Вы находитесь на странице: 1из 254

PRADO HUANUCO METR

PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 02 PASE AEREO DE L=29.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

002

m2
dado de concreto 1.85 1.85
zapata de columna 1.80 1.80

m2
dado de concreto 1.85 1.85
zapata de columna 1.80 1.80

m3
dado de concreto 1.85 1.85 0.75
zapata de columna 1.80 1.80 0.65
m3 fac esp
1.30

m2
dado de concreto 1.85 1.85
zapata de columna 1.80 1.80

m3 1.85 1.85 0.75

m3 1.80 1.80 0.60

KG
m3 3.50 0.35 0.25

m2
2.00 3.50 0.35
2.00 3.50 0.25
kg

m2
COLUMNA 2.00 3.50 0.35
2.00 3.50 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

13.33 26.65
2.00 6.85
2.00 6.48

13.33 26.65
2.00 6.85
2.00 6.48

9.35 18.69
2.00 5.13
2.00 4.21
48.60
18.69

13.33 26.65
2.00 6.85
2.00 6.48

2.00 5.13 10.27

2.00 3.89 7.78

88.13 176.26
2.00 0.61 1.23

8.40 16.80
2.00 4.90
2.00 3.50
124.86 249.72

8.40 16.80
2.00 4.90
2.00 3.50

1.00 2.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 02 PASE AEREO DE L=25.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

002

m2
dado de concreto 1.90 1.90
zapata de columna 1.80 1.80

m2
dado de concreto 1.90 1.90
zapata de columna 1.80 1.80

m3
dado de concreto 1.90 1.90 0.55
zapata de columna 1.80 1.80 0.70
m3 fac esp
1.30

m2
dado de concreto 1.90 1.90
zapata de columna 1.80 1.80

m3 1.90 1.90 0.75

m3 1.80 1.80 0.60

KG
m3 3.50 0.35 0.25

m2
2.00 3.50 0.35
2.00 3.50 0.25
kg

m2
COLUMNA 2.00 3.50 0.35
2.00 3.50 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

13.70 27.40
2.00 7.22
2.00 6.48

13.70 27.40
2.00 7.22
2.00 6.48

8.51 17.01
2.00 3.97
2.00 4.54
44.24
17.01

13.70 27.40
2.00 7.22
2.00 6.48

2.00 5.42 10.83

2.00 3.89 7.78

88.13 176.26
2.00 0.61 1.23

8.40 16.80
2.00 4.90
2.00 3.50
124.86 249.72

8.40 16.80
2.00 4.90
2.00 3.50

1.00 2.00
METRADOS LINEA DE CONDUCCION-ADICIONAL

PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE
LEONCIO PRADO HUANUCO

SUB
:
PROYECTO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO

FECHA: Apr-17

MEDIDAS N SUB TOTAL


DE TOTAL
N DESCRIPCION UNIDAD LARGO ANCHO ALTO AREA VOLUMEN VECES LONG. AREA VOL. KG.

01.03 02 PASE AEREO DE L=18.0 m 002


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 9.00 18.00
dado de concreto 1.50 1.50 2.00 4.50
zapata de columna 1.50 1.50 2.00 4.50

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m2 9.00 18.00


dado de concreto 1.50 1.50 2.00 4.50
zapata de columna 1.50 1.50 2.00 4.50

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.01 EXCAVACION MANUAL m3 5.85 11.70
dado de concreto 1.50 1.50 0.60 2.00 2.70
zapata de columna 1.50 1.50 0.70 2.00 3.15
01.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE D= 20m m3 fac esp 30.42
VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.) 1.30 11.70

01.03.03 CONCRETO SIMPLE


01.03.03.01 CONCRETO F'c=140 KG/CM2 PARA SOLADOS m2 9.00 18.00
dado de concreto 1.50 1.50 2.00 4.50
zapata de columna 1.50 1.50 2.00 4.50

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE m3 1.50 1.50 0.60 2.00 2.70 5.40

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2 m3 1.50 1.50 0.60 2.00 2.70 5.40

ACERO CORRUGADO Fy=4200 KG/CM2 KG 61.20 122.40

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2 m3 3.20 0.35 0.25 2.00 0.56 1.12

ENCOFRADO Y DESENCOFRADO m2 7.68 15.36


2.00 3.20 0.35 2.00 4.48
2.00 3.20 0.25 2.00 3.20
ACERO CORRUGADO Fy=4200 KG/CM2 kg 107.95 215.91

01.03.04.01 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM m2 7.68 15.36
COLUMNA 2.00 3.20 0.35 2.00 4.48
2.00 3.20 0.25 2.00 3.20

01.03.05 ACCESORIOS
01.03.05.01 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO GLB 1.00 1.00 2.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 02 PASE AEREO DE L=15.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

002

m2
dado de concreto 1.50 1.50
zapata de columna 1.50 1.50

m2
dado de concreto 1.50 1.50
zapata de columna 1.50 1.50

m3
dado de concreto 1.50 1.50 0.50
zapata de columna 1.50 1.50 0.60
m3 fac esp
1.30

m2
dado de concreto 1.50 1.50
zapata de columna 1.50 1.50

m3 1.50 1.50 0.50

m3 1.50 1.50 0.60

KG
m3 3.30 0.35 0.25

m2
2.00 3.30 0.35
2.00 3.30 0.25
kg

m2
COLUMNA 2.00 3.30 0.35
2.00 3.30 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

9.00 18.00
2.00 4.50
2.00 4.50

9.00 18.00
2.00 4.50
2.00 4.50

4.95 9.90
2.00 2.25
2.00 2.70
25.74
9.90

9.00 18.00
2.00 4.50
2.00 4.50

2.00 2.25 4.50

2.00 2.70 5.40

61.20 122.40
2.00 0.58 1.16

7.92 15.84
2.00 4.62
2.00 3.30
124.86 249.72

7.92 15.84
2.00 4.62
2.00 3.30

1.00 2.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 01 PASE AEREO DE L=12.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

001

m2
dado de concreto 1.25 1.25
zapata de columna 1.20 1.20

m2
dado de concreto 1.25 1.25
zapata de columna 1.20 1.20

m3
dado de concreto 1.25 1.25 0.75
zapata de columna 1.20 1.20 0.65
m3 fac esp
1.30

m2
dado de concreto 1.25 1.25
zapata de columna 1.20 1.20

m3 1.25 1.25 0.40

m3 1.25 1.25 0.60

KG
m3 2.40 0.30 0.25

m2
2.00 2.40 0.30
2.00 2.40 0.25
kg

m2
COLUMNA 2.00 2.40 0.30
2.00 2.40 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

6.01 6.01
2.00 3.13
2.00 2.88

6.01 6.01
2.00 3.13
2.00 2.88

4.22 4.22
2.00 2.34
2.00 1.87
5.48
4.22

6.01 6.01
2.00 3.13
2.00 2.88

2.00 1.25 1.25

2.00 1.88 1.88

39.17 39.17
2.00 0.36 0.36

5.28 5.28
2.00 2.88
2.00 2.40
106.91 106.91

5.28 5.28
2.00 2.88
2.00 2.40

1.00 1.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 01 PASE AEREO DE L=10.5 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

002

m2
dado de concreto 1.20 1.20
zapata de columna 1.20 1.20

m2
dado de concreto 1.20 1.20
zapata de columna 1.20 1.20

m3
dado de concreto 1.20 1.20 0.75
zapata de columna 1.20 1.20 0.65
m3 fac esp
1.30

m2
dado de concreto 1.20 1.20
zapata de columna 1.20 1.20

m3 1.20 1.20 0.75

m3 1.20 1.20 0.60

KG
m3 3.20 0.35 0.25

m2
2.00 3.20 0.30
2.00 3.20 0.25
kg

m2
COLUMNA 2.00 3.20 0.30
2.00 3.20 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

5.76 11.52
2.00 2.88
2.00 2.88

5.76 11.52
2.00 2.88
2.00 2.88

4.03 8.06
2.00 2.16
2.00 1.87
20.97
8.06

5.76 11.52
2.00 2.88
2.00 2.88

2.00 2.16 4.32

2.00 1.73 3.46

88.13 176.26
2.00 0.56 1.12

7.04 14.08
2.00 3.84
2.00 3.20
124.86 249.72

7.04 14.08
2.00 3.84
2.00 3.20

1.00 2.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 01 PASE AEREO DE L=09.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

001

m2
dado de concreto 1.00 1.00
zapata de columna 1.10 1.10

m2
dado de concreto 1.00 1.00
zapata de columna 1.10 1.10

m3
dado de concreto 1.00 1.00 0.75
zapata de columna 1.10 1.10 0.65
m3 fac esp
1.30

m2
dado de concreto 1.00 1.00
zapata de columna 1.10 1.10

m3 1.85 1.85 0.75

m3 1.10 1.10 0.60

KG
m3 2.40 0.30 0.25

m2
2.00 2.40 0.30
2.00 2.40 0.25
kg

m2
COLUMNA 2.00 2.40 0.30
2.00 2.40 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

4.42 4.42
2.00 2.00
2.00 2.42

4.42 4.42
2.00 2.00
2.00 2.42

3.07 3.07
2.00 1.50
2.00 1.57
3.99
3.07

4.42 4.42
2.00 2.00
2.00 2.42

2.00 5.13 5.13

2.00 1.45 1.45

32.90 32.90
2.00 0.36 0.36

5.28 5.28
2.00 2.88
2.00 2.40
106.91 106.91

5.28 5.28
2.00 2.88
2.00 2.40

1.00 1.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 02 PASE AEREO DE L=29.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2

ENCOFRADO Y DESENCOFRADO

ACERO CORRUGADO Fy=4200 KG/CM2

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

000

m2
dado de concreto 1.00 1.00
zapata de columna 1.00 1.00

m2
dado de concreto 1.00 1.00
zapata de columna 1.00 1.00

m3
dado de concreto 1.00 1.00 0.75
zapata de columna 1.00 1.00 0.65
m3 fac esp
1.30

m2
dado de concreto 1.00 1.00
zapata de columna 1.00 1.00

m3 1.00 1.00 0.75

m3 1.00 1.00 0.60

KG
m3 2.30 0.30 0.25

m2
2.00 2.30 0.30
2.00 2.30 0.25
kg

m2
COLUMNA 2.00 2.30 0.30
2.00 2.30 0.25

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

4.00 0.00
2.00 2.00
2.00 2.00

4.00 0.00
2.00 2.00
2.00 2.00

2.80 0.00
2.00 1.50
2.00 1.30
0.00
0.00

4.00 0.00
2.00 2.00
2.00 2.00

2.00 1.50 0.00

2.00 1.20 0.00

27.21 0.00
2.00 0.35 0.00

5.06 0.00
2.00 2.76
2.00 2.30
102.72 0.00

5.06 0.00
2.00 2.76
2.00 2.30

1.00 0.00
PRADO HUANUCO METR
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 RESUMEN VARIOS


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=8.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL
01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=4.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE
ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=4.4 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=5.4 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS


01.03.02 MOVIMIENTO DE TIERRAS
01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=6.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=7.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO

01.03 01 PASE AEREO DE L=6.4 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS


01.03.02 MOVIMIENTO DE TIERRAS
01.03.02.0 EXCAVACION MANUAL

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)

01.03.03 CONCRETO SIMPLE


CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE

ENCOFRADO Y DESENCOFRADO

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL

AJILLA

DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA VOLUMEN

001

m2

m2

m3

m3

m3

m2

GLB

001

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40

m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80

m2
2.00 0.40 0.80
2.00 0.40 0.80

GLB 1.00

001

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40

m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80


m2
2.00 0.40 0.80
2.00 0.40 0.80

GLB 1.00

001

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40

m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80

m2
2.00 0.40 0.80
2.00 0.40 0.80

GLB 1.00

001

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40

m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80

m2
2.00 0.40 0.80
2.00 0.40 0.80

GLB 1.00

002

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40

m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80

m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00

001

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40

m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80

m2
2.00 0.40 0.80
2.00 0.40 0.80

GLB 1.00

001

m2
dado de concreto 0.40 0.40

m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80

m3 fac esp
1.30

m3 0.40 0.40 0.80

m2
2.00 0.40 0.80
2.00 0.40 0.80

GLB 1.00
REGION: HUNUCO

N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.

2.56 2.56
2.56

2.56 2.56
2.56

2.05 2.05
2.05

3.33
3.33

3.07 3.07

20.48 20.48
20.48

0.00

0.32 0.32
2.00 0.32

0.32 0.32
2.00 0.32

0.26 0.26
2.00 0.26

0.33
0.26

3.00 0.38 0.38

2.56 2.56
2.00 1.28
2.00 1.28

1.00 1.00

0.32 0.32
2.00 0.32

0.32 0.32
2.00 0.32

0.26 0.26
2.00 0.26

0.33
0.26

3.00 0.38 0.38


2.56 2.56
2.00 1.28
2.00 1.28

1.00 1.00

0.32 0.32
2.00 0.32

0.32 0.32
2.00 0.32

0.26 0.26
2.00 0.26

0.33
0.26

3.00 0.38 0.38

2.56 2.56
2.00 1.28
2.00 1.28

1.00 1.00

0.32 0.32
2.00 0.32

0.32 0.32
2.00 0.32

0.26 0.26
2.00 0.26

0.33
0.26

3.00 0.38 0.38

2.56 2.56
2.00 1.28
2.00 1.28

1.00 1.00

0.32 0.64
2.00 0.32

0.32 0.64
2.00 0.32

0.26 0.51
2.00 0.26

1.33
0.51

3.00 0.38 0.77

2.56 5.12
2.00 1.28
2.00 1.28
1.00 2.00

0.32 0.32
2.00 0.32

0.32 0.32
2.00 0.32

0.26 0.26
2.00 0.26

0.33
0.26

3.00 0.38 0.38

2.56 2.56
2.00 1.28
2.00 1.28

1.00 1.00

0.32 0.32
2.00 0.32

0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26

0.33
0.26

3.00 0.38 0.38

2.56 2.56
2.00 1.28
2.00 1.28

1.00 1.00
PLANILLA DE METRADOS - ACERO TANQUE SEPTICO - POZO PE

-NOMBRE DEL PROYECTO:


"MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESA
ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE

-UBICACIN: LUGAR: SANTA ROSA DE SHAPAJILLA, DIST.: LUYANDO, PROV.: LEONCIO PRADO, DPTO.: HU

N N Var 1/4" Var 3/8"


CODIGO DESCRIPCION DE LA PARTIDA Fo
Veces Long Unid 0.25 0.58
02.03. PASE AEREO L=18.0 m
02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
1/2 2.00 1.50 10.00
1/2 2.00 1.50 10.00

COLUMNA
VERTICAL 5/8 2.00 1.90 2.00
VERTICAL 1/2 2.00 3.94 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=29.0 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.80 12.00
parrila superior 1/2 2.00 1.80 12.00

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 4.24 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=25.0 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.80 12.00
parrila superior 1/2 2.00 1.80 12.00

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 4.24 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=15.0 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.50 10.00
parrila superior 1/2 2.00 1.50 10.00

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 4.24 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=12.0 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.20 8.00
parrila superior 1/2 2.00 1.20 8.00

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.14 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=10.5 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.20 8.00
parrila superior 1/2 2.00 1.20 8.00

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.14 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=09.0 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.10 7.33
parrila superior 1/2 2.00 1.10 7.33

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.14 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82

02.03. PASE AEREO L=08.0 m


02.03.04.02 ACERO CORRUGADO fy=4200 Kg/cm2, GRADO 60
ZAPATA
parrila de fondo 1/2 2.00 1.00 6.67
parrila superior 1/2 2.00 1.00 6.67

COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.04 8.00
ESTRIBOS 3/8 2.00 1.14 22.00 14.55
SEPTICO - POZO PERCOLADOR

AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA


O DE LA PROVINCIA DE LEONCIO PRADO - HUANUCO"

CIO PRADO, DPTO.: HUANUCO

Var 1/2" Var 5/8" Var 3/4" Var 1" Peso Peso
1.02 1.58 2.24 Parcial Total Und

169.15 KG
61.20
15.30 30.60
15.30 30.60

107.95
6.00 12.01
32.15 64.30
31.64

212.99 KG
88.13
22.03 44.06
22.03 44.06

124.86
12.01 24.02
34.60 69.20
31.64

212.99 KG
88.13
22.03 44.06
22.03 44.06

124.86
12.01 24.02
34.60 69.20
31.64

186.06 KG
61.20
15.30 30.60
15.30 30.60

124.86
12.01 24.02
34.60 69.20
31.64

146.07 KG
39.17
9.79 19.58
9.79 19.58

106.91
12.01 24.02
25.62 51.24
31.64

146.07 KG
39.17
9.79 19.58
9.79 19.58

106.91
12.01 24.02
25.62 51.24
31.64

139.80 KG
32.90
8.22 16.45
8.22 16.45

106.91
12.01 24.02
25.62 51.24
31.64

129.94 KG
27.21
6.80 13.61
6.80 13.61

102.72
12.01 24.02
24.81 49.61
29.09
SHAPAJILLA, DISTRITO DE LUYANDOMETRADOS LINEA DE
DE LA PROVINCIA DE CONDUCCION
LEONCIO PRA
PROYECT :

SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO:

FECHA: Apr-17

N DESCRIPCION

01.03 02 PASE AEREO DE L=29.0 m


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS


pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.02 MOVIMIENTO DE TIERRAS


01.03.02.0 EXCAVACION MANUAL
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE D= 20m


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.)
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.03 CONCRETO SIMPLE


01.03.03.0 CONCRETO F'c=140 KG/CM2 PARA SOLADOS
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE


pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

ENCOFRADO Y DESENCOFRADO
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

ACERO CORRUGADO Fy=4200 KG/CM2


pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

ENCOFRADO Y DESENCOFRADO
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

ACERO CORRUGADO Fy=4200 KG/CM2


pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.04.0 REVOQUES Y ENLUCIDOS


TARRAJEO E= 1.0CM
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios

01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios
EA DE
CIA DE CONDUCCION-ADICIONAL
LEONCIO PRADO HUANUCO

AJILLA

DISTRITO: LUYANDO REGION: HUNUCO

SUB TOTAL
TOTAL
LONG. AREA VOL. KG.

114.56
26.65
27.40
18.00
18.00
6.01
11.52
4.42
0.00
2.56

114.56
26.65
27.40
18.00
18.00
6.01
11.52
4.42
0.00
2.56

74.71
18.69
17.01
11.70
9.90
4.22
8.06
3.07
0.00
2.05

182.76
48.60
44.24
30.42
25.74
5.48
20.97
3.99
0.00
3.33

112.00
26.65
27.40
18.00
18.00
6.01
11.52
4.42
0.00
0.00

44.77
10.27
10.83
5.40
4.50
1.25
4.32
5.13
0.00
3.07

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.48

33.14
7.78
7.78
5.40
5.40
1.88
3.46
1.45
0.00
0.00

919.64
176.26
176.26
122.40
122.40
39.17
176.26
106.91
0.00
0.00

10.81
1.23
1.23
1.12
5.40
0.36
1.12
0.36
0.00
0.00

89.44
16.80
16.80
15.36
15.84
5.28
14.08
5.28
0.00
0.00

1,428.58
249.72
249.72
215.91
249.72
106.91
249.72
106.91
0.00
0.00

89.44
16.80
16.80
15.36
15.84
5.28
14.08
5.28
0.00
0.00

12.00
2.00
2.00
2.00
2.00
1.00
2.00
1.00
0.00
7.00 7.00
0.00
METRADOS LINEA DE ADUCCION-ADICIONAL

PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE LEONCIO PRADO
HUANUCO

SUB
: SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
PROYECTO

LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO

FECHA: Apr-17

MEDIDAS N SUB TOTAL


DE TOTAL
N DESCRIPCION UNIDAD LARGO ANCHO ALTO AREA VOLUMEN VECES LONG. AREA VOL. KG.

01.04 LINEA DE ADUCCION (L=214.72m)


01.04.01 TRABAJOS PRELIMINARES
01.04.01.01 LIMPIEZA DE TERRENO MANUAL ML 1.00 214.72 214.72
ML 214.72 1.00 214.72

01.04.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 1.00 214.72 214.72


RESERVORIO - INICIO DE RED DE DISTRIBUCION ML 214.72 1.00 1.00 214.72

01.04.02 MOVIMIENTO DE TIERRAS


01.04.02.01 EXCAVACIN DE ZANJAS CON MAQUINARIA M3 1.00 83.74 83.74
RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 214.72 0.39 83.74

01.04.02.02 REFINE, NIVELACION Y FONDOS PARA TUB. DE 90MM ML 1.00 214.72 214.72
LINEA DE ADUCCION ML 214.72 1.00 214.72

01.04.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO, INC. CAMA ARENA 10 CM M3 1.00 51.53 51.53
RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 214.72 0.24 51.53

01.04.02.04 RELLENO COMPACTADO DE ZANJAS M3 30.92 30.92


RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 214.72 0.12 25.77 Compactacion 20% 30.92

01.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE M3 55.27 55.27


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.) M3 Esponjamiento 30% 55.27

