PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
002
m2
dado de concreto 1.85 1.85
zapata de columna 1.80 1.80
m2
dado de concreto 1.85 1.85
zapata de columna 1.80 1.80
m3
dado de concreto 1.85 1.85 0.75
zapata de columna 1.80 1.80 0.65
m3 fac esp
1.30
m2
dado de concreto 1.85 1.85
zapata de columna 1.80 1.80
KG
m3 3.50 0.35 0.25
m2
2.00 3.50 0.35
2.00 3.50 0.25
kg
m2
COLUMNA 2.00 3.50 0.35
2.00 3.50 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
13.33 26.65
2.00 6.85
2.00 6.48
13.33 26.65
2.00 6.85
2.00 6.48
9.35 18.69
2.00 5.13
2.00 4.21
48.60
18.69
13.33 26.65
2.00 6.85
2.00 6.48
88.13 176.26
2.00 0.61 1.23
8.40 16.80
2.00 4.90
2.00 3.50
124.86 249.72
8.40 16.80
2.00 4.90
2.00 3.50
1.00 2.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
002
m2
dado de concreto 1.90 1.90
zapata de columna 1.80 1.80
m2
dado de concreto 1.90 1.90
zapata de columna 1.80 1.80
m3
dado de concreto 1.90 1.90 0.55
zapata de columna 1.80 1.80 0.70
m3 fac esp
1.30
m2
dado de concreto 1.90 1.90
zapata de columna 1.80 1.80
KG
m3 3.50 0.35 0.25
m2
2.00 3.50 0.35
2.00 3.50 0.25
kg
m2
COLUMNA 2.00 3.50 0.35
2.00 3.50 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
13.70 27.40
2.00 7.22
2.00 6.48
13.70 27.40
2.00 7.22
2.00 6.48
8.51 17.01
2.00 3.97
2.00 4.54
44.24
17.01
13.70 27.40
2.00 7.22
2.00 6.48
88.13 176.26
2.00 0.61 1.23
8.40 16.80
2.00 4.90
2.00 3.50
124.86 249.72
8.40 16.80
2.00 4.90
2.00 3.50
1.00 2.00
METRADOS LINEA DE CONDUCCION-ADICIONAL
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE
LEONCIO PRADO HUANUCO
SUB
:
PROYECTO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO
FECHA: Apr-17
CONCRETO F'c=175 KG/CM2 + 30% PG- DADO DE ANCLAJE m3 1.50 1.50 0.60 2.00 2.70 5.40
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2 m3 1.50 1.50 0.60 2.00 2.70 5.40
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2 m3 3.20 0.35 0.25 2.00 0.56 1.12
01.03.05 ACCESORIOS
01.03.05.01 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO GLB 1.00 1.00 2.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
002
m2
dado de concreto 1.50 1.50
zapata de columna 1.50 1.50
m2
dado de concreto 1.50 1.50
zapata de columna 1.50 1.50
m3
dado de concreto 1.50 1.50 0.50
zapata de columna 1.50 1.50 0.60
m3 fac esp
1.30
m2
dado de concreto 1.50 1.50
zapata de columna 1.50 1.50
KG
m3 3.30 0.35 0.25
m2
2.00 3.30 0.35
2.00 3.30 0.25
kg
m2
COLUMNA 2.00 3.30 0.35
2.00 3.30 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
9.00 18.00
2.00 4.50
2.00 4.50
9.00 18.00
2.00 4.50
2.00 4.50
4.95 9.90
2.00 2.25
2.00 2.70
25.74
9.90
9.00 18.00
2.00 4.50
2.00 4.50
61.20 122.40
2.00 0.58 1.16
7.92 15.84
2.00 4.62
2.00 3.30
124.86 249.72
7.92 15.84
2.00 4.62
2.00 3.30
1.00 2.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
001
m2
dado de concreto 1.25 1.25
zapata de columna 1.20 1.20
m2
dado de concreto 1.25 1.25
zapata de columna 1.20 1.20
m3
dado de concreto 1.25 1.25 0.75
zapata de columna 1.20 1.20 0.65
m3 fac esp
1.30
m2
dado de concreto 1.25 1.25
zapata de columna 1.20 1.20
KG
m3 2.40 0.30 0.25
m2
2.00 2.40 0.30
2.00 2.40 0.25
kg
m2
COLUMNA 2.00 2.40 0.30
2.00 2.40 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
