Proyecto Llurimagua (cobre / molibdeno)
6 Llurimagua Project (copper/molybdenum)
Proyecto Telimbela (cobre / molibdeno)
7 Telimbela Project (copper/molybdenum)
Proyecto El Torneado (cobre / molibdeno)
8 El Torneado Project (copper/molybdenum)

SALUDO
Proyecto Pacto (oro)
9 Pacto Project (gold)
Proyecto La Bonita (oro / cobre)
10 La Bonita Project (gold/copper)
Tola Norte (hierro / titnio)
Gerente General
11 Tola Norte (iron/titanium)
La Empresa Nacional Minera del Ecuador ENAMI EP forma parte de la poltica
Proyectos de depsitos primarios y secundarios para la gobernanza responsable y sostenible de nuestros recursos naturales,
12 Projects of primary and secondary deposits desde el ao 2010 ha iniciado la exploracin de varias concesiones en diferen-
tes metales, mediante el trabajo comprometido de nuestro personal y la
13 Cobre Copper
aceptacin de las distintas comunidades involucradas en cada uno de los
Planta de fundicin y refinacin de cobre proyectos, quienes nos han abierto las puertas de sus hogares y son testigos del
14
Smelting and refining copper plant beneficio que puede generar el crecimiento del sector minero ecuatoriano en
sus territorios.

WELCOME En el proceso de cambiar nuestra matriz productiva, hemos establecido cinco


ejes estratgicos como base del Plan de Negocios 2016, que sern los pilares
Chief Executive Officer CEO fundamentales para continuar con el desarrollo de la empresa, ya que permiti-
The National Mining Company of Ecuador ENAMI EP is part of the policy rn enfocar los recursos y esfuerzos institucionales para lograr altos ndices de
for responsible and sustainable governance of our natural resources. In eficiencia y alcanzar el objetivo de desarrollar proyectos mineros mediante
2010 exploration began in various concessions for different metals, inversin propia y asociada. Estos ejes estratgicos son:
through committed work by our personnel and the acceptance of the
different communities involved in each one of the projects, who have 1. Enfoque en el desarrollo de proyectos de cobre.
opened their doors and are witnesses to the benefits that can arise
from growth in the Ecuadorian mining sector in their communities.
2. Eficiencia Operacional de nuestros procesos y talento humano.
Within the process of changing our production matrix, we have
established five strategic focal points as the basis for our Business 3. Captacin de Inversiones nacionales o extranjeras explotando
Plan 2016, which will be fundamental pillars to move forward with las ventajas comparativas institucionales.
company development, as they will allow us to focus our institutional
resources and efforts on achieving high levels of efficiency while 4. Eficiencia Presupuestaria mediante control en el
meeting our goal of developing mining projects through our investment gasto y priorizacin de proyectos.
and that of affiliates. These strategic focal points are:
5. Desarrollo de proyectos en pequea escala que
1. Focus on the development of copper projects.
fortalezcan nuestra presencia comunitaria.
2. Operational Efficiency of our processes and human talent.
3. Reception of national or foreign investment, exploiting
the comparative institutional advantages. Estamos seguros que el Portafolio de Proyectos ENAMI EP 2016, ser interesan-
4. Budget efficiency by controlling expenses and prioritizing te para ustedes, sean inversionistas, exploradores, prestadores de servicios o
projects. desarrolladores de proyectos, ya que muestra a detalle la informacin relevante
5. Development of small-scale projects that strengthen our de los proyectos mineros y las concesiones que los integran, as como el marco
presence in the communities. de inversin y alianzas estratgicas que ofrecen importantes ventajas para el
inversionista a nivel nacional e internacional.
We are certain that the Project Portfolio ENAMI EP 2016 will be of great
interest to you, whether you are an investor, explorer, service provider El ao 2016 se presenta como una oportunidad para el sector minero, solo
or project developer, as it details information relative to mining projects quienes tengan la confianza y conocimiento para desarrollar nuevos proyectos
and the concessions that are part of them, as well as the investment en pases con potencial geolgico, infraestructura adecuada, estabilidad jurdica
framework and strategic alliances that offer important advantages to y socios estratgicos, podrn superar las barreras para la inversin y el precio
national and international investors. actual de los metales, por eso, la ENAMI EP es indudablemente la mejor opcin
In 2016 adequate infrastructure, legal stability and strategic partners- y estamos listos para demostrarlo.
hips are offered as an opportunity in the mining sector to those who
place their trust and knowledge of new project development in
countries with geological potential, thus overcoming barriers related to Stevie Gamboa Valladares
investments and the current price of metals. As such, ENAMI EP is GERENTE GENERAL
without a doubt the best option and we are ready to prove it. EMPRESA NACIONAL MINERA DEL ECUADOR ENAMI EP
Stevie Gamboa Valladares
GENERAL MANAGER
NATIONAL MINING COMPANY OF ECUADOR ENAMI EP
1
ECUADOR MINERO ECUADOR MINING

