyelesaian sumur
Memahami penerapannya di dunia Perminyakan
Daftar Pustaka

Allen S.O. and Robert A.P. Production Operation, Vol. I


Oil and Gas Consultant International Inc.
Chip Claiborne,Unocal Completions Training
Perforating, 2005
Peter E. Clark,Well Completions : Stimulation and Work
Over.
Pertamina Hulu, Teknik Produksi, Jakarta, 2003
H.K. Van Poolen,Well Completion and Stimulations
Program.
g
Peter E. Clark,Well Completions : Stimulation and Work
Over.
Jonathan Billary,Well Completions Design,
PetroleumElsevier 2009
PetroleumElsevier,
Semua buku perihal Komplesi dan uji Sumur
Semua Jurnal tentang Komplesi dan uji Sumur
What is a Completion?

Equipment Installed in a Well to Allow


Hydrocarbons to be Produced

Control Production Interval


Control Production Rate
Isolate Wellbore from Producing Zone
Isolate Formation Damage
Isolate Non-Producing Zones
Drilling Completion Production

Information Completion
Management, Fluids Automated Production
Drillingg Engineering,
g g, Systems
Data Mudlogging, Drilling Dynamics
Rig-Site Supervision
Safety Systems
Drilling Fluid Systems

Performance
Pumping,
Chemicals
Stimulation,
Filtration
Flow Control
Completion
Equipment
Hook-ups

Formation
Evaluation MWD Tubing Conveyed Packers
Perforating
Cementing
Equipment

Gravel
Packing
High Services Packers
Performance Bits

Steerable
Drilling
Systems

Pre-Pack Well
Screens
Packer

1
1. Packer adalah penyekat untuk completion/WO.
completion/WO Dibagi 2 : 1)
Production Packer. 2) Treating/testing Packer
2. Pemisahan ruang di well tujuannya :
1. Melindungi casing dr P tinggi baik dari well atau injeksi
dan fluida penyebab karat
2. Isolasi thd bocor yg ada di casing, perforasi yg di
squezed atau interval produksi yg lebih dari Satu
3. Menghilangkan efek heading & surging gas krn adanya
gas yg terakumulasi di annulus
4. Penggunaan untuk peralatan artificial lift
5. Akan dipasang safety valve
6. Menahan packer fluid di annulus
3. Jenis Packer
Umumnya dari karet dipadatkan u/ penyekat dg slip,
i fl t bl packer,
inflatable k cementt packer,
k dan
d packer k bore(polished
b ( li h d
bore) receptacle atau PBRS
1. permanent packer : u/ permanent completion, dimana
packer adalah bagian dr casing, tubing dipisahkan
ruangnya
g y & dptp diangkat
g
2. retrievable packer : adalah bagian dr tubing & tubing
tdk dpat dilepas dg packernya. Tubing akan melekat ke
casing selama packer belum lepas
Bagian-bagian dari Packer

bagian2 Packer
1. Seal element : yg menyekat anulus tubing/casing.
Dibuat dr elastomer atau asbestos yg dpt ditekan untuk
berubah bentuk waktu packer dipaki u/ mengisi ruang
antara mandrel dg dinding casing
2. Packer mandrel : badan utama packer yg terdiri dr
metal u/ jadi pegangan seluru komponen packer
3. Slips : Komponen mekanis packer dg bentuk gigi
gerigi yg menyentuh ID casing & mencegah gerakan
Packer
4. Cone : silinder tersusun (tappered) tempat masuknya
slip untuk menekan gerigi pd dinding casing
5. J slot: permukaan bergerigi berbentuk J yg
mengontrol gerakan slip relatif thd cone
6 Hydraulic
6. H d li Hold
H ld Down
D Button
B tt : alat l t hydraulist
h d li t
pencegah gerakan umtuk memegang mandrel di
tempatnya saat slip mulai kerja & memberi kekuatan
penahan tambahan
7. Backup p Ring
g:pper metal yg bisa mengembang
g g diatas
dan/atau dibawah seal element yg dipakai u/ menahan
pengembangan seal secr berlebihan
Packer Systems Applications

Isolate
I l t producing
d i zone
Tubing-to-casing seal
Increase well flow velocity
Well control
Corrosion control
A Typical BOT Packer

Permanent Packers
Retrievable Packers
Seal Assemblies
Production Assemblies
Production Valves
Setting
S tti Tools
T l
Seal Bores
Remedial Systems

z Retrievable Packers
z C
Cement t Retainers
R t i
z Bridge Plugs
z Wash Tools
z Accessories
Running g tools
Retrieving tools

Setting assemblies

Manifolds
Blast
J i t
Joint
Thru-Tubing Inflatable Packers

Tool can be set in casing below the


production tubing
Can run on coiled tubing, threaded
tubing,
g, or E-line
Cased Hole Completions

Safety Systems
A Typical BOT Flow Control Device
Sliding Sleeves- controls flow between
workstring and annulus
Profile
P fil Nipples-
Ni l allows
ll tools
t l tot be
b placed
l d in
i the
th
string by pumping or wireline
Blanking Plugs/Chokes- isolates or controls
fluid flow up workstring
Accessories
Running tools
Retrieving tools
Shifting tools
Sliding Sleeve Applications

Plug the tubing


I l t zones
Isolate
Check flow in either direction
Choke the flow in either
direction
Selectively communicate
between the tubing and the
annulus
A Typical Subsurface Safety Valve

Subsurface Safety systems are installed in the


wellbore as part of the completion.

Typically they are installed in the completion tubing


string a few hundred feet below the seafloor in
offshore applications. If the production platform were
damaged or destroyed, the well would be shut in
below the seafloor, preventing loss of the well and
pollution of the environment.

Controlled by surface hydraulic pressure, preset flow


differential, pressure drop.
Safety System Applications

Automatic Production Shut


Down in an Emergency

z Prevents catastrophic loss


of the Wellbore
z Environmental protection
z Personnel protection
z W ll flow
Well fl monitoring
it i
z Allows for safe remote
operation of the well
A Typical Surface Safety System
Shut In Controls:
Manual & Remote
Loss of Control Pressure
Pressure Drop
Well Requirements Evolution
Technology Progression

Single Zone Completion


z Common simple completion
z Single zone of interest isolated
z Production of oil and gas through the
completion
Technology Progression

Multiple Zone / Commingled Production


z Allows the operator to produce from
more than one zone at the same time
z A cost effective method of completion
p
Technology Progression

Dual Zone Completion


z Production from
f more than one
zone in the wellbore
z More complicated
M li t d completion
l ti
requirements
Horizontal Completion

Production from a Horizontal


Wellbore
Greater Exposure to the Producing
Formation
Reduces the number of wells
required
Multilateral Completion

z Production
P d ti from
f multiple
lti l zones
and multiple wellbore

z Significantly more complicated


completion
p requirements
q

z Emerging technology in
t d market
todays k t
Thru-Tubing Application

Run through existing tubing


and set inside the larger casing
below

Eliminates the need to


remove the Completion
equipment

Ability to build a new


Wellbore without a rig
Technology Advancements

The Future of
Completions..
A Vision for the Next Century
Question ??