Demo Examples
TDV Ges.m.b.H
December 2000
RM2000 Contents
PC conc/insitu conrete composite bridge 2 stages - I
Contents
1 GENERAL ........................................................................................................................................ 1
5 CONSTRUCTION STAGES........................................................................................................... 3
6 LOADINGS ...................................................................................................................................... 3
7 RESULTS.......................................................................................................................................... 3
1 General
The of calculating a pre-stressed composite structure considering construction stages is
demonstrated in this example. The precast beams are installed first. The in-situ concrete
slab and the prestressing is added afterwards. The additional dead loads and traffic loads
will then be supported by the composite structure.
m m
m m
Fig. 2:Structural System for the first and second construction stage
3 Cross Sections
Fig. 3: Precast concrete beam and concrete slab local coordinate system and cable arrangement
5 Construction Stages
Construction stage 1: assembly of the two precast pre-tensioned single-span
beams
6 Loadings
Self weight:................................ 25kN/m
Permanent load: ......................... 1KN/m
Traffic laod: ............................... 15kN/m
Creep & Shrinkage: .................. according to model CEB-FIP 90
7 Results