PROJECT
[OKIPL1] Document No. P-OkiPL1-100-01-FRM-XXX
Revision 00
CONTENTS
1. Purpose
2. Definitions
3. Procedure
1. Purpose
This procedure describes the protocol to use when tagging valves and signage within
SRCC Procedure and Permit to work Procedure.
The purpose of tagging valves with colored labels is to ensure correct valve line-up
prior to starting systems, plant or equipment. It is intended that this procedure will be
used in conjunction with and as an aid to the system operating instructions.
This procedure will not be used in place of the operating instructions.
2. Procedures
Brigging plant into SRCC Rule : TgBin-TOS/SO/QAM/RUL/0017
SRCC Documents Distribution : TgBin-TOS/SO/QAM/RUL/0018
PTW Procedure : TgBin-TOS/SO/QAM/RUL/0021
Control of Bonded Software :__ TgBin-TTB/B0/MS/75505
3. Definitions
Tag Type / Signage Tag Type / Signage Colour Description Usage
Malaysia)
NORMALLY OPEN SENTIASA TERBUKA RED A valve which is in the open Tagged on valves
in operation. purposes
NORMALLY CLOSED / SENTIASA TERTUTUP RED A valve which is in the closed Tagged on valves
operation. purposes
ISOLATION POINT BAHAGIAN PENGHADANG system or unit and vital for line with SRCC
OKI PULP & PAPER MILL Project No. P-OkiPL1
PROJECT
[OKIPL1] Document No. P-OkiPL1-100-01-FRM-XXX
Revision 00
DO NOT TOUCH / DO NOT DI-LARANG SENTUH / DI- operation and safety. Procedure and Permit
(PTW). To be chained
and lock.
NO ENTRY UNLESS DILARANG MASUK KECUAILI for authorized personnel to line with SRCC
To Work Procedure
(PTW). Barricaded
JUMPER LIFT TAG - YELLOW Temporary tag used to identify Jumper used to be
personnels in
accordance to Control
of Bonded Software
procedure
3. Procedure
Valve normally open or normally closed tags defined above are to be attached to
valves
In accordance with the following guidelines.
SELALU
TERBUKA
NORMALL
Y
OPEN
OKI PULP & PAPER MILL Project No. P-OkiPL1
PROJECT
[OKIPL1] Document No. P-OkiPL1-100-01-FRM-XXX
Revision 00
SELALU
TERTUTU
P
NORMALL
Y
CLOSED
OKI PULP & PAPER MILL Project No. P-OkiPL1
PROJECT
[OKIPL1] Document No. P-OkiPL1-100-01-FRM-XXX
Revision 00
Tanjung Bin
Power Plant
DANGER
DANGER
BAHAYA
OKI PULP & PAPER MILL Project No. P-OkiPL1
PROJECT
[OKIPL1] Document No. P-OkiPL1-100-01-FRM-XXX
Revision 00
Tanjung Bin
CAUTION
Power Plant
ONLY SPECIFIED PERSON TO OPERATE
OPERATOR:
_______________________________
______
SYSTEM:
_______________________________
______
OKI PULP AND PAPER Key No.:
FEEDER:
MILLS ______________
_______________________________
______ _____
PTW NO.:
_______________________________
______
DATE: ____________ TIME:
__________________
CAUTION
BERHATI-HATI
OKI PULP & PAPER MILL Project No. P-OkiPL1
PROJECT
[OKIPL1] Document No. P-OkiPL1-100-01-FRM-XXX
Revision 00
COMMISSIONING GROUP
OKI PULP AND PAPER
JUMPER LIFT
LOCATION
PANEL NO.
MILLS
DATE
FROM
SIGN
TO
S
Y
P
E
U
DT
E
M
:
R
IA
O
D
H
R
I
S
E
A
T
MD
N
TP
E
R
:O
C
K/
S
O
N
:
o
m
i
s
o
IP
U
L
P
An
i
g
N
D/
T
E
L
P
A
EN
O
:
R
M
IL
S
D
A
N
G
E
R
N
O
E
N
T
R
Y OKI PULP & PAPER MILL
PROJECT
[OKIPL1]
N
C
O
Ko
m
i
s
o
IP
U
L
P
A
N
Dn
i
g
P
AT
E
E
R
MLN
O
IL
S:
P-OkiPL1
P-OkiPL1-100-01-FRM-XXX
00
13 of 16
February 10, 2016
W
A
R
N
N
O
E
N
T
R
Y
U
A
U
H
O
S
Y
P
E
U
D
I
T
E
M
R
IA
O
D
H
R
I
S
E
A
T
M
G
N
L
E
S
IS
D
D
N
C
o
O
K/
m
i
s
o
IP
U
L
P
A
Nn
i
g
D
P
A/
T
E
L
E
R
MN
O
:
IL
S
OKI PULP & PAPER MILL
PROJECT
[OKIPL1]
S
Y
PT
E
M
Project No.
Document No.
Revision
Page
Issue Date
P-OkiPL1
P-OkiPL1-100-01-FRM-XXX
00
16 of 16
February 10, 2016