CONTRACTOR:
PROJECT:
RED LINE SOUTH UNDERGROUND
ARCHITECTURAL PROVISIONAL SUM WORKS
TITLE:
Q40 FENCING
M 0 0 3 Q G D A R C S P E 6 9 4 6 5 0.1
Project Code Organization Code Discipline Code Document Type Sequence No. Rev.
Q40 FENCING
RED LINE SOUTH UNDERGROUND
Q40 FENCING
RED LINE SOUTH UNDERGROUND
Table of Contents
Q40 FENCING
RED LINE SOUTH UNDERGROUND
Q40 FENCING
To be read with Preliminaries/ General conditions.
GENERAL NOTES
SECTION INCLUDES
Q40 FENCING
RED LINE SOUTH UNDERGROUND
SCOPE OF SECTION
This section deals with wood, metal, plastics and concrete fencing, railings and screens to control
access or provide visual or noise screening, with associated gates.
This section does not include:
- Hoardings and site fencing erected by the contractor these should not be specified. For special
requirements such as signing, corporate colours, vision panels, etc., see Preliminaries section
A36.
- Temporary protection to existing trees and vegetation erected by the contractor - see
Preliminaries section A36.
- Handrailings and balustrades - see section L30.
- Painting and clear finishing - see section M60.
- Barriers and guardrails, including sports ground barriers - see section Q41.
- Gates not part of a fence - see section Q50.
- Access control systems - see section W90 or Engineering services section W40.
Materials used in the project should originate from sources with a documented Environmental
Management System (EMS). The EMS should adhere to the principles covered in ISO 14001.
As per GSAS Railways Design Assessment Manual v2.1 requirements for the following criteria:
- M.1: to consider locally sourced/locally assembled materials
- M.2: BS8902:2009; ISO26000; ISO14001; ISO9001
- M.3: consider materials made with recycled content or % recycled content
- M.7: consider materials with Environmental Product Declaration Study (EPD)
- IE.9: consider low emitting materials with VOC those specified in the attached GSAS Material
Form
NOTE: Attached Sustainability/GSAS Material Assessment form to be completed for any material
provided by other proposed suppliers/manufacturers.
SPECIFIC REQUIREMENTS
The finishing materials shall comply with the following requirements, included in Volume 6 -
Employers Requirements - Design Specifications, unless otherwise herein specified.
Q40 FENCING
RED LINE SOUTH UNDERGROUND
000/TOL TOLERANCES
- Tolerances and dimensional accuracy of materials and elements shall comply to British Standard
BS ISO 1803:1997 "Building Construction, Tolerances". Only most restrictive tolerances will be
accepted.
- More restrictive values included herein (if any) shall prevail over the above mentioned British
Standard.
000/SPA SPARES
- At completion the sufficient quantities of items and accessories for spare and maintenance work
shall be supplied.
- Items and quantities to be proposed by the Sub-Contractor for RLS-JV approval.
Q40 FENCING
RED LINE SOUTH UNDERGROUND
Q40 FENCING
RED LINE SOUTH UNDERGROUND
FENCING SYSTEMS
Q40/126C OPEN MESH STEEL PANEL SECURITY FENCING - FUTURE DEVELOPMENT DESIGN/
ADVERTISEMENT FENCE
Q40/126D OPEN MESH STEEL PANEL SECURITY FENCING - STATION IDENTITY FENCE
- Fence system as per clause 126A.
- Other requirements:
- OPTION A: High Adhesive stickers on transparent support (e.g. polycarbonate panels) or
printed transparent textile with station identity images
- OPTION B: Printed transparent textile with station identity images
- OPTION C: 3D elements fixed on the fence (wooden board, sail, )
Q40 FENCING
RED LINE SOUTH UNDERGROUND
EXECUTION
Q40 FENCING
RED LINE SOUTH UNDERGROUND
- Filling: Position post/ strut and fill hole with concrete to not less than the specified depth, well
rammed as filling proceeds and consolidated.
- Backfilling of holes not completely filled with concrete: Excavated material, well rammed and
consolidated.
COMPLETION
Q40/910 CLEANING
- General: Leave the works in a clean, tidy condition.
- Surfaces: Clean immediately before handover.
Q40/920 FIXINGS
- All components: Tighten.
- Timing: Before handover.
Q40/930 GATES
- Hinges, latches and closers: Adjust to provide smooth operation. Lubricate where necessary.
- Timing: Before handover.
Q40 FENCING
RED LINE SOUTH UNDERGROUND
ABM
Material's Name: Supplier's Name:
Code
Contact Person:
E-Mail:
Telephone:
S.07 Heat Island Effect Answer Material Information Evidence
Solar Reflectance SR
YES Solar Heat Gain Coefficient
Is the material used on the building envelope, roof, or Value/Albedo factor Provide material data sheets
a.
landscape/hardscape areas? for evidence
NO
Certification:
I, ---------------------------------------, an authorized representative of------------------------------------------ hereby certify that the information contained herein is accurate to the best of my
knowledge.
SIGNATURE: ------------------------------------------------DATE:---------------------------------------- Company Stamp: