Вы находитесь на странице: 1из 4

quarterly news V2 Issue 2 FALL 2012

The Energy Drilling Landscape


is About to Change


W ith ten years of proven
reliability and more than
200 Schramm patented Telemast Bringing game changing

Inside
rigs in operation around the world mobility & efficiency to
today, we are pleased to announce the 500,000 lb hoist class,
the launch of our next generation
the new T500XD Drill Rig
THIS ISSUE T500XD Telemast rig rated 500,000
lb hook load with Q1, 2013 from Schramm is now on
The Energy Drilling Landscape availability. the move.
is About to Change................................1
Built to API 8C, 7K and 4F standards,
T500XD Accommodates this land based walking Telemast 35,000 ft-lbs of top head torque, third
Torque Management Technology....2 rig focuses on oil & gas pad drilling party directional steering interface
applications with depths to 15,000 and 80,000 lbs of hydraulic pulldown
World-Famous Rig & Penn College
feet. With horizontal and directional capacity to extend horizontal lateral
Alumni Return to Campus..................2
drilling in mind, the T500XD offers capacity.
Power Breakout Now Available on Continued on page 6
T450GT & T685 Series Rigs..................3
120 People Attend
Chile Service School..............................3
Service Tips From
The Schramm-Man................................4
air-Control Proves Itself
Worldwide................................................5
Upcoming Events...................................6

INDepth Editor
Cheryl Zultewicz

Corporate Vision:
We will continue our tradition as a privately
owned company focused on providing
superior drill rigs and services, personalized
to meet customer requirements.

Schramm, Inc. is a company dedicated to


meeting the needs of the drilling contractor.
Driven by contractor requirements, Schramm
personnel design and manufacture products
around the traditions of superior quality,
innovation and flexibility. Utilizing the
capabilities of computer aided design
workstations and a fully integrated
manufacturing process capability;
contractor ideas are transformed into
drilling solutions to meet the ever
increasing demands of the industry.
INDepth
T500XD World-Famous Rig & Penn Power Breakout Now Available on T450 & T685
INDepth

Accommodates College Alumni Return to Series Rigs


Torque Campus D


rilling safety and production connections by eliminating the manual with drill pipe ranging from 3 to 5-1/2
efficiency can go hand in hand. tongs typically used when tripping inch (76 to 140 mm) OD and can pro-

Management Photos courtesy of Pennsylvania College of Technology


To significantly improve both, we are into and out of the borehole. Used in vide breakout torque up to 16,000 ft-lbs
pleased to announce our new hands- conjunction with the hydraulic hold- (21,693 N-m).
free Power Breakout is now available ing fork; the hydraulic Power Breakout
I graduated on
Technology
The Power Breakout defines the
for T450 and T685 series drill rigs used slides out to align with the tool joints, maximum usable table opening of the
a Friday and in mineral exploration applications clamps on the upper connection and rig, so consult the factory for larger