01.04.03 TUBERIAS PVC


01.04.03.01 TUBERIA PVC SAP UF C-7.5 DE 3" (90 mm) ML 1.00 214.72 214.72
LINEA DE ADUCCION ML 214.72 1.00 214.72

01.04.04 PRUEBAS HIDRAULICAS


01.04.04.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ML 1.00 214.72 214.72
LINEA DE ADUCCION ML 214.72 1.00 214.72

01.04.05 ACCESORIOS PARA TUBERIAS


01.04.05.01 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 22.5 UND 2.00 2.00
CODO PVC 3" (90mm) x 22.5 UND 2.00

01.04.05.02 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 45 UND 2.00 2.00
CODO PVC 3" (90mm) x 45 UND 2.00

01.04.05.03 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 90 UND 2.00 2.00
CODO PVC 3" (90mm) x 90 UND 2.00
METRADOS LINEA DE CONDUCCION

PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE
LEONCIO PRADO HUANUCO

SUB
:
PROYECTO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA

LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO

FECHA: Jun-16 HECHO POR JPPM

MEDIDAS N SUB TOTAL


DE TOTAL
N DESCRIPCION UNIDAD LARGO ANCHO ALTO AREA VOLUMEN VECES LONG. AREA VOL. KG.

01.03 LINEA DE CONDUCCION (L=2443.18m)


01.03.01 TRABAJOS PRELIMINARES
01.03.01.01 LIMPIEZA DE TERRENO MANUAL ML 1.00 2,443.18 2,443.18
ML 2,443.18 1.00 2,443.18

01.03.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 1.00 2,443.18 2,443.18


Tuberias de = 3" (75MM) ML 2,443.18 1.00 1.00 2,443.18
01.03.02 MOVIMIENTO DE TIERRAS
01.03.02.01 EXCAVACION DE ZANJAS CON MAQUINARIA M3 1.00 952.84 952.84
Tuberias de = 3" (75MM) 2,443.18 0.39 952.84
01.03.02.02 REFINE, NIVELACION Y FONDOS PARA TUB. DE 90MM ML 1.00 2,443.18 2,443.18
LINEA DE CONDUCCION ML 2,443.18 1.00 2,443.18

01.03.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO, INC. CAMA ARENA M3 1.00 586.36 586.36
Tuberias de = 3" (75MM) 2,443.18 0.24 586.36
01.03.02.04 RELLENO COMPACTADO DE ZANJAS M3 351.82 351.82
Tuberias de = 3" (75MM) 2,443.18 0.12 293.18 Compactacion 20% 351.82
01.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE M3 628.87 628.87
VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.) M3 Esponjamiento 30% 628.87

01.03.03 TUBERIAS PVC


01.03.03.01 TUBERIA PVC SAP UF C-7.5 =3" (90mm) ML 1.00 2,443.18 2,443.18
LINEA DE CONDUCCION ML 2,443.18 1.00 2,443.18

01.03.04 PRUEBAS HIDRAULICAS


01.03.04.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ML 1.00 2,443.18 2,443.18
LINEA DE CONDUCCION ML 2,443.18 1.00 2,443.18

01.03.05 ACCESORIOSYPARA
SUMINISTRO TUBERIASCODO PVC SAP UF 3" (90mm) x
COLOCACION
01.03.05.01 22.5 UND 5.00 5.00
CODO PVC 3" (90mm) x 22.5 UND 5.00

01.03.05.02 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 45 UND 5.00 5.00
CODO PVC 3" (90mm) x 45 UND 5.00

01.03.05.03 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 90 UND 5.00 5.00
CODO PVC 3" (90mm) x 90 UND 5.00
METRADOS LINEA DE ADUCCION

PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE LEONCIO PRADO
HUANUCO

SUB
: SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
PROYECTO

LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO

FECHA: Apr-16 HECHO POR JPPM

MEDIDAS N SUB TOTAL


DE TOTAL
N DESCRIPCION UNIDAD LARGO ANCHO ALTO AREA VOLUMEN VECES LONG. AREA VOL. KG.

01.04 LINEA DE ADUCCION (L=783.00m)


01.04.01 TRABAJOS PRELIMINARES
01.04.01.01 LIMPIEZA DE TERRENO MANUAL ML 1.00 783.00 783.00
ML 783.00 1.00 783.00

01.04.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS ML 1.00 783.00 783.00


RESERVORIO - INICIO DE RED DE DISTRIBUCION ML 783.00 1.00 1.00 783.00

01.04.02 MOVIMIENTO DE TIERRAS


01.04.02.01 EXCAVACIN DE ZANJAS CON MAQUINARIA M3 1.00 305.37 305.37
RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 783.00 0.39 305.37

01.04.02.02 REFINE, NIVELACION Y FONDOS PARA TUB. DE 90MM ML 1.00 783.00 783.00
LINEA DE ADUCCION ML 783.00 1.00 783.00

01.04.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO, INC. CAMA ARENA 10 CM M3 1.00 187.92 187.92
RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 783.00 0.24 187.92

01.04.02.04 RELLENO COMPACTADO DE ZANJAS M3 112.75 112.75


RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 783.00 0.12 93.96 Compactacion 20% 112.75

01.04.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE M3 201.54 201.54


VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.) M3 Esponjamiento 30% 201.54

01.04.03 TUBERIAS PVC


01.04.03.01 TUBERIA PVC SAP UF C-7.5 DE 3" (90 mm) ML 1.00 783.00 783.00
LINEA DE ADUCCION ML 783.00 1.00 783.00

01.04.04 PRUEBAS HIDRAULICAS


01.04.04.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA ML 1.00 783.00 783.00
LINEA DE ADUCCION ML 783.00 1.00 783.00

01.04.05 ACCESORIOS PARA TUBERIAS


01.04.05.01 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 22.5 UND 8.00 8.00
CODO PVC 3" (90mm) x 22.5 UND 8.00

01.04.05.02 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 45 UND 8.00 8.00
CODO PVC 3" (90mm) x 45 UND 8.00

01.04.05.03 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 90 UND 8.00 8.00
CODO PVC 3" (90mm) x 90 UND 8.00
PROYECTO :
MEJORAMIENTO Y A

SUB PROYECTO :
SISTEMA DE AGUA P

LOCALIDAD: S.R. SHAPAJILLA

FECHA: Apr-16 HECHO P

01.07 RED DE DISTRIBUCION

01.07.01 TRABAJOS PRELIMINAR

01.07.01.01 LIMPIEZA DE TERRENO

Tuberias de = 2 1/2" (7

Tuberias de = 2" (63MM


N

Tuberias de = 1 1/2" (4

Tuberias de = 1" (33 M

Tuberias de = 3/4" (26.

01.07.01.01 TRAZO, NIVELACION Y

Tuberias de = 2 1/2" (7

Tuberias de = 2" (63MM

Tuberias de = 1 1/2" (4

Tuberias de = 1" (33 M

Tuberias de = 3/4" (26.


N

01.07.02 MOVIMIENTOS DE TIERR

01.07.02.01 EXCAVACION MANUAL D

Tuberias de = 2 1/2" (7

Tuberias de = 2" (63MM

Tuberias de = 1 1/2" (4

Tuberias de = 1" (33 M

Tuberias de = 3/4" (26.

01.07.02.02 REFINE, NIVELACION Y

Tuberias de = 2 1/2"
N

01.07.02.02 REFINE, NIVELACION Y

Tuberias de = 2"

01.07.02.02 REFINE, NIVELACION Y

Tuberias de = 1 1/2

01.07.02.02 REFINE, NIVELACION Y

Tuberias de = 1"

01.07.02.02 REFINE, NIVELACION Y

Tuberias de = 3/4"
N

01.07.02.03 RELLENO CON MATERIA

Tuberias de = 2 1/2" (7

Tuberias de = 2" (63MM

Tuberias de = 1 1/2" (4

Tuberias de = 1" (33 M

Tuberias de = 3/4" (26.

01.07.02.04 RELLENO COMPACTADO

Tuberias de = 2 1/2" (7

Tuberias de = 2" (63MM


N

Tuberias de = 1 1/2" (4

Tuberias de = 1" (33 M

Tuberias de = 3/4" (26.

01.07.02.05 ELIMINACION DE MATER

ELIMINACION DE MATE
N

01.07.03 TUBERIAS PVC

01.07.03.01 SUMINISTRO Y COLOCA

Tuberias de = 2 1/2" (7

01.07.03.01 SUMINISTRO Y COLOCA

Tuberias de = 2" (63MM

01.07.03.02 SUMINISTRO Y COLOCA

Tuberias de = 1 1/2" (4

01.07.03.03 SUMINISTRO Y COLOCA


N

Tuberias de = 1" (33 M

01.07.03.04 SUMINISTRO Y COLOCA

Tuberias de = 3/4" (26.


N

01.07.04 ACCESORIOS PARA TUB

01.07.04.01 SUMINISTRO Y COLOCA

CODO PVC 2 1/2" (75M

01.07.04.02 SUMINISTRO Y COLOCA

TEE PVC 2 1/2" (75MM

01.07.04.03 SUMINISTRO Y COLOCA

CRUZ 2 1/2" (75MM)

01.07.04.04 SUMINISTRO Y COLOCA


N

CODO PVC 2" (63MM)

01.07.04.05 SUMINISTRO Y COLOCA

CODO PVC 2" (63MM)

01.07.04.06 SUMINISTRO Y COLOCA

TEE PVC 2" (63MM)

01.07.04.07 SUMINISTRO Y COLOCA

TAPON PVC 2" (63MM


N

01.07.04.08 SUMINISTRO Y COLOCA

CODO PVC 1 1/2" (48M

01.07.04.09 SUMINISTRO Y COLOCA

TEE PVC 1 1/2" (48MM

01.07.04.10 SUMINISTRO Y COLOCA

CODO PVC 1" (33MM)

01.07.04.11 SUMINISTRO Y COLOCA

CODO PVC 1" (33MM)


N

01.07.04.12 SUMINISTRO Y COLOCA

CODO PVC 1" (33MM)

01.07.04.13 SUMINISTRO Y COLOCA

TEE PVC 1" (33MM)

01.07.04.14 SUMINISTRO Y COLOCA

CRUZ PVC 1" (33MM)

01.07.04.15 SUMINISTRO Y COLOCA


N

TAPON PVC 1" (33MM

01.07.04.16 SUMINISTRO Y COLOCA

CODO PVC 3/4" (26.5M

01.07.04.17 SUMINISTRO Y COLOCA

CODO PVC 3/4" (26.5M

01.07.04.18 SUMINISTRO Y COLOCA

CODO PVC 3/4" (26.5M


N

01.07.04.19 SUMINISTRO Y COLOCA

TEE PVC 3/4" (26.5MM

01.07.04.20 SUMINISTRO Y COLOCA

TAPON PVC 3/4" (26.5

01.07.04.21 SUMINISTRO Y COLOCA

REDUCCION PVC DE

01.07.04.22 SUMINISTRO Y COLOCA

REDUCCION PVC DE
N

01.07.04.23 SUMINISTRO Y COLOCA

REDUCCION PVC DE

01.07.04.24 SUMINISTRO Y COLOCA

REDUCCION PVC DE

01.07.04.25 SUMINISTRO Y COLOCA

REDUCCION PVC DE

01.07.04.26 SUMINISTRO Y COLOCA


N

REDUCCION PVC DE

01.07.04.27 SUMINISTRO Y COLOCA

REDUCCION PVC DE

01.07.04.28 SUMINISTRO Y COLOCA

REDUCCION PVC DE

01.07.05 PRUEBAS HIDRAULICAS

01.07.05.01 PRUEBA HIDRAULICA Y

Tuberias de = 2", 1 1/2


N
MEJORAMIENTO Y AMPLIACION DE LOS SI

SISTEMA DE AGUA POTABLE SANTA ROSA

DISTRITO:

HECHO POR :

DESCRIPCION

RED DE DISTRIBUCION

TRABAJOS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL

Tuberias de = 2 1/2" (75MM)

Tuberias de = 2" (63MM)


DESCRIPCION

Tuberias de = 1 1/2" (48MM)

Tuberias de = 1" (33 MM)

Tuberias de = 3/4" (26.5 MM)

TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

Tuberias de = 2 1/2" (75MM)

Tuberias de = 2" (63MM)

Tuberias de = 1 1/2" (48MM)

Tuberias de = 1" (33 MM)

Tuberias de = 3/4" (26.5 MM)


DESCRIPCION

MOVIMIENTOS DE TIERRA

EXCAVACION MANUAL DE ZANJAS, T-NORMAL

Tuberias de = 2 1/2" (75MM)

Tuberias de = 2" (63MM)

Tuberias de = 1 1/2" (48MM)

Tuberias de = 1" (33 MM)

Tuberias de = 3/4" (26.5 MM)

REFINE, NIVELACION Y FONDOS PARA TUB. 75M

Tuberias de = 2 1/2"
DESCRIPCION

REFINE, NIVELACION Y FONDOS PARA TUB. 63M

Tuberias de = 2"

REFINE, NIVELACION Y FONDOS PARA TUB. 48M

Tuberias de = 1 1/2

REFINE, NIVELACION Y FONDOS PARA TUB. 33M

Tuberias de = 1"

REFINE, NIVELACION Y FONDOS PARA TUB. 26.5

Tuberias de = 3/4"
DESCRIPCION

RELLENO CON MATERIAL PROPIO ZARANDEADO

Tuberias de = 2 1/2" (75MM)

Tuberias de = 2" (63MM)

Tuberias de = 1 1/2" (48MM)

Tuberias de = 1" (33 MM)

Tuberias de = 3/4" (26.5 MM)

RELLENO COMPACTADO DE ZANJAS

Tuberias de = 2 1/2" (75MM)

Tuberias de = 2" (63MM)


DESCRIPCION

Tuberias de = 1 1/2" (48MM)

Tuberias de = 1" (33 MM)

Tuberias de = 3/4" (26.5 MM)

ELIMINACION DE MATERIAL EXCEDENTE CON TR

ELIMINACION DE MATERIAL EXCEDENTE


DESCRIPCION

SUMINISTRO Y COLOCACION DE TUBERIA PVC S

Tuberias de = 2 1/2" (75MM)

