Вы находитесь на странице: 1из 20
OMAN POWER AND WATER PROCUREMENT CO. (SAC) S BARKA IWP (0-¢,0-ub) ool &dlilelytlglocll pl @® =f ——— Frm mmey é > eCNGie sTOCWS es PEPcoltlatatsls,asa Z)sue2z | Borka Desalination Company SAOC @egis @ mwu. PC CONTRACTOR SUB-CONTRACTORS) QUALITY PROCEDURE Surface Preparation & Painting Procedure Of Steel Structures BarKka IWP - = 2 ea Lose al S. Nevieg “TF 31/01/2017 | Firstissue MuthuKumar_ ‘Azarudeen Raw Date ‘Aim Of Revision Drawn Up By | Checked By | Approved By ALLRIGHTSRESERVEDFORALLCOUNTRIE: ‘DEGREWONT REFERENCE PROJECT NUNGER | ISSUER | SUBLEGT PROCESSN) TYPE NOW B-001032 PRF PE 000 SG 001 FR WoRKING STATUS This document is confidential and shall be used only for the purpose on the BARKA IWP Project BARKA IWP QUALITY PROCEDURE SURFACE PREPARATION & PAINTING. PROCEDURE OF STEEL STRUCTURES @)suez BARKA IWP B-001032-PRF-PE-000-SG-001 Rev.A | Working status FR Page 2/12 | Date: 31/01/2017 TABLE OF CONTENTS Chapter Description Page # 1 _| Purpose 03 2 _| scope 03 3 | Reference 03 4 _| Responsibilt 04 5__| Abbreviations 05 6 _| Definitions 05 7___| Identification of Applicable Painting System 05 8 _| Blasting & Spraying Equipment 05 9 _| Calibration of Testing Equipment’s 06 10 _ | Storage 06 11_| Health, safety & Environment 07 12 _| Climatic Condition 07 13 _| Surface Preparation — Prior to Blast Clean 07 14 Blast Cleaning 08 15 _| Mixing & Thinning 08 16 _| Painting 09 17 _| Drying & Curing 10 18 _| inspection & Testing 10 19 _| Repairs 2 20 | Quality Records & Inspection Reports 2 21 Attachment 2 ‘This document is confidential and shal be used only for the purpose on the BARKA IWP Project rm }2-PRF-PI )-s QUALITY PROCEDURE pe SEER re eee BARKAIWD | ree ceteris pat vol a PROCEDURE OF STEEL STRUCTURES FR W@)suee BARKA IWP Page 3/12 | Date: 31/01/2017 PURPOSE The Purpose of this procedure is to provide guidelines to concerned personnel regarding requirements for Surface Preparation, Painting and Inspection of Steel Structures carried out by PROFAB. SCOPE This procedure covers responsibilities, surface preparation, mixing, Painting application and inspection & Testing relating to painting of Steel Structures. > > vo vvyv vvvv REFERENCE 8001032-DGT-GE-000-SG-002 Rev A - SUEZ General Specification for Protection and Painting ISO 8501-1 ~ Preparation of steel substrates before application of paints and related products ~ Visual assessment of surface cleanliness ~- Part 1: Rust grades and preparation. grades of uncoated steel substrates and of steel substrates after overall removal of Previous coatings. ‘ASTM D-4417 ~ Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ISO 8502-06 ~ Preparation of steel substrates before application of paints and related products - Tests for the assessment of surface cleanliness - Extraction of Soluble Contaminants for analysis — The Bresle Method. ASTM-D4285~ Standard Test Method for Indic SSPC-SP-1 — Solvent Cleaning. NACE SPO188 ~ Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates. ISO 11126 Part 3 ~ Preparation of Steel Substrates before application of Paints & Related Products ~ Specifications for Non Metallic Blast Cleaning abrasives-Copper Refinery Slag. SSPC-SP10 — Near White Metal Blast Cleaning SSPC-PA2 ~ Measurement of Dry Coating Thickness with Magnetic Gauges. [ASTM 03359 - Standard Test Methods for measuring Adhesion by Tape Test ISO 12944 Corrosion Protection of Steel structures by protective Paint System. 1g Oil or Water in Compressed Ar. Drawn up by : MuthuKumar ‘Checked by : Md Azarudeen ‘Approved by : Md.AJaweed This document is confidential and shall be used only forthe purpose on the BARKA IWP Project

Вам также может понравиться