T was on a service
he New Schramm T500XD drill rig is designed around the world. then rotates to break the tool joints. diameter drilling requirements to verify
to accommodate torque management tech- call Monday This new system improves pipe han- Once broken, the jaws are released and Power Breakout compatibility with your
nology for enhanced horizontal drilling. dling safety by reducing operator direct reset to the break-ready position and
morning said application. g
Over the last decade the horizontal drilling pro- physical contact with the drill pipe the assembly is retracted back into the
cess has become much more efficient in part due Delazio, who during drilling operation. It also speeds mast. This system is designed to work
to better understanding of how to control and maintains 25
manage torque and drag. The T500XDs con- rigs in shale gas
trol system is designed to incorporate 3rd party
automated control technology such as the Slider
areas.
System into the drilling process. The T500XD
Phil Delazio, Schramm Service Technician and
top drive also incorporates a counter-rotation Penn Tech graduate talks with students about ing, said Delazio, who maintains
hydraulic circuit that controls the release of drill the T130XD on display 25 rigs in shale gas areas of
string torque energy at the surface, eliminating Pennsylvania, West Virginia and
Written By: Pennsylvania College of
damage to top drive and drill string components. Technology, Public Information Ohio and whose truck odometer
reflects 57,000 travel miles in just
T
Some important advantages include: he job readiness and advance-
11 months. Most of our new hires T450GT Power Breakout T685WS Power Breakout T685EX Power Breakout
Increased Rate of Penetration and reach ment potential of Penn Col-
are from Penn College; in weld-
capability lege graduates was impressively
ing, manufacturing, service just
in evidence at the Schneebeli
120 People Attend Chile Service School
Smoother weight transfer to the about every department has at
bit, which increases bit life Earth Science Center on Septem-
least one graduate from here. The
On-bottom toolface correction ber 6th, as Schramm Inc. which
T130XD rig has been exhibited
while drilling employs a number of alumni and cal Support Manager, Sebastian Morales
for students before, but it is also a
provides scholarships, internships presented an extensive amount of mate-
Improved well trajectory familiar presence on the interna-
and other ongoing educational rial on the operation, maintenance and
Increased motor life, as stalling is tional stage. It (and Roten) played
opportunities for students troubleshooting of Schramm rigs. He
significantly decreased a major role in reaching and rescu-
demonstrated a T130XD mo- also introduced the latest technology
The ability to increase the length ing 33 trapped Chilean copper
bile drilling rig in the School of upgrades available for existing Schramm
of the horizontal section with miners in October 2010. Rotens
Natural Resources Management rig fleet throughout the region. Sebastian
reduced twist, resulting in increased advice to students: Think big!g
parking lot. The 97,000-pound was supported by Schramms Field Ser-
production rig, manufactured in West Chester vice Representative Matt Starkweather.
No lost-in-hole exposure and carrying a $1.2 million price
The classroom training was well received
Use of less mud additives for tag, drew attention from a variety
but it didnt stop there. Actual hands-on
lubricity enhancement since of majors, including diesel, heavy
training was performed at a local con-
surface rocking torque is used to equipment and welding. Accom-
tractors yard. Attendees took a written
overcome friction panying the rig were technical Students gather around a Schramm T685WS drill rig Matt Starkweather (left) and Sebastian Morales
control panel at Geotec Boyles Bros in Antofagasta, Chile test and were graded to maximize their (right) award Jacinto Astorga (center) with his
Opportunity for directional drillers field representatives Phil Delazio,
learning and retention. They were also training certificate
a 2010 alumnus of the colleges
W
to focus on data trends and other inter in Chile is always the best time provided with the latest update of our
critical issues instead of trying to heavy construction equipment ing safety are key goals of every
to hold training programs as drill- Spanish language T685WS Operation and
control the rocking manually technology: Caterpillar equip- Schramm training event.
ing schedules slow and the weather is still Maintenance Manual that has just been
ment emphasis major, and Jeff You too can participate. Schramm
Several SPE papers including, SPE 92558 Field moderate. This was apparent at Schramm released. Copies are available on request
Roten. Schramm officials have offers a free factory service school
Proof of New Sliding Technology for Directional schools held in Antofagasta in August. Over through our Service Department.
noted the attractiveness of Penn later this year on November 6th -8th.
Drilling have been written on torque manage- College graduates get-right- 120 attendees from 11 contractors attended Schramm training programs can be cus-
ment technology. Please contact Pete Christian, to-work qualifications, remarks a 3 day school sponsored by Schramm and tomized to meet your training needs at Visit our website www.schramminc.
V.P. Engineering at pchristian@schramminc.com for borne out by the days returnees. our local authorized distributor, Exploration our factory or in your back yard. Increas- com for details on this event and
more information. g I graduated on a Friday and was Penn Tech students take a close look at T130XD Drill Masters (EDM). ing productivity, reducing downtime, other custom training opportunities
on a service call Monday morn- mechanical and hydraulic onboard systems
Classes were held in Spanish. EDMs Techni- reducing maintenance costs and improv- to meet your requirements. g
*Citations for this article are listed on page 6

