Вы находитесь на странице: 1из 24

CALCULATION SHEET

Project Name: JABER HOSPITAL Date: Job No.


Main Hospital Building 27/07/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Cooling Tower Make Up Pump HPS-01 Sizing SJN
Reference Calculations Output

Cooling Tower Make-Up Pump HPS-1


Location: Basement (-9.53 level)
Application: To pump water from HVAC Make UpTank(-9.53 level) to Cooling Tower at -2.0 level
Pumps set : 3 pumps in one set, Three working ,each pump capacity is 40 m3/hr(1 Set is working 1 Set standby)
- Static Head = 23 m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)

= 990 Kg/m @45 C


- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes

Pipe Size- Total


Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
D(mm) Length***
11 E-90 53.57
2 TEE 18.28
1-2 150 174 529 1.88 3 G.V 6.39 270.54 182.23 49.30
0 E-45 0
1 C.V 18.3

49.30

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.

- Total Friction Losses in pipes and fittings = 49.30 Kpa = 0.49 Bar = 4.93 m
'- Total Pump Head required = 23 + 10 + 4.93
= 37.93 m = 3.79 Bar
= 37.93 M Say 38 mtr

Selected pump 40 m3/hr @ 50 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 27/07/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Transfer Pump TR-3 Sizing SJN
Reference Calculations Output

Transfer Pump TR-3


Location: Basement (-9.53 level)
Application: To pump water from Break Water tank(-9.53 level) to HVAC Make up Tank(-9.53 level)
Pumps set : 4 pumps, Three working and one standby,each pump capacity is 30 m 3/hr
- Static Head = 7m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)

= 990 Kg/m @45 C


- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes

Pipe Size- Total


Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
D(mm) Length***
7 E-90 42.7
0 TEE 0
1-2 200 153 397 0.79 216.8 26.37 5.72
1 G.V 2.1
1 C.V 19

5.72

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
Pressure drop in Sand filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 5.72 Kpa = 0.06 Bar = 0.57 m
'- Total Pump Head required = 7 + 10 + 0.57 + 5
= 22.57 m 15 2.26 Bar
= 22.57
= 22.57 M Say 23 mtr
Selected pump is 30m3/hr @ 25 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 27/07/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Transfer Pump TR-1 Sizing SJN
Reference Calculations Output

Transfer Pump TR-1


Location: Basement (-9.53 level)
Application: To pump water from Break Water tank(-9.53 level) to Potable & Fire Water Tank(-9.53 level)
Pumps set : 4 pumps, Three working and one standby,each pump capacity is 30 m 3/hr
- Static Head = 7m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)

= 990 Kg/m @45 C


- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes

Pipe Size-
Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
D(mm)
3 E-90 18.3
1 TEE 9.2
1-2 150 61 397 1.41 109.6 107.09 11.74
1 G.V 2.1
1 C.V 19

11.74

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
Pressure drop in Sand filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 11.74 Kpa = 0.12 Bar = 1.17 m
'- Total Pump Head required = 7 + 10 + 1.17 + 5
= 23.17 m = 2.32 Bar
= 23.17 Say 23.5 mtr
=
Selected pump is 30m3/hr @ 25 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 27/07/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Transfer Pump TR-2 Sizing SJN
Reference Calculations Output

Transfer Pump TR-2


Location: Basement (-9.53 level)
Application: To pump water from Break Water tank(-9.53 level) to HVAC Make up Tank(-9.53 level)
Pumps set : 4 pumps, Three working and one standby,each pump capacity is 30 m 3/hr
- Static Head = 7m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)

= 990 Kg/m @45 C


- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes

Pipe Size- Total


Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
D(mm) Length***
6 E-90 36.6
1 TEE 9.2
1-2 150 110 397 1.41 176.9 107.09 18.94
1 G.V 2.1
1 C.V 19

