Вы находитесь на странице: 1из 5

CURRICULUM VITAE

Email : guna.dilip28@gmail.com
G.PRATHILEEPAN Mobile : +91-8870265459

CARRIER OBJECTIVE:
To achieve a good position with the best of my skills that would benefit the company as
well as me mutually.
EDUCATIONAL QUALIFICATION:

S.No. Course Institution Year of Passing

B.E(PRODUCTION JJ.COLLEGE OF
1 ENGINEERING)WITH FIRST ENGINEERING AND April 2009
CLASS TECHNOLOGY,TRICHY
TECHNICALQUALIFICATION:
ASNT Level II Course:

Radiography Testing
Ultrasonic Testing
Magnetic Particle Testing
Liquid penetrant Testing
Immersion Testing
Institute : BITS ASIA OF NDT, TRICHY
Year of Passing : AUG 2009

EQUIPMENT HANDLED

USD15, USM25, USM 35, MODSONIC


Ultrasonic Testing
DGS&TFT, GE (DMS-2).
Magnetic particle Testing Magna flux, AC, DC Yoke & Prod.
Liquid penetrant Testing Visible Solvent Removable Method
Radiography Testing Rolly I, Spec 2T, Tec hops.

WORKING EXPERIENCE: 7+ YEARS


COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :MAR2016-JUN2016
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :FEB2016 -MAR2016( SHUT DOWN-TRAIN-6,SRU-3&4)
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :NOV2015 -FEB2016
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :AUG2015 -OCT2015(SHUT DOWN-TRAIN-4,SRU-2)
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :JAN2015 -MAR2015
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :OCT2014 -DEC2014(SHUT DOWN-TRAIN-5,SRU-1,IR)
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
CLIENT :QATAR GAS,(QG-3&4)
DURATION :JUN2014-SEP2014
POSITION :NDT INSPECTOR
COMPANY NAME :EIL/DARWISH (DPIS)
PROJECT :QATAR GAS, (PMP-COMMISIONING)
DURATION : DEC-2013-MAR-2014
POSITION : NDT INSPECTOR
COMPANY NAME : EIL/DARWISH(DPIS)
PROJECT : QATAR GAS, QATAR (QG: 3&4-SRU-3, TRAIN-6)SHUT DOWN
DURATION : OCT-2013
POSITION : NDT INSPECTOR
COMPANY NAME : EIL/DARWISH(DPIS)
PROJECT : QATAR GAS, QATAR (QG: 1 -TRAIN-3 SHUT DOWN)
DURATION : 1MONTH (MAY13-JULY13)
POSITION : NDT INSPECTOR
COMPANY NAME : EIL/DARWISH(DPIS)
PROJECT : QATAR GAS, QATAR (HRSG) TRAIN 4&TRAIN5
DURATION : 1MONTH (APRIL13-MAY13) SHUT DOWN
POSITION : NDT INSPECTOR
COMPANY NAME : NDT CCS
PROJECT : AL RUWAIS , ABU DHABI.
DURATION : DEC (2011)-FEB (2012) Shut down.
POSITION : NDT Technician
EXPERIENCE IN INDIA
COMPANY NAME : SHANMUGA NDT SERVICES, MATHUR, TRICHY.
PROJECT : NORTH CHENNAI BOILER (2X600MW)(NON-NTPC)ENNORE.
DURATION : DEC (2010)-JAN (2011) Shut down (Unit-2).
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
DURATION : SEP 2009 -DEC2010
POSITION : NDT Technician.
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : HARIHUR POLYMER, KARNATAKA (ADHITYA BIRLA GROUP)
DURATION : NOV2009-DEC2009
POSITION : NDT Technician.
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : HARIHUR POLYMER, HARIHUR (ADHITYA BIRLA GROUP)
KARNATAKA
DURATION : FEB2010
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : TD POWER SYSTEM,DOBASPET,NELAMANGALA,
KARNATAKA
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : KIRLOSKAR ELECTRICAL COMPANY, BANGALORE,
KARNATAKA
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : BEML, BANGALORE,
KARNATAKA
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : HAL, BANGALORE,
KARNATAKA
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : CPRI, BANGALORE,
KARNATAKA
POSITION : NDT Technician
COMPANY NAME : Bangalore Inspection& Testing Agency, Bangalore, Karnataka [India].
PROJECT : JSW Steel Ltd Bellary, BANGALORE,
KARNATAKA
POSITION : NDT Technician

CLIENTS
QATAR GAS,RAS LAFFAN INDUSTRIAL CITY,QATAR
ADNOC,AL RUWAIS,ABU DHABI
JSW Steel Ltd Bellary, Karnataka.
HAL (Hindustan Aeronautics Limited, Bangalore.
CPRI, Bangalore.
TD Power Systems, Bangalore.
BEML, KGF Karnataka.
Kirlosker Electric Company, Bangalore.
HARIHUR POLYMERS,KARNATAKA
JOB AND RESPONSIBITIES:
TOTAL EXPERIENCE 7+YEARS
Having 7+ Years' experience in NDT Inspection of varies method Such as
UT,MT, PT & RT in the field of Refineries, Fertilizers Petrochemicals,
Corrosion Survey on Process Pipe lines, Tanks and Fabrication Yard CPCL
Shut down, Casting up grade &etc.
Capable of doing ultrasonic testing and evaluation all types defects of all butt
Plate, Pipes, Nozzle welds, castings, forgings & Plate lamination checking and
following clients procedures & Specifications.
Knows about Various Welding Process like SMAW, SAW & GTAW, etc. Familiar
with International Codes and Standards such as ASME Sec.V, ASME
SEC.VIII, Indian Standards & AWS D1.1
Ultrasonic Scanning of Structural butt welds, Earth moving equipments all pressure
Part butt welds, before & after Machining, Plate lamination, Pipe, Castings, forging &
etc.
Carried out magnetic particle inspection on butt weld. Fillet weld and inspection on
machined components, by using different method late a wet method. Dry method using
yoke & prod.
Carried out penetrant inspection on weld joints, butt weld, fillet weld equipments,
component etc, in different materials by using solvent removable
Carried out MPI/PT/UT thickness survey of Pressure Vessels/Pipe/Plates welds.
Carried out MT for Casting
Carried out UT Thickness& corrosion survey, MPI Inspection and Visual Inspection
of Structural welding During On-Shore Rig Erection.
Carry out Dye Penetrate Testing of Welds, Nozzles, Heat Exchanger tubes including
Ferrous & Non-Ferrous Metals Using Solvent removable & water washable Methods.
Lamination Checking Plates and Laminar tear UT Inspection at cutting pipe edges.
Hardness Testing of Welds (e.g., Parent Metal, HAZ & Weld Metal)
Immersion test also carried out on castings
Carried out UT Thickness &Corrosion on (HRSG)Heat Recovery Steam Generator
PT and UT Carried out on butt weld & branch weld of (HRSG)
UT (TML) carried out on pipe lines
Familiar in P & ID, isometrics
Working on downstream, upstream, slug catcher, H2S, offshore processing pipelines.
Inspect equipments during shutdown in columns, vessels heat exchangers, furnace, boilers,
reactors, coolers, ejectors,condensers,steams,evaporators,compressors,piping's etc.
SAFETY COURSES :
Basic Safety, Awareness courses,
H2S safety training,
Confined space entry, Hole Watcher Training,
PTW Training
PLANT AREA KNOWLEDGE:
UT carried out on level bridle in slug catcher(IR-UPSTREAM)
UT carried out on fingers(34"-pipe) in slug catcher
UT carried on ESDV Pit in slug catcher
UT carried out on waste water injection area all equipments and pipings.
UT carried out on metering skrit area
UT carried out on Inlet receiving area all equipments and pipings.
UT carried out on SRU area all equipments and pipings
1-AGE-SECTION
2-CLAUS SECTION(REACTOR,MAIN CUMBUSTION CHAMBER,
SULPHUR PIT)
3-TAIL GAS UNIT
UT carried out on utility area heat exchangers(boiler shut down-combustion chamber
tubes,mud drum,super heater&tubes, burner tip,
UT carried out on waste water tanks, cadridge filter,sulphur tanks,
UT carried out on live steam condenstate line(HT-400A)
UT carried out on (TRAINS-LNGs)all pipings & equipments.

PERSONAL DETAILS:
Father Name Mr.K.GUNA SEKARAN
Permanent address NO.04/890,PILLUKKARA STREET,THANJAVUR
Tamil Nadu, India - 613001
Date of Birth 28th OCTOBER 1987
Marital Status Single
Nationality Indian
Language Known English, Tamil, Hindi, Kannada
PASSPORT DETAILS:
Passport No : H7074541
Date of Issue : 09-12-2009
Date of Expiry : 08-12-2019
Place of issue : TRICHY
DECLARATION
I hereby declare that all the above mentioned details are true to the best of my knowledge.
Place: THANJAVUR
Date : PRATHILEEPAN.G

Вам также может понравиться