RM2000

PC Conc/Insitu Conc Composite Bridge


2 Stages -

Demo Examples
TDV Ges.m.b.H

December 2000
RM2000 Contents
PC conc/insitu conrete composite bridge 2 stages - I

Contents

1 GENERAL ........................................................................................................................................ 1

2 THE STRUCTURAL MODELS..................................................................................................... 1

3 CROSS SECTIONS ......................................................................................................................... 2

4 GEOMETRY OF PRE-STRESSING CABLES ............................................................................ 3

5 CONSTRUCTION STAGES........................................................................................................... 3

6 LOADINGS ...................................................................................................................................... 3

7 RESULTS.......................................................................................................................................... 3

TDV Technische Datenverarbeitung GesmbH Heinz Pircher und Partner


RM2000 General
PC conc/insitu conrete composite bridge 2 stages - 1

1 General
The of calculating a pre-stressed composite structure considering construction stages is
demonstrated in this example. The precast beams are installed first. The in-situ concrete
slab and the prestressing is added afterwards. The additional dead loads and traffic loads
will then be supported by the composite structure.

Fig. 1: Composite structure in RM2000

2 The structural Models

m m

m m

Fig. 2:Structural System for the first and second construction stage

Elements 101 to 120:............ for the concrete girder


Elements 201 to 220:............ for the concrete slab
Elements 301 to 320:............ for the composite beam

TDV Technische Datenverarbeitung GesmbH Heinz Pircher und Partner


RM2000 Cross Sections
PC conc/insitu conrete composite bridge 2 stages - 2

Material information according to DIN


Concrete I-beam (precast-part) B 45
Concrete slab: B 35
Prestressing steel: 1570/1770

3 Cross Sections

Fig. 3: Precast concrete beam and concrete slab local coordinate system and cable arrangement

TDV Technische Datenverarbeitung GesmbH Heinz Pircher und Partner


RM2000 Geometry of the pre-stressing cables
PC conc/insitu conrete composite bridge 2 stages - 3

4 Geometry of the pre-stressing cables

Fig. 4: Cable geometry

5 Construction Stages
Construction stage 1: assembly of the two precast pre-tensioned single-span
beams

Construction stage 2: change of the structured system


- concreting of the topslab (cast in place)
- connecting the prefabricated beams by post-tensioning
- creating the composite beam

6 Loadings
Self weight:................................ 25kN/m
Permanent load: ......................... 1KN/m
Traffic laod: ............................... 15kN/m
Creep & Shrinkage: .................. according to model CEB-FIP 90

7 Results

Fig. 5: Bending moment Mz diagram for traffic loading case

TDV Technische Datenverarbeitung GesmbH Heinz Pircher und Partner