SUMINISTRO Y COLOCACION DE TUBERIA PVC S

Tuberias de = 2" (63MM)

SUMINISTRO Y COLOCACION DE TUBERIA PVC S

Tuberias de = 1 1/2" (48MM)

SUMINISTRO Y COLOCACION DE TUBERIA PVC S


DESCRIPCION

Tuberias de = 1" (33 MM)

SUMINISTRO Y COLOCACION DE TUBERIA PVC S

Tuberias de = 3/4" (26.5 MM)


DESCRIPCION

ACCESORIOS PARA TUBERIAS

SUMINISTRO Y COLOCACION DE CODO PVC 2 1

CODO PVC 2 1/2" (75MM) X 22.5

SUMINISTRO Y COLOCACION DE TEE PVC 2 1/2

TEE PVC 2 1/2" (75MM)

SUMINISTRO Y COLOCACION DE CRUZ PVC 2 1

CRUZ 2 1/2" (75MM)

SUMINISTRO Y COLOCACION DE CODO PVC 2"


DESCRIPCION

CODO PVC 2" (63MM) X 22.5

SUMINISTRO Y COLOCACION DE CODO PVC 2"

CODO PVC 2" (63MM) X 45

SUMINISTRO Y COLOCACION DE TEE PVC 2" (6

TEE PVC 2" (63MM)

SUMINISTRO Y COLOCACION DE TAPON PVC 2

TAPON PVC 2" (63MM)


DESCRIPCION

SUMINISTRO Y COLOCACION DE CODO PVC 1 1

CODO PVC 1 1/2" (48MM) X 45

SUMINISTRO Y COLOCACION DE TEE PVC 1 1/2

TEE PVC 1 1/2" (48MM)

SUMINISTRO Y COLOCACION DE CODO PVC 1"

CODO PVC 1" (33MM) X 22.5

SUMINISTRO Y COLOCACION DE CODO PVC 1"

CODO PVC 1" (33MM) X 45


DESCRIPCION

SUMINISTRO Y COLOCACION DE CODO PVC 1"

CODO PVC 1" (33MM) X 90

SUMINISTRO Y COLOCACION DE TEE PVC 1" (3

TEE PVC 1" (33MM)

SUMINISTRO Y COLOCACION DE CRUZ PVC 1"

CRUZ PVC 1" (33MM)

SUMINISTRO Y COLOCACION DE TAPON PVC 1


DESCRIPCION

TAPON PVC 1" (33MM)

SUMINISTRO Y COLOCACION DE CODO PVC 3/4

CODO PVC 3/4" (26.5MM) X 22.5

SUMINISTRO Y COLOCACION DE CODO PVC 3/4

CODO PVC 3/4" (26.5MM) X 45

SUMINISTRO Y COLOCACION DE CODO PVC 3/4

CODO PVC 3/4" (26.5MM) X 90


DESCRIPCION

SUMINISTRO Y COLOCACION DE TEE PVC 3/4"

TEE PVC 3/4" (26.5MM)

SUMINISTRO Y COLOCACION DE TAPON PVC 3

TAPON PVC 3/4" (26.5MM)

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 2 1/2" X 2"

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 2 1/2" X 1"


DESCRIPCION

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 2 1/2" X 3/4"

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 2" X 1 1/2"

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 2" X 1"

SUMINISTRO Y COLOCACION DE REDUCCION PV


DESCRIPCION

REDUCCION PVC DE 2" X 3/4"

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 1 1/2" X3/4"

SUMINISTRO Y COLOCACION DE REDUCCION PV

REDUCCION PVC DE 1" X 3/4"

PRUEBAS HIDRAULICAS

PRUEBA HIDRAULICA Y DESINFECCION EN TUBE

Tuberias de = 2", 1 1/2", 1", 3/4"


DESCRIPCION
METRADOS RED DE DIS
ION DE LOS SISTEMAS DE AGUA POTABLE,

E SANTA ROSA DE SHAPAJILLA

LUYANDO

JPPM

DESCRIPCION
DESCRIPCION

TEO DE ZANJAS
DESCRIPCION

AS, T-NORMAL

PARA TUB. 75MM


DESCRIPCION

PARA TUB. 63MM

PARA TUB. 48MM

PARA TUB. 33MM

PARA TUB. 26.5MM


DESCRIPCION

O ZARANDEADO, INC. CAMA DE ARENA 10 CM

JAS
DESCRIPCION

EDENTE CON TRANSPORTE

EDENTE
DESCRIPCION

TUBERIA PVC SAP C-7.5 =75MM

TUBERIA PVC SAP C-7.5 =63MM

TUBERIA PVC SAP C-7.5 =48MM

TUBERIA PVC SAP C-10 = 33 MM


DESCRIPCION

TUBERIA PVC SAP C-10 =26.5MM


DESCRIPCION

CODO PVC 2 1/2" (75MM) X 22.5

TEE PVC 2 1/2" (75MM)

CRUZ PVC 2 1/2" (75MM)

CODO PVC 2" (63MM) X 22.5


DESCRIPCION

CODO PVC 2" (63MM) X 45

TEE PVC 2" (63MM)

TAPON PVC 2" (63MM)


DESCRIPCION

CODO PVC 1 1/2" (48MM) X 45

TEE PVC 1 1/2" (48MM)

CODO PVC 1" (33MM) X 22.5

CODO PVC 1" (33MM) X 45


DESCRIPCION

CODO PVC 1" (33MM) X 90

TEE PVC 1" (33MM)

CRUZ PVC 1" (33MM)

TAPON PVC 1" (33MM)


DESCRIPCION

CODO PVC 3/4" (26.5MM) X 22.5

CODO PVC 3/4" (26.5MM) X 45

CODO PVC 3/4" (26.5MM) X 90


DESCRIPCION

TEE PVC 3/4" (26.5MM)

TAPON PVC 3/4" (26.5MM)

REDUCCION PVC DE 2 1/2" X 2"

"

REDUCCION PVC DE 2 1/2" X 1"

"
DESCRIPCION

REDUCCION PVC DE 2 1/2" X 3/4"

/4"

REDUCCION PVC DE 2" X 1 1/2"

"

REDUCCION PVC DE 2" X 1"

REDUCCION PVC DE 2" X 3/4"


DESCRIPCION

REDUCCION PVC DE 1 1/2" X3/4"

4"

REDUCCION PVC DE 1" X 3/4"