6.01 6.01
2.00 3.13
2.00 2.88
6.01 6.01
2.00 3.13
2.00 2.88
4.22 4.22
2.00 2.34
2.00 1.87
5.48
4.22
6.01 6.01
2.00 3.13
2.00 2.88
39.17 39.17
2.00 0.36 0.36
5.28 5.28
2.00 2.88
2.00 2.40
106.91 106.91
5.28 5.28
2.00 2.88
2.00 2.40
1.00 1.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
002
m2
dado de concreto 1.20 1.20
zapata de columna 1.20 1.20
m2
dado de concreto 1.20 1.20
zapata de columna 1.20 1.20
m3
dado de concreto 1.20 1.20 0.75
zapata de columna 1.20 1.20 0.65
m3 fac esp
1.30
m2
dado de concreto 1.20 1.20
zapata de columna 1.20 1.20
KG
m3 3.20 0.35 0.25
m2
2.00 3.20 0.30
2.00 3.20 0.25
kg
m2
COLUMNA 2.00 3.20 0.30
2.00 3.20 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
5.76 11.52
2.00 2.88
2.00 2.88
5.76 11.52
2.00 2.88
2.00 2.88
4.03 8.06
2.00 2.16
2.00 1.87
20.97
8.06
5.76 11.52
2.00 2.88
2.00 2.88
88.13 176.26
2.00 0.56 1.12
7.04 14.08
2.00 3.84
2.00 3.20
124.86 249.72
7.04 14.08
2.00 3.84
2.00 3.20
1.00 2.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
001
m2
dado de concreto 1.00 1.00
zapata de columna 1.10 1.10
m2
dado de concreto 1.00 1.00
zapata de columna 1.10 1.10
m3
dado de concreto 1.00 1.00 0.75
zapata de columna 1.10 1.10 0.65
m3 fac esp
1.30
m2
dado de concreto 1.00 1.00
zapata de columna 1.10 1.10
KG
m3 2.40 0.30 0.25
m2
2.00 2.40 0.30
2.00 2.40 0.25
kg
m2
COLUMNA 2.00 2.40 0.30
2.00 2.40 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
4.42 4.42
2.00 2.00
2.00 2.42
4.42 4.42
2.00 2.00
2.00 2.42
3.07 3.07
2.00 1.50
2.00 1.57
3.99
3.07
4.42 4.42
2.00 2.00
2.00 2.42
32.90 32.90
2.00 0.36 0.36
5.28 5.28
2.00 2.88
2.00 2.40
106.91 106.91
5.28 5.28
2.00 2.88
2.00 2.40
1.00 1.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
000
m2
dado de concreto 1.00 1.00
zapata de columna 1.00 1.00
m2
dado de concreto 1.00 1.00
zapata de columna 1.00 1.00
m3
dado de concreto 1.00 1.00 0.75
zapata de columna 1.00 1.00 0.65
m3 fac esp
1.30
m2
dado de concreto 1.00 1.00
zapata de columna 1.00 1.00
KG
m3 2.30 0.30 0.25
m2
2.00 2.30 0.30
2.00 2.30 0.25
kg
m2
COLUMNA 2.00 2.30 0.30
2.00 2.30 0.25
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
4.00 0.00
2.00 2.00
2.00 2.00
4.00 0.00
2.00 2.00
2.00 2.00
2.80 0.00
2.00 1.50
2.00 1.30
0.00
0.00
4.00 0.00
2.00 2.00
2.00 2.00
27.21 0.00
2.00 0.35 0.00
5.06 0.00
2.00 2.76
2.00 2.30
102.72 0.00
5.06 0.00
2.00 2.76
2.00 2.30
1.00 0.00
PRADO HUANUCO METR
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
ENCOFRADO Y DESENCOFRADO
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
METRADOS LINEA DE CONDUCCION-ADICIONAL
AJILLA
MEDIDAS
001
m2
m2
m3
m3
m3
m2
GLB
001
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00
001
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
GLB 1.00
001
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00
001
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00
002
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00
001
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00
001
m2
dado de concreto 0.40 0.40
m2
dado de concreto 0.40 0.40
m3
dado de concreto 0.40 0.40 0.80
m3 fac esp
1.30
m2
2.00 0.40 0.80
2.00 0.40 0.80
GLB 1.00
REGION: HUNUCO
N SUB TOTAL
DE TOTAL
VECES LONG. AREA VOL. KG.
