Award Date Bams No Project Job Piece County Name

02-06-2017 160306 ACSTP-273C(025)SS 24366(04) Wagoner

12-05-2016 160425 NHPPI-0240-1(358)004SS 9032(17) Oklahoma


12-05-2016 160427 SSP-3500(049)SS/SSP-4000* 31008(04) Oklahoma

03-06-2017 170061 SSP-4000(041)SS/SBR-4000* 27023(04) Beckham

04-10-2017 170128 STP-247B(017) 29446(04) Major

10-03-2016 160315 ACSTP-217C(029)SS 28036(04) Cotton


04-10-2017 170123 STP-234B(014)SS 27977(04) Jefferson

10-03-2016 160245 ACSTP-219C(033)SS 27075(04) Creek


02-06-2017 170053 ACNHPPI-4400-(016)(014)(* 28872(04) Tulsa
02-06-2017 170054 NHPPIY-2440-(014)(013) 29071(04) Tulsa
03-06-2017 170103 STP-172B(399(398)(456)IG 25211(04) Tulsa
04-10-2017 170142 ACNHPPI-4440-(002)(003)S* 28865(04) Tulsa
04-10-2017 170144 NHPP-272A(126)3B/SSP-272* 31672(04) Tulsa
Highway

SH-16

I-240/I-3
I-35/I-40

I-40

US-60

US-277
SH-79

US-75A
IS-44
CT. ST.
CT. ST.
CT. ST.
US-169
Description

6.050 MILES:GRADE, DRAIN, SURFACE, AND BRIDGE:SH-16: FROM 0.1 MILES NORTH OF THE SH-51 JUN

0.962 MILE:GRADE, DRAIN, AND SURFACE:I-240/I-35: FROM SHIELDS BOULEVARD, EXTEND EAST ON I-
6.41 MILES:PAVEMENT REHABILITATION:I-35: FROM NE 122ND ST, EXTEND NORTH IN THE CITY OF EDM

2.728 MILES:RESURFACE (ASPHALT) AND BRIDGE REHABILITATION:I-40: FROM SH-34 SOUTH, EXTEND

0.851 MILE:BRIDGE AND APPROACHES:US-60: OVER THE NORTH CANADIAN RIVER, 2.2 MILES NORTH O

1.124 MILES:BRIDGE AND APPROACHES:US-277: OVER DEEP RED CREEK AND OVERFLOWS, 0.7 MI, 1.0
1.189 MILES:BRIDGE AND APPROACHES:SH-79: OVER THE RED RIVER, 0.5 MILES NORTH OF THE TEXA

0.667 MILE:BRIDGE AND APPROACHES:US-75A: OVER BNSF RAILROAD, 1.9 MILES NORTH OF THE OKM
0.170 MILE:BRIDGE REHABILITATION:I-44/GILCREASE EXPWY RAMP: OVER I-244, CITY ST, CNTY RD, TS
0.121 MILE:BRIDGE REHABILITATION:CITY STREETS (HARVARD AVE/PITTSBURG AVE/YALE AVE/ MEMORI
2.218 MILES:GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNALS:CITY STREET (W MAIN STREET/W. 96TH
0.240 MILES:BRIDGE REHABILITATION:CITY STREETS: OVER I-444 AND US-75, AT MULTIPLE LOCATIONS
0.240 MILES:RESURFACE (ASPHALT) AND JOINT SEAL REPAIR:US-169: AT MULTIPLE LOCATIONS IN DIVIS
Division
Number Residency Name

1 MUSKOGEE

4 OKLAHOMA CITY
4 EDMOND

5 CLINTON

7 DUNCAN
7 DUNCAN

8 SAND SPRINGS
8 TULSA
8 TULSA
8 Atkins
8 TULSA
8 TULSA
Vendor Name

BECCO CONTRACTORS, INC.

DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV


DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV

CORNELL CONSTRUCTION COMPANY, INC.

FRONTIER BRIDGE, INC.

OVERLAND CORPORATION
FRONTIER BRIDGE, INC.

MANHATTAN ROAD & BRIDGE COMPANY


BECCO CONTRACTORS, INC.
MANHATTAN ROAD & BRIDGE COMPANY
NABHOLZ CONSTRUCTION CORPORATION
BECCO CONTRACTORS, INC.
APAC-CENTRAL, INC.
Original
Contract Current Contract Amount
Amount Amount Paid Funds Available

$8,084,675.09 $8,084,675.09 $0.00 $8,084,675.09

$7,787,208.07 $7,787,208.07 $0.00 $7,787,208.07


$10,629,506.29 $10,629,506.29 $81,502.96 $10,548,003.33 The amount paid on t

$14,277,000.00 $14,277,000.00 $0.00 $14,277,000.00

$8,097,436.74 $8,097,436.74 $0.00 $8,097,436.74

$6,804,603.73 $6,804,603.73 $0.00 $6,804,603.73


$9,629,728.25 $9,629,728.25 $0.00 $9,629,728.25

$6,283,092.30 $6,283,092.30 $0.00 $6,283,092.30


$10,544,739.61 $10,544,739.61 $0.00 $10,544,739.61
$11,164,064.48 $11,164,064.48 $0.00 $11,164,064.48
$5,360,055.79 $5,360,055.79 $0.00 $5,360,055.79
$9,256,000.00 $9,256,000.00 $0.00 $9,256,000.00
$5,915,032.62 $5,915,032.62 $0.00 $5,915,032.62
he amount paid on this project is for Material-on-Hand only.