84 W 80 W 76 W 72 W
LA COLOSA Infierno
Chilli,

Cali
Piedra sentada,
Dolores,

2 N 2 N

Tola Norte
COLOMBIA
La Bonita

Llurimagua Distrito Imbaoeste


Cuellaje
Pacto Junn

Telimbela
Distrito Azuay - El Oro

El Torneado Chaucha
2 S Guayaquil Gaby - Papa Grande 2 S
Loma Larga
Tres Chorreras
El Mozo
Cangrejos
Provelo - Zaruma

Mirador Iquitos
Fruta del Norte

Distrito
Nambija

PER
6 S 6 S
MEGA DISTRITO
Chiclayo CAJAMARCA
Yanacocha
SIMBOLOGA Michiquillay

Proyectos ENAMI EP
Trujillo
Proyectos Privados DISTRITO
QUIRUVILCA
Mioceno Tardo a Medio
Chimbote
Cretcico Marino
Paleoceno - Eoceno
Cretcico Continental
10 S 10 S
Jursico
Jurasico
84 W 80 W 76 W 72 W

El Ecuador posee una ubicacin estratgica y clima privilegiado, lo cual Ecuador offers a strategic location and privileged climate, which favours the
favorece al desarrollo de las actividades econmicas en general, entre ellas development of economic activities, in general, which include mining.
la minera. As mismo presenta gran riqueza geolgica, encontrndose en su Likewise, it has expansive geological wealth, including mineral deposits that
territorio depsitos minerales que albergan econmicamente elementos tales house elements such as gold, silver, copper, molybdenum, iron and titanium.
como oro, plata, cobre, molibdeno, hierro y titanio, los mismos que estn These minerals are principally located in the provinces of Pichincha, Bolivar,
dispuestos principalmente en las provincias de Pichincha, Bolvar, Esmeraldas, Imbabura, Zamora Chinchipe, Napo and Sucumbios.
Esmeraldas, Imbabura, Zamora Chinchipe, Napo y Sucumbos.
Although it is known that Ecuador has high quality mineral deposits, it is no
Si bien se conoce que el Ecuador cuenta con depsitos minerales de gran less certain that only a minimal part of the territory has been explored
calidad, no es menos cierto que una mnima parte del territorio ha sido (approximately 8%), and thus it is calculated that the areas related to
explorado (alrededor del 8%), por lo que, se calcula que la dimensin de los mineral resources would be much greater than what data currently shows.
recursos minerales sera mayor a la de los datos que se conocen
actualmente. Worldwide reserves of copper are principally found in Chile, with 28%,
followed by Peru with 13% (Source: USGS 2012), which evidences the
Las reservas mundiales de cobre se encuentran principalmente en Chile con wealth of red metals that are found along the copper belt, which Ecuador is
el 28%, seguido por Per 13% (Fuente: USGS 2012), lo que denota la riqueza part of.
en el metal rojo que se encuentra a lo largo del cinturn cuprfero, del que
Ecuador forma parte.