18.94

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
Pressure drop in Sand filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 18.94 Kpa = 0.19 Bar = 1.89 m
'- Total Pump Head required = 7 + 10 + 1.89 + 5
= 23.89 m = 2.39 Bar
= 23.89 Say 24 mtr

Selected pump 30m3/hr @ 25 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
Reference Calculations Output

Booster Pump BP-3


Location: Basement at -9.53 Level Water Tank Building
Application: To pump water from basement to Residential building
Pumps set : 3 pumps in one set are working each pump capacity is 20 m3/hr '@ 65 Mtr Head(1 Set is working 1 Set standby)
- Static Head = 22.50 m
- Residual Pressure = 10 hose bib at highest level(+12.2mtr)
water closet comes +8.7 level onwards to down, where avilable pressure is 19.5 psi, which is more than enough to operate the fliush valve of W.C
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C)1.852 x (1 / D)1.167 x (r g)
Total flow of three pumps = 60 m3/hr

= 264 gpm = 1000 Kg/m


= 9.8 m/sec2
C = 150 For copper pipes

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
E-90 0
TEE 0
A -B 102.2 6.4 132 1.01 7.77 91.23 0.71
1 G.V 1.37
C.V 0
E-90 0
1 TEE 9.1
B-C 130.8 11.5 132 0.62 20.6 27.43 0.57
G.V
C.V
E-90 0
2 TEE 18.2
C-D 130.8 19.5 264 1.23 39.8 99.02 3.94
1 G.V 2.1
C.V
E-90 0
1 TEE 9.1
D-E 130.8 1 176 0.82 10.1 46.73 0.47
G.V
C.V
E-90 0
2 TEE 18.2
E-F 130.8 1 88 0.41 19.2 12.94 0.25
G.V
C.V
E-90 0
TEE 0
F-G 102.2 2 88 0.67 16.93 43.06 0.73
2 G.V 2.74
1 C.V 12.19
E-90 0
2 TEE 18.2
G-H 130.8 1 88 0.41 19.2 12.94 0.25
G.V
C.V
E-90 0
1 TEE 9.1
H-I 130.8 1 176 0.82 10.1 46.73 0.47
G.V
C.V

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
Reference 1 E-90 Calculations 6.1 Output
I-J 130.8 2 264 1.23 28.4 99.02 2.81
E-90 0
1 TEE 9.1
J-K 130.8 1 176 0.82 10.1 46.73 0.47
G.V
C.V
E-90 0
2 TEE 18.2
K-L 130.8 1 88 0.41 19.2 12.94 0.25
G.V
C.V
E-90 0
TEE 0
L-M 102.2 2 88 0.67 4.74 43.06 0.20
2 G.V 2.74
C.V
E-90 0
1 TEE 9.1
M-N 130.8 1 88 0.41 10.1 12.94 0.13
G.V
C.V
E-90 0
1 TEE 9.1
N-O 130.8 1 176 0.82 10.1 46.73 0.47
G.V
C.V
E-90 0
2 TEE 18.2
O-P 130.8 2 264 1.23 20.2 99.02 2.00
G.V
C.V
27 E-90 132.3
1 TEE 9.1
15 -14 130.8 775 264 1.23 936.8 99.02 92.76
1 G.V 2.1
1 C.V 18.3
4 E-90 19.6
1 TEE 9.1
14-13 130.8 173 264 1.23 201.7 99.02 19.97
G.V
C.V
15 E-90 45.6
1 TEE 6.4
13 - 12 102.2 147 255 1.95 199 308.87 61.46
G.V
C.V
4 E-90 12.16
1 TEE 6.4
12 - 11 102.2 9.7 255 1.95 G.V 0 28.26 308.87 8.73

C.V
3 E-90 6.9
1 TEE 4.6
11 - 10 73.6 22.1 155 2.29 33.6 607.89 20.43
G.V 0
C.V
E-90
1 TEE 3.65
10- 9 61.4 3 130 2.76 6.65 1061.08 7.06
G.V
C.V