2 INDepth Quarterly Newsletter V2 Issue 2 FALL 2012 3


Service Tips with The Schramm-Man air-Control Proves Itself

INDepth
Chain Adjustment (continued)
INDepth
Chain Adjustment
Worldwide


If the sprockets or sheave appear to be in
usable condition, you still should remove
the pins and inspect both the pins and
bushings for wear. There are thrust washers
A ir-Control, Schramms patented
compressor control system
started in 2005 as a subsystem of
If you provide proper
on either side of these components to i-Control rig operator interface.
absorb the wear from any side loads. Many lubrication and adjustment, Since then it has evolved into the
lower sheaves or sprockets incorporate a you can double the life of industry performance standard for
lip seal as a preventative measure to limit drill rigs supplied with on board air
your feed chain. compressors.
intrusion of contaminants. All of these items
must be inspected and replaced as needed, Today over Schramm 100 rigs
backed out to apply minimal pressure
in order to maintain a proper operating operate with air-Control, including
of the gearbox shaft against the plate.
feed system. rigs in the USA, Canada, Mexico,
Slowly apply pressure using the down Lower Chain Guard
Steve Hanley, The Schramm-Man
So now you are ready to install your new feed relief valve; 200 to 300 psi (13.8 Dominican Republic, Australia, Chile,
In our last issue we discussed the chain. The most critical dimension to to 20.7 bar) for the leaf type chain and NOTE: As the chain begins to wear Peru, China, Mongolia, Saipan and
design of both the roller and leaf consider in the case of roller chain masts 500 to 600 psi (34.5 to 41.4 bar) for the you will have to remove links in Russia. Africa in particular is very
type chain that Schramm uses with dual feed cylinders is the distance from roller type chain. Lower the mast to the order to maintain proper chain well represented, with systems
in the feed circuits of many of the timing tube on the crown of the mast to transport position and leave the engine adjustment. Make certain that you operating in Tanzania, Mali, Burkina
our drill rigs. We also reviewed the connection at the trunnion bar spacers running to maintain hydraulic pressure in alternate link removal from the Faso, Ghana, Senegal, South Africa,
Customers acknowledge that learning
methods of determining the by the rotation gearbox. The tooth count the feed circuit. Using the chain adjusters upper chains the first time, and Zambia and the Democratic Republic
about air-Control is one of the most
chain wear to aid in the planning must be equal to insure that the rotation you want to achieve three inches of sag then the lower chains the next time, of the Congo.
beneficial take-aways from Schramm
of chain replacement. Like most gearbox will hang and travel straight in leaf type chain and two and one half etc. Removing from one set all of Fuel consumption reductions of up service schools. Geotec Boyles Bros in
things that are man-made, when feeding up and down the mast. inches of sag in the roller type chain. This the time will move the terminal to 12 percent drive the interest in this Santiago, Chile has taken it a step further.
they do not last forever and The timing tube design on these systems measurement is to be taken in middle location of the rotation gearbox in system, along with the additional With multiple air-Control systems installed
eventually your chain must be changed in the early nineties from an inline of the upper chain with the rotation that direction. For example: If you benefits of reduced wear and tear across their Schramm drill rig fleet, Geotec
replaced. In this issue we will sprocket (Illustration 1) to a half pitch offset gearbox at the table. remove links from the top chain only, on the engine and compressor by Boyles built an operating air-Control test
look at the replacement and (Illustration 2). With this design timing tube Illustration 2 the rotation gearbox will be closer optimizing horsepower to rig air stand in their facilities. From this test stand,
adjustment of the feed chains you will have to have one side one half to the mast crown when the feed demand. Compressor Specialist Luis Jimenez can test
and their mating components. pitch in advance of the second side when cylinders are fully closed. When the and troubleshoot components
After all the chain has been doing you initial connection. You will also feed cylinder is fully extended the as well as train personnel on
removed from the mast, you want to leave the jam nut at the trunnion rotation gearbox will not reach the the operation and maintenance
will want to inspect all of your spacer block backed off on one side until table. and of this system.
roller chain sprockets or leaf chain tension is set.
In closing, a final reminder that if For more information on
chain sheaves and their pins Illustration 1 you provide proper lubrication and air-Control or to
(axles) for wear. In the case of adjustment, you can double the have an evaluation
the sprockets there is typically life of your feed chain and prevent
Once chain tension is set on the dual feed of your drill rig for
an elongation at the root of unwanted damage to the feed
cylinder masts you must measure the a potential retrofit,
the tooth that also leads to a cylinder rods.
distance from the table to the bottom of please email your
narrowing of the tooth itself. This
the trunnion plates on each side to insure For additional information on chain request to service@
is the result of an extremely worn
a proper alignment of the gearbox shaft maintenance Reference INDepth schramminc.com. To
chain and poor lubrication that
to the slipbox. This distance is adjusted V2 Issue 1 Summer 2012 page 4 learn more about
has created too much distance
with the screws that pass through the for Chain Wear: Maintenance & air-Control register
between the individual rollers.
trunnion spacers. Once set you can lock Adjustment. for an upcoming
When this chain is in tension
the jam nuts at all adjustments points For additional service questions or training program at
from drill string weight, the
and make sure the mechanical locks for to speak with a Service Technician www.schramminc.com/
rollers will erode the sprocket
all nuts are engaged. Lastly, install any today call 610-696-2500 or email servicetechnical-support/
teeth. This type of wear warrants
guards that were removed for easy access service@schramminc.com training-courses g
replacement of the sprocket. To set proper chain tension you must
g
to insure proper personal protection.
Attempting to use new chain bring the rotation gearbox to the table.
with worn sprockets will only Place a steel plate on the table and use the Continued on pg 5
lead to premature chain failure. slow feed circuit with the down feed relief

