OMAN POWER AND WATER PROCUREMENT CO. (SAC) S
BARKA IWP
(0-¢,0-ub) ool &dlilelytlglocll pl @®
=f
——— Frm mmey
é > eCNGie sTOCWS
es
PEPcoltlatatsls,asa Z)sue2z |
Borka Desalination Company SAOC
@egis @ mwu.
PC CONTRACTOR
SUB-CONTRACTORS)
QUALITY PROCEDURE
Surface Preparation & Painting Procedure Of Steel Structures
BarKka IWP
- = 2
ea
Lose
al
S. Nevieg “TF
31/01/2017 | Firstissue MuthuKumar_ ‘Azarudeen Raw
Date ‘Aim Of Revision Drawn Up By | Checked By | Approved By
ALLRIGHTSRESERVEDFORALLCOUNTRIE:
‘DEGREWONT REFERENCE
PROJECT NUNGER | ISSUER | SUBLEGT PROCESSN) TYPE NOW
B-001032 PRF PE 000 SG 001 FR
WoRKING STATUS
This document is confidential and shall be used only for the purpose on the BARKA IWP ProjectBARKA IWP
QUALITY PROCEDURE
SURFACE PREPARATION & PAINTING.
PROCEDURE OF STEEL STRUCTURES
@)suez BARKA IWP
B-001032-PRF-PE-000-SG-001
Rev.A | Working status
FR
Page 2/12 | Date: 31/01/2017
TABLE OF CONTENTS
Chapter Description Page #
1 _| Purpose 03
2 _| scope 03
3 | Reference 03
4 _| Responsibilt 04
5__| Abbreviations 05
6 _| Definitions 05
7___| Identification of Applicable Painting System 05
8 _| Blasting & Spraying Equipment 05
9 _| Calibration of Testing Equipment’s 06
10 _ | Storage 06
11_| Health, safety & Environment 07
12 _| Climatic Condition 07
13 _| Surface Preparation — Prior to Blast Clean 07
14 Blast Cleaning 08
15 _| Mixing & Thinning 08
16 _| Painting 09
17 _| Drying & Curing 10
18 _| inspection & Testing 10
19 _| Repairs 2
20 | Quality Records & Inspection Reports 2
21 Attachment 2
‘This document is confidential and shal be used only for the purpose on the BARKA IWP Projectrm
}2-PRF-PI )-s
QUALITY PROCEDURE pe SEER re eee
BARKAIWD | ree ceteris pat vol a
PROCEDURE OF STEEL STRUCTURES FR
W@)suee BARKA IWP Page 3/12 | Date: 31/01/2017
PURPOSE
The Purpose of this procedure is to provide guidelines to concerned personnel regarding
requirements for Surface Preparation, Painting and Inspection of Steel Structures carried out
by
PROFAB.
SCOPE
This procedure covers responsibilities, surface preparation, mixing, Painting application and
inspection & Testing relating to painting of Steel Structures.
>
>
vo vvyv
vvvv
REFERENCE
8001032-DGT-GE-000-SG-002 Rev A - SUEZ General Specification for Protection and
Painting
ISO 8501-1 ~ Preparation of steel substrates before application of paints and related
products ~ Visual assessment of surface cleanliness ~- Part 1: Rust grades and preparation.
grades of uncoated steel substrates and of steel substrates after overall removal of
Previous coatings.
‘ASTM D-4417 ~ Standard Test Methods for Field Measurement of Surface Profile of Blast
Cleaned Steel
ISO 8502-06 ~ Preparation of steel substrates before application of paints and related
products - Tests for the assessment of surface cleanliness - Extraction of Soluble
Contaminants for analysis — The Bresle Method.
ASTM-D4285~ Standard Test Method for Indic
SSPC-SP-1 — Solvent Cleaning.
NACE SPO188 ~ Discontinuity (Holiday) Testing of New Protective Coatings on Conductive
Substrates.
ISO 11126 Part 3 ~ Preparation of Steel Substrates before application of Paints & Related
Products ~ Specifications for Non Metallic Blast Cleaning abrasives-Copper Refinery Slag.
SSPC-SP10 — Near White Metal Blast Cleaning
SSPC-PA2 ~ Measurement of Dry Coating Thickness with Magnetic Gauges.
[ASTM 03359 - Standard Test Methods for measuring Adhesion by Tape Test
ISO 12944 Corrosion Protection of Steel structures by protective Paint System.
1g Oil or Water in Compressed Ar.
Drawn up by : MuthuKumar ‘Checked by : Md Azarudeen ‘Approved by : Md.AJaweed