2.56 2.56
2.56
2.56 2.56
2.56
2.05 2.05
2.05
3.33
3.33
3.07 3.07
20.48 20.48
20.48
0.00
0.32 0.32
2.00 0.32
0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26
0.33
0.26
2.56 2.56
2.00 1.28
2.00 1.28
1.00 1.00
0.32 0.32
2.00 0.32
0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26
0.33
0.26
1.00 1.00
0.32 0.32
2.00 0.32
0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26
0.33
0.26
2.56 2.56
2.00 1.28
2.00 1.28
1.00 1.00
0.32 0.32
2.00 0.32
0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26
0.33
0.26
2.56 2.56
2.00 1.28
2.00 1.28
1.00 1.00
0.32 0.64
2.00 0.32
0.32 0.64
2.00 0.32
0.26 0.51
2.00 0.26
1.33
0.51
2.56 5.12
2.00 1.28
2.00 1.28
1.00 2.00
0.32 0.32
2.00 0.32
0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26
0.33
0.26
2.56 2.56
2.00 1.28
2.00 1.28
1.00 1.00
0.32 0.32
2.00 0.32
0.32 0.32
2.00 0.32
0.26 0.26
2.00 0.26
0.33
0.26
2.56 2.56
2.00 1.28
2.00 1.28
1.00 1.00
PLANILLA DE METRADOS - ACERO TANQUE SEPTICO - POZO PE
-UBICACIN: LUGAR: SANTA ROSA DE SHAPAJILLA, DIST.: LUYANDO, PROV.: LEONCIO PRADO, DPTO.: HU
COLUMNA
VERTICAL 5/8 2.00 1.90 2.00
VERTICAL 1/2 2.00 3.94 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 4.24 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 4.24 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 4.24 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.14 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.14 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.14 8.00
ESTRIBOS 3/8 2.00 1.24 22.00 15.82
COLUMNA
VERTICAL 5/8 2.00 1.90 4.00
VERTICAL 1/2 2.00 3.04 8.00
ESTRIBOS 3/8 2.00 1.14 22.00 14.55
SEPTICO - POZO PERCOLADOR
Var 1/2" Var 5/8" Var 3/4" Var 1" Peso Peso
1.02 1.58 2.24 Parcial Total Und
169.15 KG
61.20
15.30 30.60
15.30 30.60
107.95
6.00 12.01
32.15 64.30
31.64
212.99 KG
88.13
22.03 44.06
22.03 44.06
124.86
12.01 24.02
34.60 69.20
31.64
212.99 KG
88.13
22.03 44.06
22.03 44.06
124.86
12.01 24.02
34.60 69.20
31.64
186.06 KG
61.20
15.30 30.60
15.30 30.60
124.86
12.01 24.02
34.60 69.20
31.64
146.07 KG
39.17
9.79 19.58
9.79 19.58
106.91
12.01 24.02
25.62 51.24
31.64
146.07 KG
39.17
9.79 19.58
9.79 19.58
106.91
12.01 24.02
25.62 51.24
31.64
139.80 KG
32.90
8.22 16.45
8.22 16.45
106.91
12.01 24.02
25.62 51.24
31.64
129.94 KG
27.21
6.80 13.61
6.80 13.61
102.72
12.01 24.02
24.81 49.61
29.09
SHAPAJILLA, DISTRITO DE LUYANDOMETRADOS LINEA DE
DE LA PROVINCIA DE CONDUCCION
LEONCIO PRA
PROYECT :
SUB
PROYEC :
TO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
FECHA: Apr-17
N DESCRIPCION
ENCOFRADO Y DESENCOFRADO
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios
CONCRETO ARMADO
ZAPATAS
CONCRETO F'c=210 KG/CM2
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios
01.03.04 COLUMNAS
CONCRETO F'c=210 KG/CM2
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios
ENCOFRADO Y DESENCOFRADO
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios
01.03.05 ACCESORIOS
01.03.05.0 SUMINISTRO Y COLOCADO DE ACCESORIOS PASE AEREO
pase 29
pase 25
pase 18
pase 15
pase 12
pase 10.5
pase 9
pase 8
varios
EA DE
CIA DE CONDUCCION-ADICIONAL
LEONCIO PRADO HUANUCO
AJILLA
SUB TOTAL
TOTAL
LONG. AREA VOL. KG.