4 INDepth Quarterly Newsletter V2 Issue 2 FALL 2012 5


T500XD (continued)


handling system that is remarkably of 2 plus helper, the Schramm T500XD
INDepth
compact. The entire rig system Telemast rig redefines speed, safety,
including power unit comes in at only 8 portability and ease of use in its
With a 2 shift rig up time
total truckloads, a fraction of its nearest operating class. Producers and drilling
and a crew of 2 plus helper, competition. Fewer truckloads mean contractors benefit with enhanced
the Schramm T500XD a smaller rig site footprint; along with production, crew retention and
less wear and tear on local highways, profitability as North America continues
Telemast rig redefines
communities and the environment. to strive for energy independence.
speed, safety, portability
Maximum BOP clearance is also a Bringing game changing mobility
and ease of use in its design focal point, resulting in a floor & efficiency to the 500,000 lb hoist
operating class. height of 22 feet and wide open access class, the new T500XD Drill Rig from
directly under the rig floor for easy BOP Schramm is now on the move. For more
The T500XD has an integral walking pad installation and maintenance. information contact sales@schrammminc.
and LoadSafe automated Range III pipe com or visit us at www.schramminc.com g
With a 2 shift rig up time and a crew

*Citations from pg 2: T500XD Accommodates Torque Management Technology


SPE 87162 Understanding Torque: The Key to Slide-Drilling Directional Wells, SPE 92558 Field Proof of New Sliding Technology for Directional Drilling,
SPE 93782 Mechanical Methods of Reducing Torque and Drag in Extended-Reach Wells Facilitate Continued Canadian Foothills Development, SPE
123161 Case History Summary: Horizontal Drilling Performance Improvement Due to Rocking on 800 Horizontal Land Wells Drilled for Unconven-
tional Gas Resources, SPE 139102 Improving Marcellus Shale Performance Using PDC Bits with Optimized Torque Management Technology, Cutting
Structure Aggressiveness and Unique Roller Cone Steel Cutting Structures

Upcoming Events

Permian Basin International Oil Show


October 16 & 18th 2012 Ector County Coliseum Complex Odessa, TX USA
th

Booth # G21-G22

Schramm Service School


November 6 - 8 2012 West Chester Factory West Chester, PA USA
th th

DUGEast Conference
November 13 - 15 2012 David L. Lawrence Convention Center Pittsburg, PA USA
th th

Booth # 353

Northwest Mining Show


December 3rd - 7th 2012 Spokane Convention Center Spokane, WA USA
Booth # 718

NGWA National Show


December 5 - 6 2012 Las Vegas Convention Center Las Vegas, NV USA
th th

Booth # 801

800 East Virginia Ave West Chester, PA 19380 Phone: 610-696-2500 Fax: 610-696-6950 www.schramminc.com

6 V2 Issue 2 FALL 2012

Вам также может понравиться