CCION EN TUBERIAS PVC SAP


DESCRIPCION
E DISTRIBUCION SISTEMA DE AGUA
BLE, DESAGUE Y LETRINAS DEL CASERIO DE
DE LEONCIO PRADO HUANUCO

PROVINCIA: LEONCIO PRADO

MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

ML

ML 267.68

ML 1,803.70
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

ML 1,596.37

ML 4,592.48

ML 1,061.54

ML

ML 267.68

ML 1,803.70

ML 1,596.37

ML 4,592.48

ML 1,061.54
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

M3

ML 267.68 Ver plano 0.39

ML 1,803.70 Ver plano 0.39

ML 1,596.37 Ver plano 0.26

ML 4,592.48 Ver plano 0.24

ML 1,061.54 Ver plano 0.24

ML

ML 267.68
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

ML

ML 1,803.70

ML

ML 1,596.37

ML

ML 4,592.48

ML

ML 1,061.54
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

M3

ML 267.68 Ver plano 0.27

ML 1,803.70 Ver plano 0.27

ML 1,596.37 Ver plano 0.18

ML 4,592.48 Ver plano 0.17

ML 1,061.54 Ver plano 0.17

M3

ML 267.68 Ver plano 0.12

ML 1,803.70 Ver plano 0.12


MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

ML 1,596.37 Ver plano 0.08

ML 4,592.48 Ver plano 0.07

ML 1,061.54 Ver plano 0.07

M3
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

ML

ML 267.68

ML

ML 1,803.70

ML

ML 1,596.37

ML
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

ML 4,592.48

ML

ML 1,061.54
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

UND

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA

UND

UND

UND

UND

UND

ML

ML 9,321.77
MEDIDAS

UNIDAD LARGO ANCHO ALTO AREA


A DE AGUA POTABLE
CASERIO DE SANTA ROSA DE SHAPAJILLA,
HUANUCO

CIO PRADO REGION

N S
DE
VOLUMENVECES LONG. AREA

1.00 9,321.77

1.00 267.68

1.00 1,803.70
N S
DE
VOLUMENVECES LONG. AREA

1.00 1,596.37

1.00 4,592.48

1.00 1,061.54

1.00 9,321.77

1.00 267.68

1.00 1,803.70

1.00 1,596.37

1.00 4,592.48

1.00 1,061.54
N S
DE
VOLUMENVECES LONG. AREA

1.00 2,579.86
1.00 104.40

1.00 703.44

1.00 415.06

1.00 1,102.20

1.00 254.77

1.00 267.68
1.00 267.68
N S
DE
VOLUMENVECES LONG. AREA

1.00 1,803.70
1.00 1,803.70

1.00 1,596.37
1.00 1,596.37

1.00 4,592.48
1.00 4,592.48

1.00 1,061.54
1.00 1,061.54
N S
DE
VOLUMENVECES LONG. AREA

1.00 1,798.15
1.00 71.74

1.00 483.39

1.00 279.36

1.00 785.31

1.00 178.34

1.00

1.00 32.12 Compactacion 20


1.00 216.44 Compactacion 20
N S
DE
VOLUMENVECES LONG. AREA

1.00 134.10 Compactacion 20


1.00 312.29 Compactacion 20
1.00 76.43 Compactacion 20

Esponjamiento 30%
N S
DE
VOLUMENVECES LONG. AREA

1.00 267.68
1.00 267.68

1.00 1,803.70
1.00 1,803.70

1.00 1,596.37
1.00 1,596.37

1.00 4,592.48
N S
DE
VOLUMENVECES LONG. AREA

1.00 4,592.48

1.00 1,061.54

1.00 1,061.54
N S
DE
VOLUMENVECES LONG. AREA

1.00

1.00

1.00

1.00

1.00

1.00

2.00
N S
DE
VOLUMENVECES LONG. AREA

2.00

1.00
1.00

7.00

7.00

1.00

1.00
N S
DE
VOLUMENVECES LONG. AREA

2.00

2.00

1.00

1.00

7.00

7.00

7.00

7.00
N S
DE
VOLUMENVECES LONG. AREA

4.00

4.00

10.00

10.00

2.00

2.00

3.00
N S
DE
VOLUMENVECES LONG. AREA

3.00

11.00

11.00

16.00

16.00

9.00

9.00
N S
DE
VOLUMENVECES LONG. AREA

15.00

15.00

37.00

37.00

1.00

1.00

2.00

2.00
N S
DE
VOLUMENVECES LONG. AREA

1.00

1.00

2.00

2.00

5.00

5.00

6.00
N S
DE
VOLUMENVECES LONG. AREA

6.00

1.00

1.00

15.00

15.00

1.00 9,321.77
1.00 9,321.77
N S
DE
VOLUMENVECES LONG. AREA
ABLE
ROSA DE SHAPAJILLA, DISTRITO DE LUYAN

HUNUCO

SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.

Compactacion 20%

Compactacion 20%
SUB TOTAL

VOL.

Compactacion 20%

Compactacion 20%

Compactacion 20%

1,682.95

1,682.95
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
SUB TOTAL

VOL.
LLA, DISTRITO DE LUYANDO DE LA PROVINC

NUCO

SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.

925.66

38.55

259.73
SUB TOTAL

KG.

160.91

374.75

91.72
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
SUB TOTAL

KG.
LUYANDO DE LA PROVINCIA

TOTAL

9,321.77
TOTAL

9,321.77
TOTAL

2,579.86

267.68
TOTAL

1,803.70

1,596.37

4,592.48

1,061.54
TOTAL

1,798.15

925.66
TOTAL

1,682.95
TOTAL

267.68

1,803.70

1,596.37

4,592.48
TOTAL

1,061.54
TOTAL

1.00

1.00

1.00

2.00
TOTAL

1.00

7.00

1.00
TOTAL

2.00

1.00

7.00

7.00
TOTAL

4.00

10.00

2.00

3.00
TOTAL

11.00

16.00

9.00
TOTAL

15.00

37.00

1.00

2.00
TOTAL

1.00

2.00

5.00

6.00
TOTAL

1.00

15.00

9,321.77
TOTAL
PROYECTO :
MEJORAMIENTO Y

SUB PROYECTO :
SISTEMA DE AGUA P

LOCALIDAD: S.R. SHAPAJILLA

FECHA: Apr-16 HECHO PO

01.09.00 CONEXIONES DOMICILIAR

01.09.01 TRABAJOS PRELIMINARES

01.09.01.01 LIMPIEZA DE TERRENO MA

CONEXIONES DOMICILI
N

01.09.01.01 TRAZO, NIVELACION Y RE

CONEXIONES DOMICILI

01.09.02 MOVIMIENTO DE TIERRAS

01.09.02.01 EXCAVACION MANUAL DE

CONEXIONES DOMICILI

01.09.02.02 REFINE, NIVELACION Y FO

CONEXIONES DOMICILI

01.09.02.03 RELLENO CON MATERIAL


N

CONEXIONES DOMICILI

01.09.02.04 RELLENO COMPACTADO D

CONEXIONES DOMICILI

01.09.02.05 ELIMINACION DE MATERIA

ELIMINACION DE MATER

01.11.03 VEREDA PARA CONEXIN

01.11.03.01 TRABAJOS PRELIMINARE

01.11.03.01.01 LIMPIEZA DEL TERREN


N

VEREDA DE CONEXIO

01.11.03.01.02 TRAZO, NIVELACION Y

VEREDA DE CONEXIO

01.11.03.02 MOVIMIENTO DE TIERRA

01.11.03.02.01 EXCAVACION DE ZANJA

VEREDA DE CONEXIO

01.11.03.02.02 NIVELACION INTERIOR

VEREDA DE CONEXIO

01.11.03.02.03 RELLENO COMPACTAD

VEREDA DE CONEXIO
N

01.11.03.02 CONCRETO SIMPLE

01.11.03.02.04 CONCRETO f'c=175 kg/c

VEREDA DE CONEXIO

UA DE VEREDA

DEDUCTIVO TAPA PR

01.11.03.02.05 ENCOFRADO Y DESENC

VEREDA DE CONEXIO

01.09.03 CONEXIONES DOMILICIAR

INSTALACION DE CONEXIO
01.09.03.01 21 mm DESDE LA MATRIZ
N

CONEXIONES DOMICILI

01.09.04 PRUEBAS HIDRAULICAS

01.09.04.01 PRUEBA DESINFECCIN D

CONEXIONES DOMICILI
MEJORAMIENTO Y AMPLIACION DE LO

SISTEMA DE AGUA POTABLE SANTA ROS

DISTRITO:

HECHO POR

DESCRIPCION

CONEXIONES DOMICILIARIAS (183 UNIDADES)

TRABAJOS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL

CONEXIONES DOMICILIARIAS
DESCRIPCION

TRAZO, NIVELACION Y REPLANTEO DE ZANJAS

CONEXIONES DOMICILIARIAS

MOVIMIENTO DE TIERRAS

EXCAVACION MANUAL DE ZANJAS, T-NORMAL

CONEXIONES DOMICILIARIAS

REFINE, NIVELACION Y FONDOS PARA TUB. DE 2

CONEXIONES DOMICILIARIAS

RELLENO CON MATERIAL PROPIO ZARANDEADO


DESCRIPCION

CONEXIONES DOMICILIARIAS

RELLENO COMPACTADO DE ZANJAS

CONEXIONES DOMICILIARIAS

ELIMINACION DE MATERIAL EXCEDENTE CON TR

ELIMINACION DE MATERIAL EXCEDENTE

VEREDA PARA CONEXIN DOMICILIARIA

TRABAJOS PRELIMINARES

LIMPIEZA DEL TERRENO MANUAL


DESCRIPCION

VEREDA DE CONEXION DOMICILIARIA

TRAZO, NIVELACION Y REPLANTEO

VEREDA DE CONEXION DOMICILIARIA

MOVIMIENTO DE TIERRAS

EXCAVACION DE ZANJA PARA VEREDA

VEREDA DE CONEXION DOMICILIARIA

NIVELACION INTERIOR APISONADO

VEREDA DE CONEXION DOMICILIARIA

RELLENO COMPACTADO

VEREDA DE CONEXION DOMICILIARIA


DESCRIPCION

CONCRETO SIMPLE

CONCRETO f'c=175 kg/cm2

VEREDA DE CONEXION DOMICILIARIA

UA DE VEREDA

DEDUCTIVO TAPA PREFABRICADA DE CONC

ENCOFRADO Y DESENCOFRADO NORMAL

VEREDA DE CONEXION DOMICILIARIA

CONEXIONES DOMILICIARIAS

INSTALACION DE CONEXIONES DOMICILIARIAS D


21 mm DESDE LA MATRIZ DE 2"; 1 1/2"; 1"; 3/4"
DESCRIPCION

CONEXIONES DOMICILIARIAS

PRUEBAS HIDRAULICAS

PRUEBA DESINFECCIN DE TUBERA DE 21MM -

CONEXIONES DOMICILIARIAS
METRADOS CON
AMPLIACION DE LOS SISTEMAS DE AGUA PO
LUYANDO DE LA

TABLE SANTA ROSA DE SHAPAJILLA

LUYANDO

JPPM

DESCRIPCION

S (183 UNIDADES)

UAL

RIAS
DESCRIPCION

LANTEO DE ZANJAS

RIAS

ANJAS, T-NORMAL

RIAS

DOS PARA TUB. DE 21MM

RIAS

ROPIO ZARANDEADO, INC. CAMA ARENA 10 CM


DESCRIPCION

RIAS

ZANJAS

RIAS

EXCEDENTE CON TRANSPORTE

AL EXCEDENTE

OMICILIARIA

MANUAL
DESCRIPCION

N DOMICILIARIA

EPLANTEO

N DOMICILIARIA

PARA VEREDA

N DOMICILIARIA

PISONADO

N DOMICILIARIA

N DOMICILIARIA
DESCRIPCION

N DOMICILIARIA

FABRICADA DE CONCRETO PARA AGUA

FRADO NORMAL

N DOMICILIARIA

ES DOMICILIARIAS DE AGUA Inc.Acc. DE PVC


E 2"; 1 1/2"; 1"; 3/4" (Inc.CAJA y TAPA)
DESCRIPCION

RIAS

TUBERA DE 21MM - PVC -AGUA

RIAS
OS CONEXIONES DOMICILIARIAS
AGUA POTABLE, DESAGUE Y LETRINAS DEL
O DE LA PROVINCIA DE LEONCIO PRADO H

PROVINCIA:

MEDIDAS

UNIDAD LARGO ANCHO ALTO

ML

ML 4.27
MEDIDAS

UNIDAD LARGO ANCHO ALTO

ML

ML 4.27

M3

M3 1,153.88 Ver plano

ML

ML 1,153.88

M3
MEDIDAS

UNIDAD LARGO ANCHO ALTO

M3 1,153.88 Ver plano

M3

M3 1,153.88 Ver plano

M3

M2
MEDIDAS

UNIDAD LARGO ANCHO ALTO

M2 1.00 1.00

M2

M2 1.00 1.00

M3

M3 1.00 1.00 0.20

M2

M2 1.00 1.00

M3

M3 1.00 1.00 0.10


MEDIDAS

UNIDAD LARGO ANCHO ALTO

M3

M3 1.00 1.00 0.10

M3 1.00 0.10 0.10

M3 0.40 0.40 0.10

M2

M2 3.00 0.15

UND
MEDIDAS

UNIDAD LARGO ANCHO ALTO

UND

ML

ML 4.27
ARIAS
NAS DEL CASERIO DE SANTA ROSA DE SHA
PRADO HUANUCO

LEONCIO PRADO

N SUB TOTA
DE
AREA VOLUMEN VECES LONG.

270.00 4.27

1.00 4.27
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.

270.00 4.27

1.00 4.27

1.00 276.93

0.24 276.93

1.00 1,153.88

1,153.88

1.00 189.24
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.

0.16 189.24

1.00

0.08 87.69

Compactacion 20%

Esponjamiento 30%

1.00 270.00
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.

270.00 270.00

1.00 270.00

270.00 270.00

1.00 54.00

270.00 54.00

1.00 270.00

270.00 270.00

1.00 27.00

270.00 27.00
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.

1.00 25.38

270.00 27.00

270.00 2.70

-270.00 -4.32

1.00 121.50

270.00 121.50

1.00
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.

270.00

1.00 1,153.88
270.00 1,153.88
SA DE SHAPAJILLA, DISTRITO DE

REGIHUNUCO

SUB TOTAL
TOTAL

AREA VOL. KG.

1,153.88
SUB TOTAL
TOTAL

AREA VOL. KG.

1,153.88

276.93

1,153.88

189.24
SUB TOTAL
TOTAL

AREA VOL. KG.

105.23 105.23

105.23

174.01 174.01

174.01

270.00
SUB TOTAL
TOTAL

AREA VOL. KG.

270.00

54.00

270.00

27.00
SUB TOTAL
TOTAL

AREA VOL. KG.

25.38

121.50

270.00
SUB TOTAL
TOTAL

AREA VOL. KG.

1,153.88