114.56
26.65
27.40
18.00
18.00
6.01
11.52
4.42
0.00
2.56
114.56
26.65
27.40
18.00
18.00
6.01
11.52
4.42
0.00
2.56
74.71
18.69
17.01
11.70
9.90
4.22
8.06
3.07
0.00
2.05
182.76
48.60
44.24
30.42
25.74
5.48
20.97
3.99
0.00
3.33
112.00
26.65
27.40
18.00
18.00
6.01
11.52
4.42
0.00
0.00
44.77
10.27
10.83
5.40
4.50
1.25
4.32
5.13
0.00
3.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
20.48
33.14
7.78
7.78
5.40
5.40
1.88
3.46
1.45
0.00
0.00
919.64
176.26
176.26
122.40
122.40
39.17
176.26
106.91
0.00
0.00
10.81
1.23
1.23
1.12
5.40
0.36
1.12
0.36
0.00
0.00
89.44
16.80
16.80
15.36
15.84
5.28
14.08
5.28
0.00
0.00
1,428.58
249.72
249.72
215.91
249.72
106.91
249.72
106.91
0.00
0.00
89.44
16.80
16.80
15.36
15.84
5.28
14.08
5.28
0.00
0.00
12.00
2.00
2.00
2.00
2.00
1.00
2.00
1.00
0.00
7.00 7.00
0.00
METRADOS LINEA DE ADUCCION-ADICIONAL
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE LEONCIO PRADO
HUANUCO
SUB
: SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
PROYECTO
LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO
FECHA: Apr-17
01.04.02.02 REFINE, NIVELACION Y FONDOS PARA TUB. DE 90MM ML 1.00 214.72 214.72
LINEA DE ADUCCION ML 214.72 1.00 214.72
01.04.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO, INC. CAMA ARENA 10 CM M3 1.00 51.53 51.53
RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 214.72 0.24 51.53
01.04.05.02 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 45 UND 2.00 2.00
CODO PVC 3" (90mm) x 45 UND 2.00
01.04.05.03 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 90 UND 2.00 2.00
CODO PVC 3" (90mm) x 90 UND 2.00
METRADOS LINEA DE CONDUCCION
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE
LEONCIO PRADO HUANUCO
SUB
:
PROYECTO SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO
01.03.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO, INC. CAMA ARENA M3 1.00 586.36 586.36
Tuberias de = 3" (75MM) 2,443.18 0.24 586.36
01.03.02.04 RELLENO COMPACTADO DE ZANJAS M3 351.82 351.82
Tuberias de = 3" (75MM) 2,443.18 0.12 293.18 Compactacion 20% 351.82
01.03.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON TRANSPORTE M3 628.87 628.87
VOLUMEN DE EXCAVACION X 1.30% (Factor Esponj.) M3 Esponjamiento 30% 628.87
01.03.05 ACCESORIOSYPARA
SUMINISTRO TUBERIASCODO PVC SAP UF 3" (90mm) x
COLOCACION
