Академический Документы
Профессиональный Документы
Культура Документы
Doing better
Adani Group
2
Adani Group: New Form & New Substance
Structure
Promoters
56.26% 58.13%
75.00%
75.00%
Public
3
Adani Group - Business
* Under Finalization 4
Resources Logistics Energy
Power
Coal Trading Sea Ports
Generation
Coal Mining Railways Transmission
Agro
5
Indian Coal: Supply Side
Incremental
Production of
Coal Ministry: India Coal Reserves 420 MMPTA by
125 Bn MT 60.6 Bn MT* FY20
Recent Coal Auctions (194 MMTPA) will take care of the ~48 GW1 generation capacity
Projects Stuck: 74 GW* - Coal Req: 333 MMTPA @4.5 MMTPA per
GW for coal GCV
Additional Capacity by FY20: 63 GW** - Coal Req: 284 MMTPA 3500 Kcal/Kg
Incremental production would be ~420 MMTPA (220 (CIL) + 200 (to be auctioned))
200
205 205
2015 2020
Parli
Ramagundam Vishakhaptnam
Simhadri
Kondapalli Gangavaram Muara Satui
TanjungIndonesia
Kakinada
Pemancingan
Richard Bay Goa
South Ennore
North Chennai
Africa Mettur Tuticorin
Queensland
Ports
Australia
Locations served Tuticorin
A team of 200+ People with operations spread across globe through our 25 satellite offices, 18 branch
offices, 3 global offices and a head office based out of Gurgaon
8
MDO Another Big Growth Opportunity
Allocation / Auction
Reserves: 8.1 Bn MT
Production FY15: 54 MMT
Peak Production: 217 MMTPA
State Chhattisgarh
Parsa Kente
Parsa -Kente
Mine (RRVUNL) (RRVUNL)
Extension
(RRVUNL)
Kente Ext
Dahej Port Mineable Reserve 452 150 200
Hazira Port Dhamra (Mn MT)
Commencement Started
2018 2019
of Production Feb 13
Ports
Mining Locations
Notes:
1. RRVUNL Rajasthan Rajya Vidyut Utpadan Nigam Limited ; 2. MGCL Mahaguj Collieries Ltd. ; 3. CSPGCL Chhattisgarh State Power Generation Company 10
Limited 4. UCMCCL - UCM Coal Company Limited
Coal Mining: Indonesia
Bunyu Island
Coal Mining
Indonesia
Particulars Capacity
Bunyu Island, Coal Crushing
Location
Indonesia
Resource 269 MMT (JORC)
11
Australia Mine: Funding Plan and Timeline
USD mn
12
Agro
Edible Oil & Agro commodities
Joint venture with Wilmar, Singapore
FORTUNE - Indias number 1 edible oil brand with more than 20% market share
(AC Nielson)
Revenues in excess of $ 2.5 Bn
Volumes more than 3.5 MMTPA
Expanding into more agro products such as Rice, Pulses. Soya nuggets etc
Major Exporter of Castor Oil/derivatives and Soya De-oiled cake
Manufacturing facilities spread across 18 locations pan India with 10k refining
& 7k crushing capacity
Agri
AgriInfrastructure: Food
Infrastructure: Grains
Food Grains
Operates storage capacities of 6,00,000 MT at 7 locations across India
Another 3,50,000 MT in development across 7 locations in Madhya Pradesh
State of Art mechanized storage facilities with private railway siding
Operates storages facilities under Build Own Operate model for FCI for 20 years
13
Resources Logistics Energy
Power
Coal Trading Sea Ports
Generation
Coal Mining Railways Transmission
Agro
14
Ports & Logistics: Huge Growth Potential
Only pan India port company with 8
ports across Indian coastline
7 operational ports; 1 under
Ports implementation
Multi Commodity Ports: >300 mtpa
capacity
Preferred Indian Partner of Global Liners
Kandla
Mundra
Established connectivity infrastructure
Dahej including rail, road and pipe line
Hazira Dhamra
120 km railway line on the west coast; 63
Logistics km railway line at Dhamra on the east
Vizag
Development of Inland Container Depots
Mormugao and container rail movements across
country
Ennore
15
Ports & Logistics: DFC / DMIC - the Growth Catalysts
Feature Existing DFC
Container stack Single Double
Train length 700m 1,500m
Train load 4,000 tons 15,000 tons
Axle load 22 tons 32 tons
Maximum speed 75 km/ hr 100 km/ hr New Delhi
Gurgaon
Mathura
Status Alwar
Jaipur Agra
Mundra to be connected to DFC through Ajmer
Palanpur ( ~350 km) Marwar
Kota
To be connected via Kutch Railway Company Bhildi Palanpur
Adipur
Ltd. (Budget for dovetailing to DFC Ratlam
Samakhiali
approved) Kandla
Mundra Vadodara Godhara
Advantage: Port Dahej
Surat
Faster trains, improving transit time by 50% Hazira
Pipavav
Vasai Road
Higher capacity trains, increased capacity of
JNPT
infrastructure
Dhamra
NW 5
Master Plan of Total 17 berths;
Dhamra:
Mega Port in 12 bulk, 4 container, 1 LNG Terminal
the making
Phased Growth to reach 100 mtpa
Power
Coal Trading Sea Ports
Generation
Coal Mining Railways Transmission
Agro
18
Power: Sectoral Demand continue to rise
Peak & Energy Deficit : Year-wise Installed Capacity in India - Category
Units in GW
17% 347
14%
12% 13% 13% 288
12%
11% 32
11%
10% 10% 9% 25 19
8%
9% 9%
8% 9% 200 10 57
5% 25 50
4% 5%
4%
5 240
39 204
132
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
Peak Deficit Energy Deficit
2012 2017 2020
Average Deficit in the Last Decade:
Thermal Hydro Nuclear Renewables
Peak deficit: 11%; Energy deficit: 8%
India Installed Capacity: 273 GW*