2
ENTORNO LEGAL LEGAL ENVIRONMENT

El sector minero ecuatoriano se rige por varios cuerpos normativos, siendo concesionario debe aplicar por el inicio de la fase de explotacin de la
el de mayor importancia la Constitucin de la Repblica del Ecuador concesin. El concesionario a gran escala debe suscribir un contrato de
(2008), misma que para el efecto establece que:, los recursos explotacin minera, cuya negociacin empieza en la etapa de evaluacin
estratgicos como los recursos mineros son de propiedad del Estado y, en econmica.
este contexto el Estado puede excepcionalmente delegar la exploracin a
la empresa privada. La seguridad jurdica tambin se encuentra Vale mencionar que, los mineros artesanales, pequeos y medianos
reconocida en la Norma Suprema, como un derecho fundamental de pueden realizar actividades de exploracin y explotacin
nacionales y extranjeros. El concesionario minero tiene el derecho simultneamente.
exclusivo a explorar, explotar, procesar y vender los minerales de la
concesin. Los derechos mineros son susceptibles de cesin y transferencia, previa la
autorizacin de la Agencia de Regulacin y Control Minero, ARCOM.
La Norma que regula al sector minero es la Ley de Minera que data del 29
de enero de 2009, cuya reforma tuvo lugar el 16 de julio de 2013, El actual marco regulatorio ecuatoriano orienta a una gestin
conjuntamente con su respectivo Reglamento General del 16 de ambientalmente responsable para el desarrollo de los proyectos mineros,
noviembre de 2009 y su posterior reforma el 17 de noviembre de 2015. para lo cual se ha implementado una herramienta informtica denominada
Sistema nico de Informacin Ambiental (SUIA), con el propsito de
En trminos generales, existen cuatro categoras de minera en el Ecuador, mejorar los tiempos en la revisin y aprobacin de los estudios
establecidas por rangos de produccin: artesanal, pequea, mediana y ambientales por parte de la Autoridad Ambiental Nacional. Esta
gran escala. Las actividades mineras estn divididas en: exploracin herramienta on-line facilita un mecanismo de presentacin de informacin
inicial (4 aos), exploracin avanzada (4 aos) y evaluacin econmica del ambiental requerida para obtener la licencia ambiental, de manera previa
depsito (2 aos renovables por igual perodo). Durante la etapa final, el al desarrollo de las actividades mineras.

The Ecuadorian mining sector is governed by various standards, of which sion. Large-scale concessionaires must sign a mining exploitation
the most important is the Constitution of the Republic of Ecuador (2008), contract, which will begin negotiations during the economic evaluation
which to this effect sets forth that: ...strategic resources, such as mining phase.
resources, are the property of the State, and under this context, the State
can exceptionally delegate exploration to private initiatives. Legal stability It is worth mentioning that artisanal miners, as well as small- and
is also recognized in the Supreme Law, as a fundamental right of national medium-scale miners can carry out exploration and exploitation activities
and foreign parties. Mining concessionaires have the exclusive right to simultaneously.
explore, exploit, process and sell minerals arising from the concession.
Mining rights are susceptible to cession and transfer after receiving due
The Standard that governs the mining sector is the Mining Law, which authorization from the Mining Regulation and Control Agency, ARCOM.
dates back to January 29, 2009, amended on July 16, 2013, along with its
respective General Regulation, dated November 16, 2009 and its The current Ecuadorian regulatory framework is geared toward responsi-
subsequent amendment on November 17, 2015. ble environmental management for the development of mining projects,
for which an information tool has been implemented known as the Sole
In general terms, there are four categories of mining in Ecuador, establi- Environmental Information System (SUIA), with the aim of improving the
shed by production ranges: artisanal, small-, medium- and large-scale review and approval times of environmental studies by the National
mining. Mining activities are divided into phases: initial exploration (4 Environmental Authority. This online tool provides a mechanism for presen-
years), advanced exploration (4 years), and economic evaluation of the ting environmental information required to obtain the environmental
deposit (2 years, renewable for an equal term). During the final phase, the license, prior to carrying out mining activities.
concessionaire must apply to begin the exploitation phase of the conces-

3
CLIMA DE INVERSIN INVESTMENT CLIMATE

Ecuador es un pas democrtico, que goza de estabilidad


poltica, de manera que el actual Gobierno se encuentra
en su segundo perodo (desde el ao 2007), manteniendo
niveles de aceptacin positivos, as como su partido, que
actualmente posee una mayora en la Asamblea Nacional.

Es remarcable la inversin histrica que el Estado ha


realizado en los Sectores Estratgicos (Electricidad,
Recursos Naturales, Telecomunicaciones, Ecuador
Estratgico, Agua y Ambiente), monto que ascendi a una
inversin acumulada de USD $ 30.380 millones durante el
perodo 20072014, destacndose entre los sectores
estratgicos proyectos hidroelctricos, elicos y
termoelctricos, que proporcionarn energa limpia para
los nuevos negocios; de igual manera, se encuentran
proyectos de agua, que afianzan el recurso estratgico del
futuro.

Dentro del contexto macroeconmico, podemos decir que


el Ecuador tiene una carga moderada de impuestos
comparada con los pases de la regin, al igual que las
tasas de inters que son competitivas a las de los pases en pases como Chile; sin mencionar que la construccin continuar trabajando con las comunidades en pro
vecinos. Por otro lado, los costos de operacin para las de los proyectos hidroelctricos importantes, garantizan de obtener la licencia social, que viabilice el
empresas del sector minero ecuatoriano son bajas tarifas de electricidad a largo plazo. desarrollo minero.
relativamente bajos, lo cual tiene un impacto en la
rentabilidad de los mismos, pues posee beneficios como: Por otra parte, en el marco de la Gestin Social, la En palabras de Ron Hochstein, Director Ejecutivo de
bajas tarifas de energa; facilidades para el acceso al conflictividad podra determinar el nivel de inversiones a Lundin Gold: Ecuador tiene un increble potencial
agua; que se suman a interesantes leyes minerales; realizarse, puesto que se ha demostrado que dificulta el geolgico, quien debido a su experiencia,
depsitos ubicados a poca profundidad; la baja relacin inicio de actividades en las concesiones mineras o adicionalmente manifest que: se ha mejorado el
del descapote; la moderna infraestructura de las incrementa sus costos por las demoras que se pueden rgimen fiscal y regulatorio, la inversin en
carreteras; buena infraestructura de puertos y producir hasta que las comunidades den luz verde y infraestructura, la educacin, adems de que los
aeropuertos, costos competitivos en mano de obra; y, la apoyen los proyectos. En el caso de Ecuador, no se tiene ecuatorianos son muy diligentes, proactivos y
estabilidad monetaria, que afianzan la competitividad del niveles importantes de oposicin al sector, sobre todo en dedicados a su trabajo.
sector minero ecuatoriano en relacin con los costos de la virtud de que la minera en el pas an se encuentra en su
industria, frente a otros pases de la regin. fase inicial de desarrollo y por lo tanto, se ha generado
mucha expectativa en la poblacin, debido a que gran
Como ejemplo podramos traer a colacin, los costos de parte de sus actores se encuentran comprometidos a
electricidad, que representan un tercio de lo que se paga apoyar esta iniciativa del Gobierno. Siendo as, se

Ecuador is a democratic country with political stability, As an example we can mention the cost of electricity,
evidenced by the current government being in power for which is one third of the price paid in countries such as
its second term (ever since 2007), maintaining positive Chile. Similarly, the construction of important hydroelec-
levels of acceptance, in addition to having a party majority tric stations will guarantee low electric rates in the
in the National Assembly. long-term.

The historical investment that the State has made in On the other hand, within the Social Management
Strategic Sectors (Electricity, Natural Resources, Telecom- Framework, conflicts could determine the level of
munications, Strategic Ecuador, Water and Environmental) investments to be made, given the difficulty of starting
is remarkable. The amount totalled an accumulated activities in mining concessions or increases in costs due
investment of $30.38 billion during 20072014, highligh- to stoppages that could occur until communities give the
ted by projects in the strategic sectors that include green light to support the projects. In the case of Ecuador,
hydroelectric stations, wind farms and thermoelectric there are no elevated levels of opposition to the sector,
projects, providing clean energy for new businesses. especially with regards to mining being in the initial
Likewise, water projects have been performed that development phase, which in turn has resulted in great
strengthen this strategic resource for the future. expectations of the communities, as the majority of
stakeholders are committed to supporting this
Within the macroeconomics context, we can say that government initiative. As such, work will continue to be
Ecuador has a moderate tax burden with respect to other performed with communities in an attempt to receive the
countries of the region. Likewise, interest rates are similar social license, which makes mining development
to those of neighbouring countries. Additionally, possible.
operations costs of companies in the Ecuadorian mining
sector are relatively low, which has an impact on the In the words of Ron Hochstein, CEO of Lundin Gold:
profitability of the projects. There are several benefits Ecuador has incredible mining potential, who due to his
offered, including: low energy rates, facilities for vast experience, also stated that: the fiscal and
accessing water, in addition to interesting mineral grades, regulatory regime, investment in infrastructure and
deposits located at minimal depths, minimal clear-cutting education have improved, and Ecuadorians are very
required, modern highway infrastructure, good port and diligent, proactive and dedicated to their work.
airport infrastructure, competitive manual labour costs,
and monetary stability, which foster the competitiveness
of the Ecuadorian mining sector in relation to industry
costs of other countries throughout the region.