01.03.05.01 22.5 UND 5.00 5.00
CODO PVC 3" (90mm) x 22.5 UND 5.00
01.03.05.02 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 45 UND 5.00 5.00
CODO PVC 3" (90mm) x 45 UND 5.00
01.03.05.03 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 90 UND 5.00 5.00
CODO PVC 3" (90mm) x 90 UND 5.00
METRADOS LINEA DE ADUCCION
PROYECTO : MEJORAMIENTO Y AMPLIACION DE LOS SISTEMAS DE AGUA POTABLE, DESAGUE Y LETRINAS DEL CASERIO DE SANTA ROSA DE SHAPAJILLA, DISTRITO DE LUYANDO DE LA PROVINCIA DE LEONCIO PRADO
HUANUCO
SUB
: SISTEMA DE AGUA POTABLE SANTA ROSA DE SHAPAJILLA
PROYECTO
LOCALIDAD: S.R. SHAPAJILLA DISTRITO: LUYANDO PROVINCIA: LEONCIO PRADO REGION: HUNUCO
01.04.02.02 REFINE, NIVELACION Y FONDOS PARA TUB. DE 90MM ML 1.00 783.00 783.00
LINEA DE ADUCCION ML 783.00 1.00 783.00
01.04.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO, INC. CAMA ARENA 10 CM M3 1.00 187.92 187.92
RESERVORIO - INICIO DE RED DE DISTRIBUCION M3 783.00 0.24 187.92
01.04.05.02 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 45 UND 8.00 8.00
CODO PVC 3" (90mm) x 45 UND 8.00
01.04.05.03 SUMINISTRO Y COLOCACION CODO PVC SAP UF 3" (90mm) x 90 UND 8.00 8.00
CODO PVC 3" (90mm) x 90 UND 8.00
PROYECTO :
MEJORAMIENTO Y A
SUB PROYECTO :
SISTEMA DE AGUA P
Tuberias de = 2 1/2" (7
Tuberias de = 1 1/2" (4
Tuberias de = 2 1/2" (7
Tuberias de = 1 1/2" (4
Tuberias de = 2 1/2" (7
Tuberias de = 1 1/2" (4
Tuberias de = 2 1/2"
N
Tuberias de = 2"
Tuberias de = 1 1/2
Tuberias de = 1"
Tuberias de = 3/4"
N
Tuberias de = 2 1/2" (7
Tuberias de = 1 1/2" (4
Tuberias de = 2 1/2" (7
Tuberias de = 1 1/2" (4
ELIMINACION DE MATE
N
Tuberias de = 2 1/2" (7
Tuberias de = 1 1/2" (4
REDUCCION PVC DE
REDUCCION PVC DE
N
REDUCCION PVC DE
REDUCCION PVC DE
REDUCCION PVC DE
REDUCCION PVC DE
REDUCCION PVC DE
REDUCCION PVC DE
DISTRITO:
HECHO POR :
DESCRIPCION
RED DE DISTRIBUCION
TRABAJOS PRELIMINARES
MOVIMIENTOS DE TIERRA
Tuberias de = 2 1/2"
DESCRIPCION
Tuberias de = 2"
Tuberias de = 1 1/2
Tuberias de = 1"
Tuberias de = 3/4"
DESCRIPCION
PRUEBAS HIDRAULICAS
LUYANDO
JPPM
DESCRIPCION
DESCRIPCION
TEO DE ZANJAS
DESCRIPCION
AS, T-NORMAL
JAS
DESCRIPCION
EDENTE
DESCRIPCION
"
"
DESCRIPCION
/4"
"
4"
MEDIDAS
ML
ML 267.68
ML 1,803.70
MEDIDAS
ML 1,596.37
ML 4,592.48
ML 1,061.54
ML
ML 267.68
ML 1,803.70