Lowest per capita electricity consumption
Hydro
16000 Thermal 41 GW
14000 13361 189 GW
12000
10000 Renewables
36 GW
kWh
8000 6460
5741
6000
4000 2942 Nuclear
2384
917 6 GW
2000
0
USA Russia UK China Brazil India
Capacity Operation
SN Location
(MW) (MW)
Bitta
3 Kawai (Rajasthan) 1,320 1,320
Korba
4 Udupi (Karnataka) 1,200 1,200
Mundra
Tiroda
5 Korba (Chhattisgarh)1 600 600
Udupi
6 Bitta (Gujarat)2 40 40
1. Under finalization, 20
2. 40 MW Solar Power Project
Power: PPA & Fuel Arrangement
Further Reforms
21
Power Transmission
Aurangabad Warora
10,000
5,051
FY15 FY20
22
Adani Group: Business Process Transformation
BPT of Power Operations Group with ATK: BPT of Ports Operations Group with KPMG :
Strategic Planning Marine Operations
Revenue Management Terminal Operations
Operations and Maintenance Engineering Services
Fuel Sourcing and Mgmt. Customer Service & Marketing
23
Adani Group: CSR Initiatives
Quality education
Health
Livelihood development
24
Adani Group: Our Leadership Position
Leadership Position
Leadership Position in Ports 8 Ports
Our Leadership Position as Private Sector
Generation Co 11,080 MW
Transmission Network 5,051 circuit kms
Coal Trading
Mine Developer and Operator
Sustainable
Growth of
Business
Favorable Macroeconomic Environment
Clear Policy
Framework
25
Legal disclaimer
Certain statements made in this presentation may not be based AEL assumes no responsibility to publicly amend, modify or
on historical information or facts and may be forward-looking revise any forward looking statements, on
statements, including those relating to general business plans the basis of any subsequent development, information or
and strategy of Adani Enterprises Limited (AEL) and Adani events, or otherwise. Unless otherwise stated in this document,
Ports and Special Economic Zone Limited (APSEZ) & Adani the information contained herein is based on management
Power Limited (APL), their future outlook and growth information and estimates. The information contained herein is
prospects, and future developments in their businesses and subject to change without notice and past performance is not
their competitive and regulatory environment, and statements indicative of future results. AEL may alter, modify or otherwise
which contain words or phrases such as will, expected to, change in any manner the content of this presentation, without
etc., or similar expressions or variations of such expressions. obligation to notify any person of such revision or changes.
Actual results may differ materially from these forward-looking No person is authorized to give any information or to make
statements due to a number of factors, including future any representation not contained in and not consistent with
changes or developments in their business, their competitive this presentation and, if given or made, such information
environment, their ability to implement their strategies or representation must not be relied upon as having been
and initiatives and respond to technological changes and authorized by or on behalf of AEL. This presentation is strictly
political, economic, regulatory and social conditions in India. confidential.
This presentation does not constitute a prospectus, offering This presentation does not constitute an offer or invitation
circular or offering memorandum or an offer, or a solicitation to purchase or subscribe for any securities in any jurisdiction,
of any offer, to purchase or sell, any shares and should not including the United States. No part of its should form the
be considered as a recommendation that any investor should basis of or be relied upon in connection with any investment
subscribe for or purchase any of AELs shares. Neither this decision or any contract or commitment to purchase or
presentation nor any other documentation or information (or subscribe for any securities. None of our securities may be
any part thereof) delivered or supplied under or in relation offered or sold in the United States, without registration under
to the shares shall be deemed to constitute an offer of or an the U.S. Securities Act of 1933, as amended, or pursuant to an
invitation by or on behalf of AEL. exemption from registration therefrom.
AEL, as such, makes no representation or warranty, express This presentation is confidential and may not be copied or
or implied, as to, and does not accept any responsibility or disseminated, in whole or in part, and in any manner.
liability with respect to, the fairness, accuracy, completeness This presentation contains translations of certain Rupees
or correctness of any information or opinions contained amounts into U.S. dollar amounts at specified rates solely for
herein. The information contained in this presentation, unless the convenience of the reader.
otherwise specified is only current as of the date of this
presentation.
26