4
INCENTIVOS A LA INVERSIN INVESTMENT INCENTIVES

Durante los ltimos aos, el Ecuador ha implementado en la industria minera; depreciacin acelerada (5 a 10 Las actividades de exploracin y explotacin se
polticas pblicas e incentivos tributarios al sector minero, aos); y, la liberacin de impuestos a una gran cantidad de pueden realizar de forma simultnea, sin ajustarse al
disminuyendo significativamente la carga fiscal para las artculos que se requiere para la minera (maquinaria). rgimen de gran minera.
empresas mineras del pas y garantizando estabilidad
tributaria para los inversionistas de este sector. Vale mencionar que el 60% de las regalas de cada En relacin con la patente de conservacin para el
proyecto minero son reinvertidas en las comunidades de la rgimen de mediana minera se estableci una tarifa
En este sentido, y de conformidad con lo dispuesto en el zona de influencia de los proyectos, enfocndolas a la fija, que resulta evidentemente ms beneficiosa en
artculo 408 de la Constitucin de la Repblica del Ecuador, sostenibilidad econmica, a las microempresas y a comparacin con el rgimen de gran minera y
el Estado participar de los beneficios del aprovechamiento necesidades bsicas en general. facilita el rgimen impositivo de los concesionarios
de los recursos minerales, en un monto no inferior a los de mineros en Ecuador.
la empresa que los explota. Dichos beneficios son: Dichos incentivos se afianzaron con la aprobacin de la Ley
de Alianzas Pblico Privadas, el 18 de diciembre de 2015, lo Se fija tarifa cero para la Empresa Nacional Minera
Impuesto a la Renta (22%). cual posibilita la devolucin del impuesto al valor agregado del Ecuador ENAMI EP, por concepto de patentes de
Impuesto al Valor Agregado (12% a las adquisiciones) (IVA) a partir del primero de enero del 2018, lo que traer conservacin.
Regalas Mineras (5%-8%). consigo grandes beneficios a los exportadores mineros, como
Utilidades de los trabajadores (15%). la regularizacin de los mineros informales, transparentando No se requiere trmite alguno ante el Ministerio de
Impuesto a las ganancias extraordinarias (de ser el caso). de esta manera la informacin de la venta de minerales, ya Minera para calificarse como sujeto de derechos
Impuesto a la salida de divisas. que se reducir su contrabando, incrementando asi la Tasa mineros.
Interna de Retorno (TIR) de los proyectos. De igual manera, la
Adicionalmente, el rgimen de minera debe considerar el citada normativa viabiliza que los pequeos mineros tengan Se incluy el derecho a la transferencia para la
pago de patentes anuales de conservacin y el pago de socios o accionistas extranjeros en sus empresas. seguridad, mismo que beneficia a las entidades que
regalas. financian los proyectos mineros, lo cuales estn
Por otra parte, el 17 de noviembre de 2015 se expidi el dirigidos especialmente a las entidades financieras.
El Ecuador presenta una poltica de promocin para la Decreto Ejecutivo No. 823, que contiene las reformas del Quedan pendientes las directrices del Ministerio
atraccin de inversiones mineras, con miras a desarrollar Reglamento a la Ley de Minera, entre las cuales Sectorial para clarificar este asunto.
proyectos mineros a mediana y gran escala en un futuro precisamos las siguientes:
cercano. Para lo cual se otorga la posibilidad a los No se requiere aprobacin de una auditora por parte
inversionistas, de suscribir contratos de estabilidad Se abre la posibilidad para cualquier concesionario minero del Ministerio de Ambiente para pasar de la fase de
tributaria por 15 aos y reduccin de la tarifa de impuesto a de gran escala o pequea escala para cambiarse al exploracin inicial a avanzada.
la renta por reinversin de activos productivos, entre otros. rgimen de mediana minera, en virtud de consideraciones
tcnicas o por motivos de mercado. Al igual que un El clculo de las regalas debe estar basado en el
Los logros de mayor importancia implementados a partir concesionario de mediana minera puede cambiar su ingreso neto o el Net Smelted Return NSR, sin
del ao 2014 son: La estabilidad tributaria en relacin con rgimen a gran minera en cualquier momento. embargo, mientras en pequea y mediana minera
las modificaciones al impuesto a la renta y el IVA; el uso del los concesionarios pueden deducirse el precio de
valor actual neto (VAN) para el clculo del ajuste soberano; Si es que despus de ocho aos un concesionario minero fundicin, refinamiento y transporte, en gran minera
la estandarizacin de una frmula para el clculo del de gran escala no ha finalizado su programa de slo se pueden deducir estos dos ltimos.
impuesto a las ganancias extraordinarias, que se aplican exploracin inicial y avanzada, puede cambiar su rgimen
una vez que la empresa haya amortizado toda su inversin, a uno de mediana escala, lo que impacta directamente en
eliminando as la discrecionalidad; la exencin del los costos de las patentes de la concesin, en lugar de
impuesto a la salida de divisas (ISD) para bienes necesarios pasar directamente a la etapa de evaluacin econmica.

