Labours
Productivity Rate productivity per
Activity Type UNIT Hour Rate
(Unit/Man/Hour) day
(AED/Hour)
0.35 0.25
0.63 0.44
33.33 23.33
10.00 7.00
3.33 2.33
0.67 0.47
0.80 0.56
1.43 1.00
1.43 1.00
4.00 2.80
0.80 0.56
0.10 0.07
0.40 0.28
0.80 0.56
1.43 1.00
1.43 1.00
0.77 0.54
1.67 1.17
1.00 0.70
3.33 2.33
Nominal Productivity Rate Table
Water Proofing Work
Max.
Company
Labours
Productivity Rate Standard
Activity Type UNIT Hour Rate
(Unit/Man/Hour) Labour
(AED/Hour)
Rate
(AED/Unit)
0.19
0.93
0.70
0.70
1.40
0.70
0.70
0.70
0.70
2.00
Nominal Productivity Rate Table
Plywood &
Cup Paschal
Doka Peri
Lock
Productivit Productivit
System Productivit
Activity Type Scope of Work UNIT y Rate y Rate
Productivit y Rate
(Unit/Man/ (Unit/Man/
y Rate (Unit/Man/
Hour) Hour)
(Unit/Man/ Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Grouns slab Shutter Shutter, Scaffolding is m 0.35 0.50
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Steps Shutter Shutter, Scaffolding is m 0.35 0.50
Erected by others for
casting
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Paschal
Doka Peri
Lock
Productivit Productivit
System Productivit
Activity Type Scope of Work UNIT y Rate y Rate
Productivit y Rate
(Unit/Man/ (Unit/Man/
y Rate (Unit/Man/
Hour) Hour)
(Unit/Man/ Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Normal Stair Case Shutter Shutter, Scaffolding is m 0.63 0.90
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Decorative Stair Case Shutter, Scaffolding is m 0.35 0.50
Erected by others for
casting
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Paschal
Doka Peri
Lock
Productivit Productivit
System Productivit
Activity Type Scope of Work UNIT y Rate y Rate
Productivit y Rate
(Unit/Man/ (Unit/Man/
y Rate (Unit/Man/
Hour) Hour)
(Unit/Man/ Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Retaining Walls Shutter (Single Side) up
Shutter, Scaffolding is m 0.63 0.90
to 3.5m Height
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Retaining Walls Shutter (Single Erected by others for
m 0.63 0.90
Side)More Than 3.5 3m Height casting, plat forms
used to work at
heigher Level is
produced by Others
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Paschal
Doka Peri
Lock
Productivit Productivit
System Productivit
Activity Type Scope of Work UNIT y Rate y Rate
Productivit y Rate
(Unit/Man/ (Unit/Man/
y Rate (Unit/Man/
Hour) Hour)
(Unit/Man/ Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Retaining Walls Shutter (Double Side)
Shutter, Scaffolding is m 0.63 0.90
up to 3.5m Height
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Retaining Walls Shutter (Double)More Erected by others for
m 0.63 0.90
Than 3.5 3m Height casting, plat forms
used to work at
heigher Level is
produced by Others
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Paschal
Doka Peri
Lock
Productivit Productivit
System Productivit
Activity Type Scope of Work UNIT y Rate y Rate
Productivit y Rate
(Unit/Man/ (Unit/Man/
y Rate (Unit/Man/
Hour) Hour)
(Unit/Man/ Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Columns Shutter (Less Than 40X40) up Erected by others for
m 0.63 0.90
to 3.5m Height casting, plat forms
used to work at
heigher Level is
produced by Others
Aluma Miva
Productivit Productivi
y Rate ty Rate
(Unit/Man/ (Unit/Man/
Hour) Hour)
Aluma Miva
Productivit Productivi
y Rate ty Rate
(Unit/Man/ (Unit/Man/
Hour) Hour)
Aluma Miva
Productivit Productivi
y Rate ty Rate
(Unit/Man/ (Unit/Man/
Hour) Hour)
Aluma Miva
Productivit Productivi
y Rate ty Rate
(Unit/Man/ (Unit/Man/
Hour) Hour)
Aluma Miva
Productivit Productivi
y Rate ty Rate
(Unit/Man/ (Unit/Man/
Hour) Hour)
Nominal Productivity Rate Table
Concrete Pouring for PCC 50 mm (Raft and Strip m 0.75 10 13.33 9.33
Footing)
Concrete Pouring for PCC 100 mm (Raft and Strip
m 1 10 10.00 7.00
Footing)