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
Reference Calculations Output
E-90
1 TEE 3.65
9-8 61.4 2 124 2.63 5.65 972.17 5.49
G.V
C.V
E-90
1 TEE 3.65
8 -7 61.4 6.5 112 2.38 G.V 10.15 805.15 8.17

C.V
E-90
1 TEE 3.65
7 -6 61.4 2 102 2.16 5.65 677.10 3.83
G.V
C.V
E-90
1 TEE 3.65
6-5 61.4 6.5 94 1.99 10.15 582.04 5.91
G.V
C.V
E-90 0
1 TEE 3.65
5 -4 61.4 2 84 1.78 5.65 472.59 2.67
G.V 0
C.V
E-90 0
1 TEE 3.65
4- 3 61.4 6.5 74 1.57 10.15 373.72 3.79
G.V 0
C.V
E-90 0
1 TEE 3.04
3- 2 40.8 1 29 1.39 4.04 482.76 1.95
G.V 0
C.V
2 E-90 1.2
TEE 0
2- 1 20.4 12 3 0.58 13.48 211.50 2.85
1 G.V 0.28
C.V

258.79
- Total Friction Losses in pipes and fittings = 258.79 kpa = 25.88 mtr
Pressure drop in catridge filter = 2.54 mtr
Static Head = 22.50 mtr
Residual pressure = 10 mtr
Head avilable in the suction side due to to the height of water coumn in the tank = 3.5 mtr Catridge Filter SS-12 - three set being used for filteration
12 catridges in two layers inside the housing
Pressure drop (attached document) =0.042psi/gpm
- Total Pump Head required = 57.42 mtr Presure drop for 88 Gpm (one third of the total flow-264 gpm) =3.69psi
= 2.54 mtr

Selected pump of 20m3/hr @ 65 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
Reference Calculations Output

Booster Pump BP-3


Location: Basement at -9.53 Level Water Tank Building
Application: To pump water from basement to Residential building
Pumps set : 3 pumps in one set are working each pump capacity is 20 m3/hr '@ 65 Mtr Head(1 Set is working 1 Set standby)
- Static Head = 22.50 m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)

= 1000 Kg/m
- Friction Losses:- = 9.8 m/sec2
C = 150 For copper pipes

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
E-90 0
TEE 0
A -B 100 4 132 1.06 5.37 101.44 0.54
1 G.V 1.37
C.V 0
E-90 0
1 TEE 9.1
B-C 150 11.5 132 0.47 20.6 14.08 0.29
G.V
C.V
E-90 0
2 TEE 18.2
C-D 150 19.5 264 0.94 39.8 50.81 2.02
1 G.V 2.1
C.V
E-90 0
1 TEE 9.1
D-E 150 1 176 0.63 10.1 23.98 0.24
G.V
C.V
E-90 0
2 TEE 18.2
E-F 150 1 88 0.31 19.2 6.64 0.13
G.V
C.V
E-90 0
TEE 0
F-G 100 2 88 0.70 16.93 47.87 0.81
2 G.V 2.74
1 C.V 12.19
E-90 0
2 TEE 18.2
G-H 150 1 88 0.31 19.2 6.64 0.13
G.V
C.V
E-90 0
1 TEE 9.1
H-I 150 1 176 0.63 10.1 23.98 0.24
G.V
C.V
1 E-90 6.1
2 TEE 18.2
I-J 150 2 264 0.94 28.4 50.81 1.44
1 G.V 2.1

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
I-J 150 2 264 0.94 28.4 50.81 1.44
Reference Calculations Output
C.V

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
Reference Calculations Output
E-90 0
1 TEE 9.1
J-K 150 1 176 0.63 10.1 23.98 0.24
G.V
C.V
E-90 0
2 TEE 18.2
K-L 150 1 88 0.31 19.2 6.64 0.13
G.V
C.V
E-90 0
TEE 0
L-M 100 2 88 0.70 4.74 47.87 0.23
2 G.V 2.74
C.V
E-90 0
1 TEE 9.1
M-N 150 1 88 0.31 10.1 6.64 0.07
G.V
C.V
E-90 0
1 TEE 9.1
N-O 150 1 176 0.63 10.1 23.98 0.24
G.V
C.V
E-90 0
2 TEE 18.2
O-P 150 2 264 0.94 20.2 50.81 1.03
G.V
C.V
27 E-90 132.3
1 TEE 9.1
15 -14 150 775 264 0.94 936.8 50.81 47.60
1 G.V 2.1
1 C.V 18.3
4 E-90 19.6
1 TEE 9.1
14-13 150 173 264 0.94 201.7 50.81 10.25
G.V
C.V
15 E-90 45.6
1 TEE 6.4
13 - 12 100 147 255 2.04 199 343.40 68.34
G.V
C.V
4 E-90 12.16
1 TEE 6.4
12 - 11 100 9.7 255 2.04 G.V 0 28.26 343.40 9.70

C.V
3 E-90 6.9
1 TEE 4.6
11 - 10 75 22.1 155 2.20 33.6 554.58 18.63
G.V 0
C.V
E-90
1 TEE 3.65
10- 9 65 3 130 2.46 6.65 803.92 5.35
G.V
C.V

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-3 Sizing SJN
Reference Calculations Output
E-90
1 TEE 3.65
9-8 65 2 124 2.35 5.65 736.56 4.16
G.V
C.V
E-90
1 TEE 3.65
8 -7 65 6.5 112 2.12 G.V 10.15 610.02 6.19

C.V
E-90
1 TEE 3.65
7 -6 65 2 102 1.93 5.65 513.00 2.90
G.V
C.V
E-90
1 TEE 3.65
6-5 65 6.5 94 1.78 10.15 440.98 4.48
G.V
C.V
E-90 0
1 TEE 3.65
5 -4 65 2 84 1.59 5.65 358.06 2.02
G.V 0
C.V
E-90 0
1 TEE 3.65
4- 3 65 6.5 74 1.40 10.15 283.14 2.87
G.V 0
C.V
E-90 0
1 TEE 3.04
3- 2 40 1 29 1.45 4.04 531.64 2.15
G.V 0
C.V
2 E-90 1.2
TEE 0
2- 1 20 12 3 0.60 13.48 232.92 3.14
1 G.V 0.28
C.V

195.57

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** - LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
- Pressure drop in catridge filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 195.57 Kpa = 1.96 Bar = 19.56 m
- Total Pump Head required = 22.50 + 10 + 19.56 + 5
= 57.06 m = 5.71 Bar

Selected pump of 20m3/hr @ 65 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 17/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-4 TO BP-8 Sizing SJN
Reference Calculations Output
Booster Pump BP-4 TO BP-8 (TYPICAL)
Location: Basement
Application: To pump water from Tower 60 Level to 35 Level
Pumps set : 2 pumps in one set are working ,each pump capacity is 29 m3/hr '@35 mtr Head(1 Set is working 1 Set standby)
- Static Head = 5m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)
= 1000 Kg/m
- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes
Distance- Flow Rate
Nodes Pipe Size(mm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
L (m) (gpm)
E-90
1 TEE 6.4
1-2 100 1.5 256 2.05 21.47 345.90 7.43
1 G.V 1.38
1 C.V 12.19
3 E-90 9.12
1 TEE 6.4
2 -3 100 19 256 2.05 35.9 345.90 12.42
1 G.V 1.38
C.V
E-90
1 TEE 1.52
3 -4 25 2 5 0.64 4.52 202.31 0.91
1 G.V 1
C.V
E-90 0
1 TEE 1.21
4-5 20 6.5 4 0.80 7.71 396.82 3.06
G.V 0
C.V
3 E-90 1.44
TEE 0
5-6 15 25 3 1.07 26.71 945.76 25.26
1 G.V 0.27
C.V

