DESIGN OF GUY ANCHOR FOUNDATION


1
STRUCTURAL ENGG HB-PG 5-83
2
INPUT
3
vertical component of guy tension 12000
4
horizontal component of guy tension 3000
5
unit wt of soil- for submerged reduce by 60 pcf 100
6
unit wt of concrete- for submerged reduce by 60 pcf 150
7
angle of shearing resistance- phi 30
8 -when backfill is silt or clay assume 20 degree and for granular fill 30
degree
coeff of earth pressure at rest 0.5
9 -when backfill is silt or clay assume 0.4 and for granular fill 0.5
cohesion of soil 0
10
depth at top of anchor weight-ft 3
11
thickness of anchor weight-ft 5
12
width of anchor -ft 7
13
length of anchor - ft 10
14
factor of safety for vertical and horizontal 2
15 component of guy tension

shearing resistance at top of anchor (S1) as given on sheet S1 2500


16
shearing resistance at bottom of anchor(S2)-neglected 0
17
CALCULATIONS
18
A B
factored horizontal component of guy tension 6,000
19
factored vertical component of guy tension 24,000
20
total depth of anchor 8
21
perimeter of the section 24
22
N phi angle 3
23
wt of soil above pier-pcf 21000
24
wt of pier-pcf 52500
25
shearing resistance at top of anchor (S1) as given on sheet S1 17500
26
shearing resistance on end of anchor(S3) 20207
27
shearing resistnce on perimeter of anchor(S4) 41,569
28
shearing resistnce on soil above anchor-S5 12,124
29
active earth pressure on back of anchor 16,000
30
passive earth pressure on front of anchor 64,000
31
criteria one 83,557
32
criteria two 100,238
33
criteria three 105,915
34
criteria four 127,194
35
max for horizontal pull 127,194
36
A B
DESIGN IS OK
37
max for vertical pull 105915
38
DESIGN IS OK
39