ML 1,596.37
ML 4,592.48
ML 1,061.54
MEDIDAS
M3
ML
ML 267.68
MEDIDAS
ML
ML 1,803.70
ML
ML 1,596.37
ML
ML 4,592.48
ML
ML 1,061.54
MEDIDAS
M3
M3
M3
MEDIDAS
ML
ML 267.68
ML
ML 1,803.70
ML
ML 1,596.37
ML
MEDIDAS
ML 4,592.48
ML
ML 1,061.54
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
UND
UND
MEDIDAS
UND
UND
UND
UND
UND
ML
ML 9,321.77
MEDIDAS
N S
DE
VOLUMENVECES LONG. AREA
1.00 9,321.77
1.00 267.68
1.00 1,803.70
N S
DE
VOLUMENVECES LONG. AREA
1.00 1,596.37
1.00 4,592.48
1.00 1,061.54
1.00 9,321.77
1.00 267.68
1.00 1,803.70
1.00 1,596.37
1.00 4,592.48
1.00 1,061.54
N S
DE
VOLUMENVECES LONG. AREA
1.00 2,579.86
1.00 104.40
1.00 703.44
1.00 415.06
1.00 1,102.20
1.00 254.77
1.00 267.68
1.00 267.68
N S
DE
VOLUMENVECES LONG. AREA
1.00 1,803.70
1.00 1,803.70
1.00 1,596.37
1.00 1,596.37
1.00 4,592.48
1.00 4,592.48
1.00 1,061.54
1.00 1,061.54
N S
DE
VOLUMENVECES LONG. AREA
1.00 1,798.15
1.00 71.74
1.00 483.39
1.00 279.36
1.00 785.31
1.00 178.34
1.00
Esponjamiento 30%
N S
DE
VOLUMENVECES LONG. AREA
1.00 267.68
1.00 267.68
1.00 1,803.70
1.00 1,803.70
1.00 1,596.37
1.00 1,596.37
1.00 4,592.48
N S
DE
VOLUMENVECES LONG. AREA
1.00 4,592.48
1.00 1,061.54
1.00 1,061.54
N S
DE
VOLUMENVECES LONG. AREA
1.00
1.00
1.00
1.00
1.00
1.00
2.00
N S
DE
VOLUMENVECES LONG. AREA
2.00
1.00
1.00
7.00
7.00
1.00
1.00
N S
DE
VOLUMENVECES LONG. AREA
2.00
2.00
1.00
1.00
7.00
7.00
7.00
7.00
N S
DE
VOLUMENVECES LONG. AREA
4.00
4.00
10.00
10.00
2.00
2.00
3.00
N S
DE
VOLUMENVECES LONG. AREA
3.00
11.00
11.00
16.00
16.00
9.00
9.00
N S
DE
VOLUMENVECES LONG. AREA
15.00
15.00
37.00
37.00
1.00
1.00
2.00
2.00
N S
DE
VOLUMENVECES LONG. AREA
1.00
1.00
2.00
2.00
5.00
5.00
6.00
N S
DE
VOLUMENVECES LONG. AREA
6.00
1.00
1.00
15.00
15.00
1.00 9,321.77
1.00 9,321.77
N S
DE
VOLUMENVECES LONG. AREA
ABLE
ROSA DE SHAPAJILLA, DISTRITO DE LUYAN
HUNUCO
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
Compactacion 20%
Compactacion 20%
SUB TOTAL
VOL.
Compactacion 20%
Compactacion 20%
Compactacion 20%
1,682.95
1,682.95
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
SUB TOTAL
VOL.
LLA, DISTRITO DE LUYANDO DE LA PROVINC
NUCO
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
925.66
38.55
259.73
SUB TOTAL
KG.
160.91
374.75
91.72
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
SUB TOTAL
KG.