49.08
* -The mentioned fitting are the fittings on this pipe segment.
- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
Pressure drop in catridge filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 49.08 Kpa = 0.49 Bar = 4.91 m
'- Total Pump Head required = 5 + 10 + 4.91 + 5
= 24.91 m = 2.49 Bar
Selected pump of 29m3/hr @ 35 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Shelter Building 8/8/2011 05020
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Booster Pump BP-1 & 2 Sizing SJN
Reference Calculations Output

Booster Pump BP-1 & BP-2


Location: Basement
Application: To pump water from basement to Shelter Area at -5.0 Level
Pumps set : 2 pumps in one set each pump capacity is 17 m3/hr @45 mtr Head(One Working One Standby)
- Static Head = 4.00 m
- Residual Pressure = 15 m

= 990 Kg/m@45 C
- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes

Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Total Length*** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)

3 E-90 5.46
1 TEE 3.65
1 -2 65 15 75 1.42 32.58 287.37 9.36
1 G.V 0.85
1 C.V 7.62
E-90
1 TEE 3.65
2-3 65 1 75 1.42 4.65 287.37 1.34
G.V
C.V
E-90 0
1 TEE 3.65
3 -4 65 8.5 44 0.83 12.15 107.03 1.30
G.V 0
C.V
1 E-90 1.82
1 TEE 3.65
4- 5 65 19.5 43 0.81 24.97 102.57 2.56
G.V 0
C.V
1 E-90 0.8
1 TEE 1.52
5- 6 25 11.5 5 0.64 14.82 200.29 2.97
1 G.V 1
C.V
2 E-90 1.6
TEE 0
6- 7 25 3.6 4 0.51 6.2 132.49 0.82
1 G.V 1
C.V

18.35

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
Pressure drop in catridge filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 18.35 Kpa = 0.18 Bar = 1.83 m

BMB Plumbing
Jaber Hospital Pumps Calculations
'- Total Pump Head required = 4.00 + 15 + 1.83 + 5
= 25.83 m = 2.58 Bar

Selected pump of 17m3/hr @ 45 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 27/07/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Lifting Pump LPS-02 Sizing SJN
Reference Calculations Output

Liftingr PumpLPS-02
Location: Basement (-9.53 level)
Application: To pump water from Potable Water tank(-9.53 level) to GRP water Tank at Tower C,D& E(+60.0level)
Pumps set : 3 pumps in one set, Three working ,each pump capacity is 22 m 3/hr(1 Set is working 1 Set standby)
- Static Head = 73 m
- Residual Pressure = 10 m
Pressure drop in straight pipe (Pa) = 6.819 x L x (V / C) 1.852 x (1 / D)1.167 x (r g)

= 990 Kg/m @45 C


- Friction Losses:- = 9.8 m/sec2
C = 150 For pipes

Pipe Size- Total


Nodes Distance- L (m) Flow Rate (gpm) Velocity-V(m/sec) Fittings* LE/fitting** Friction Losses(pa/mtr) Friction Losses in Pipe (Kpa)
D(mm) Length***
30 E-90 91.44
1 TEE 6.4
1-2 100 754 225 1.80 4 G.V 1.37 868.41 306.38 266.06
2 E-45 3.2
1 C.V 12

266.06

* -The mentioned fitting are the fittings on this pipe segment.


- G.V: Gate Valve, E-90: ninety degree Elbow.
** -LE : Equivelent Length for each fitting.
- Total Length= LE+ Pipe Distance.
Pressure drop in catridge filter = 7psi = 5 mtr
- Total Friction Losses in pipes and fittings = 266.06 Kpa = 2.66 Bar = 26.61 m
'- Total Pump Head required = 73 + 10 + 26.61 = 5
= 114.61 m = 11.46 Bar
= 114.61 Say 112 mtr
=
Selected pump is 17m3/hr @ 113 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations
BMB Plumbing
Jaber Hospital Pumps Calculations
CALCULATION SHEET
Project Name: JABER HOSPITAL Date: Job No.
Main Hospital Building 4/9/2011 090512
Calculation Title: WATER SUPPLY SYSTEM Engineer: Sheet no:
Lifting Pump LPS-01 Sizing SJN
Reference Calculations Output