Concrete Pouring for PCC 50 mm (With Shaping) m 0.5 10 20.00 14.00
Concrete Pouring for PCC 100 mm (With Shaping) m 0.65 10 15.38 10.77
Concrete Pouring for PCC 50 mm For Single Footing m 0.6 10 16.67 11.67
Concrete Pouring for PCC 100 mm For Single Footing m 0.9 10 11.11 7.78
Concrete Pouring for PCC 50 mm For Tie Beams m 0.4 10 25.00 17.50
Concrete Pouring for PCC 100 mm For Tie Beams m 0.6 10 16.67 11.67
Concrete Pouring for Single Footing m 2.5 10 4.00 2.80
Concrete Pouring For Strip Footing m 3 10 3.33 2.33
Concrete Pouring For Raft Footing m 4 10 2.50 1.75
Concrete Pouring For Walls m 1.5 10 6.67 4.67
Concrete Pouring For Columns m 1.5 10 6.67 4.67
Concrete Pouring For Slabs m 3 10 3.33 2.33
Productivity Rate
Activity Type UNIT
(Unit/Man/Hour)
10 0.56 0.39
10 0.83 0.58
10 0.50 0.35
10 0.77 0.54
10 0.40 0.28
10 0.59 0.41
10 0.33 0.23
10 0.50 0.35
10 0.29 0.20
10 0.42 0.29
10 0.25 0.18
10 0.17 0.12
10 0.14 0.10
10 0.13 0.09
10 0.07 0.05
10 0.06 0.04
10 0.05 0.04
10 0.04 0.03
10 0.04 0.03
10 0.03 0.02
10 0.03 0.02
10 0.20 0.14
10 0.13 0.09
10 0.09 0.06
10 0.06 0.05
10 0.05 0.04
10 0.03 0.02
Nominal Productivity Rate Table
Operations Department Tiling Works
Max. Company
Productivity Rate Labours Hour Rate Standard Labour
Activity Type UNIT productivivty per day
(Unit/Man/Hour) (AED/Hour) Rate
(AED/Unit)
10.00 14.28571
20.00
9.33
8.75
8.24
7.78
7.37
12.73
23.33
11.67
10.77
10.00
9.33
8.75
11.67
23.33
10.77
10.00
9.33
8.75
14.00
28.00
12.73
11.67
10.77
10.77
Trojan Holding Nominal Productivity Rate Table
Operations Department Tiling Works
Skirting Works
20CM Lm 2 10 5.00 3.50
30CM Lm 2.5 10 4.00 2.80
40CM Lm 3 10 3.33 2.33
50CM Lm 3.5 10 2.86 2.00
60CM Lm 4 10 2.50 1.75
Max. Company
Productivity Rate Labours Hour Rate Standard Labour
Activity Type UNIT productivity per day
(Unit/Man/Hour) (AED/Hour) Rate
(AED/Unit)
Ceiling
Primar Application ( Normal Ceiling) m 20 160 10 0.50
Grooves Preperation in the Ceiling Lm 5 40 10 2.00
Grooves Stucoo every coat Lm 5 40 10 2.00
Putty Application ( Single Coat) m 10 80 10 1.00
Putty Application ( Two Coat) m 5 40 10 2.00
Sanding for Second Coat Only m 10 80 10 1.00
Painting First Coat m 20 160 10 0.50
Touchup Beefore Final Coat m 25 200 10 0.40
Painting Final Coat m 16 128 10 0.63
Internal Walls 0
Primar Application m 25 200 10 0.40
Putty Application ( Single Coat) m 12 96 10 0.83
Putty Application ( Two Coat) m 6 48 10 1.67
Sanding for Second Coat Only m 12 96 10 0.83
Touch up Before Final Coat m 30 240 10 0.33
Painting First Coat m 25 200 10 0.40
Painting Final Coat m 20 160 10 0.50
0
External Paint 0
Primar Application m 40 320 10 0.25
GRC and Decorative Items (in each coat) Lm 10 80 10 1.00
Texture Coating (Spray) m 12.5 100 10 0.80
Weather Proof Paint Application Per Coat m 25 200 10 0.40
0
Scaffolding Works m 4 32 10 2.50
Logistics Works m 10 80 10 1.00
Low. Company Standard
Labour Rate Remarks
(AED/Unit)
0.35
1.40
1.40
0.70
1.40
0.70
0.35
0.28
0.44
0.28
0.58
1.17
0.58
0.23
0.28
0.35
0.18
0.70
0.56
0.28
0.4 0.32
1.75
0.70
Nominal Productivity Rate Table
Operations Department Block Works
Solid Block 4",6", 8" (Up to 1.5m Height) m 0.6 10 16.67 11.67
Solid Block 4",6", 8" (From 1.5m to 3m Height) m 0.4 10 25.00 17.50
Hollow Block 4",6", 8" (Up to 1.5m Height) m 0.7 10 14.29 10.00
Hollow Block 4",6", 8" (From 1.5m to 3m Height) m 0.5 10 20.00 14.00
Light Weight Block with Glue m 1 10 10.00 7.00
Curing for Plaster Works (Per once Per Day) m 100 10 0.10 0.07
Remarks
Nominal Productivity Rate Table
Operations Department Survey Works
Max. Company
Productivity Rate Labours Hour Rate Standard Labour
Activity Type UNIT
(Unit/Man/Hour) (AED/Hour) Rate
(AED/Unit)
3.27
9.80
9.80
4.90
39.20
3.27
9.80
9.80
9.80
39.20
490.00
98.00
Nominal Productivity Rate Table
Operations Department AC Works
Operations Department