LUYANDO DE LA PROVINCIA
TOTAL
9,321.77
TOTAL
9,321.77
TOTAL
2,579.86
267.68
TOTAL
1,803.70
1,596.37
4,592.48
1,061.54
TOTAL
1,798.15
925.66
TOTAL
1,682.95
TOTAL
267.68
1,803.70
1,596.37
4,592.48
TOTAL
1,061.54
TOTAL
1.00
1.00
1.00
2.00
TOTAL
1.00
7.00
1.00
TOTAL
2.00
1.00
7.00
7.00
TOTAL
4.00
10.00
2.00
3.00
TOTAL
11.00
16.00
9.00
TOTAL
15.00
37.00
1.00
2.00
TOTAL
1.00
2.00
5.00
6.00
TOTAL
1.00
15.00
9,321.77
TOTAL
PROYECTO :
MEJORAMIENTO Y
SUB PROYECTO :
SISTEMA DE AGUA P
CONEXIONES DOMICILI
N
CONEXIONES DOMICILI
CONEXIONES DOMICILI
CONEXIONES DOMICILI
CONEXIONES DOMICILI
CONEXIONES DOMICILI
ELIMINACION DE MATER
VEREDA DE CONEXIO
VEREDA DE CONEXIO
VEREDA DE CONEXIO
VEREDA DE CONEXIO
VEREDA DE CONEXIO
N
VEREDA DE CONEXIO
UA DE VEREDA
DEDUCTIVO TAPA PR
VEREDA DE CONEXIO
INSTALACION DE CONEXIO
01.09.03.01 21 mm DESDE LA MATRIZ
N
CONEXIONES DOMICILI
CONEXIONES DOMICILI
MEJORAMIENTO Y AMPLIACION DE LO
DISTRITO:
HECHO POR
DESCRIPCION
TRABAJOS PRELIMINARES
CONEXIONES DOMICILIARIAS
DESCRIPCION
CONEXIONES DOMICILIARIAS
MOVIMIENTO DE TIERRAS
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS
CONEXIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
RELLENO COMPACTADO
CONCRETO SIMPLE
UA DE VEREDA
CONEXIONES DOMILICIARIAS
CONEXIONES DOMICILIARIAS
PRUEBAS HIDRAULICAS
CONEXIONES DOMICILIARIAS
METRADOS CON
AMPLIACION DE LOS SISTEMAS DE AGUA PO
LUYANDO DE LA
LUYANDO
JPPM
DESCRIPCION
S (183 UNIDADES)
UAL
RIAS
DESCRIPCION
LANTEO DE ZANJAS
RIAS
ANJAS, T-NORMAL
RIAS
RIAS
RIAS
ZANJAS
RIAS
AL EXCEDENTE
OMICILIARIA
MANUAL
DESCRIPCION
N DOMICILIARIA
EPLANTEO
N DOMICILIARIA
PARA VEREDA
N DOMICILIARIA
PISONADO
N DOMICILIARIA
N DOMICILIARIA
DESCRIPCION
N DOMICILIARIA
FRADO NORMAL
N DOMICILIARIA
RIAS
RIAS
OS CONEXIONES DOMICILIARIAS
AGUA POTABLE, DESAGUE Y LETRINAS DEL
O DE LA PROVINCIA DE LEONCIO PRADO H
PROVINCIA:
MEDIDAS
ML
ML 4.27
MEDIDAS
ML
ML 4.27
M3
ML
ML 1,153.88
M3
MEDIDAS
M3
M3
M2
MEDIDAS
M2 1.00 1.00
M2
M2 1.00 1.00
M3
M2
M2 1.00 1.00
M3
M3
M2
M2 3.00 0.15
UND
MEDIDAS
UND
ML
ML 4.27
ARIAS
NAS DEL CASERIO DE SANTA ROSA DE SHA
PRADO HUANUCO
LEONCIO PRADO
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.
270.00 4.27
1.00 4.27
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.
270.00 4.27
1.00 4.27
1.00 276.93
0.24 276.93
1.00 1,153.88
1,153.88
1.00 189.24
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.
0.16 189.24
1.00
0.08 87.69
Compactacion 20%
Esponjamiento 30%
1.00 270.00
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.
270.00 270.00
1.00 270.00
270.00 270.00
1.00 54.00
270.00 54.00
1.00 270.00
270.00 270.00
1.00 27.00
270.00 27.00
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.
1.00 25.38
270.00 27.00
270.00 2.70
-270.00 -4.32
1.00 121.50
270.00 121.50
1.00
N SUB TOTA
DE
AREA VOLUMEN VECES LONG.
270.00
1.00 1,153.88
270.00 1,153.88
SA DE SHAPAJILLA, DISTRITO DE
REGIHUNUCO
SUB TOTAL
TOTAL
1,153.88
SUB TOTAL
TOTAL
1,153.88
276.93
1,153.88
189.24
SUB TOTAL
TOTAL
105.23 105.23
105.23
174.01 174.01
174.01
270.00
SUB TOTAL
TOTAL
270.00
54.00
270.00
27.00
SUB TOTAL
TOTAL
25.38
121.50
270.00
SUB TOTAL
TOTAL
1,153.88