Lifting Pump LPS-01


Location: Basement at -9.53 Level Water Tank Building
Application: To pump water from Potable Water tank(-9.53 level) to GRP water Tank at Tower A& B(+60.0level)
Pumps set : 3 pumps in one set, Three working ,each pump capacity is 17 m3/hr(1 Set is working 1 Set standby)
- Static Head = 73.00 m
- Residual Pressure = 4 m

- Friction Losses:-

Total
Nodes Pipe Size(mm) Distance- L (m) Flow Rate (gpm) Velocity(m/sec) Fittings* LE/fitting** Friction Losses(kpa/ 100mtr) Friction Losses in Pipe (Kpa)
Length***
1 E-90 2.04
TEE 0
1- 2 100 4 113 0.90 7.41 8.20 0.61
1 G.V 1.37
C.V 0
E-90 0
1 TEE 9.14
2- 3 150 6 113 0.60 15.14 2.30 0.35
G.V
C.V
E-90
1 TEE 9.14
3-4 150 1.5 225 0.80 12.77 3.95 0.50
1 G.V 2.13
C.V
E-90 0
1 TEE 9.14
4-5 150 1 150 0.60 10.14 2.30 0.23
G.V 0
C.V
E-90
1 TEE 9.14
5-6 150 1 75 0.60 G.V 0 10.14 2.30 0.23
C.V
E-90 0
TEE 0
6-7 100 2 75 0.65 G.V 2.74 16.93 3.85 0.65
2
1 C.V 12.19
E-90
1 TEE 6.4
7- 8 100 1 75 0.65 7.4 3.85 0.28
G.V
C.V

BMB Plumbing
Jaber Hospital Pumps Calculations
E-90
1 TEE 6.4
8-9 100 1 150 1.20 7.4 14.00 1.04
G.V 0
C.V 0
1 E-90 2.04
1 TEE 6.4
9 -10 100 3 225 1.80 12.81 30.00 3.84
1 G.V 1.37
C.V 0
E-90 0
1 TEE 6.4
10 -11 100 1 225 1.80 7.4 30.00 2.22
G.V 0
C.V 0
E-90
1 TEE 6.4
11 - 12 100 1 150 1.20 7.4 14.00 1.04
G.V
C.V
E-90 0
1 TEE 6.4
12 - 13 100 1 75 0.65 7.4 3.85 0.28
G.V 0
C.V
E-90 0
TEE 0
13 - 14 100 2 75 0.65 4.74 3.85 0.18
2 G.V 2.74
C.V
E-90 0
1 TEE 6.4
14 - 15 100 1 75 0.65 7.4 3.85 0.28
G.V
C.V
E-90 0
1 TEE 6.4
15 - 16 100 1 150 1.20 7.4 14.00 1.04
G.V 0
C.V
E-90 0
1 TEE 6.4
16 - 17 100 1 225 1.80 7.4 30.00 2.22
G.V 0
C.V
35 E-90 71.4
1 TEE 6.4
17 - 18 100 748 225 1.80 831.28 30.00 249.38
4 G.V 5.48
C.V
2 E-90 4.08
1 TEE 6.4
18- 19 100 8.5 113 0.90 20.35 8.20 1.67
1 G.V 1.37
C.V
- Total Length= LE+ Pipe Distance.
Pressure drop in catridge filter = 7psi = 5 mtr 266.06
= 266.06 Kpa = 2.66 Bar = 26.61 m
'- Total Pump Head required = 73.00 + 4 + 26.61 + 5
- Total Friction Losses in pipes and fittings = 108.61 m = 10.86 Bar
= 108.61 mtr
Selected pump of 17m3/hr @ 112 mtr head is sufficient

BMB Plumbing
Jaber Hospital Pumps Calculations

Вам также может понравиться