In recent years, Ecuador has implemented public policies and industry; accelerated depreciation (5 to 10 years); and, Exploration and exploitation activities can be
tax incentives for the mining sector, significantly reducing the exemption of taxes on a wide variety of items required for performed simultaneously, without adjusting the
tax burden for mining companies in the country and guarantee- mining (machinery). large-scale mining regime.
ing tax stability for investors in this sector.
It is worth mentioning that 60% of the royalties of each mining With regards to the conservation patent for the
In this sense, and in accordance with what is set forth in Article project are reinvested in the communities in the zone of medium-scale mining regime, a fixed rate was
408 of the Constitution of the Republic of Ecuador, the State will influence of the projects, focusing them on economic sustaina- established, which is evidently more beneficial than
receive profits stemming from the exploitation of mineral bility, small businesses and basic needs, in general. that of the large-scale mining regime, facilitating the
resources in an amount no less than what the company itself tax regime for mining concessionaires in Ecuador.
receives. Said benefits are: Said initiatives were strengthened by the approval of the
Public-Private Alliances Law, on December 18, 2015, which A rate of zero is established for the National Mining
Income Tax (22%). makes it possible to receive refunds on Value Added Tax - VAT Company of Ecuador ENAMI EP for the concept of
Value Added Tax (12% on acquisitions) (IVA in Spanish) as of January 1, 2018, which will result in great conservation patents.
Mining Royalties (5%-8%). benefits for mining exporters, such as the normalization of
Employee Profit Sharing (15%). informal miners, thus making the information related to mineral No process is required whatsoever with the Ministry
Windfall Earnings Tax (if applicable). sales transparent, as illegal mineral sales will reduce, of Mines to be deemed a subject of mining rights.
Outgoing Currency Remittance Tax. increasing the Internal Return Rate (IRR) of projects. Likewise,
the aforementioned standard makes it possible for small-scale The right of transfer was included as an assurance to
Additionally, the mining system must consider the payment of miners to have partners or foreign investors in their companies. benefit the entities that finance the mining projects,
annual conservation patents and royalty payments. which are especially geared toward financial entities.
On the other hand, on November 17, 2015 Executive Decree No. The guidelines of the Respective Ministry are
Ecuador presents a promotion policy for attracting mining 823 was issued, which contains reforms to the Regulation to pending to clarify this matter.
investments, geared toward developing medium- and the Mining Law, which we highlight the following:
large-scale mining projects in the near future. This includes No approval is required by the Ministry of the
granting investors the possibility of signing tax stability Opens the possibility for any large-scale or small-scale mining Environment from an auditing firm to change from
contracts for a period of 15 years and reducing the income tax concessionaire to change over to medium-scale mining, in the initial exploration phase to the advanced
rate for reinvestment of production assets, among others. virtue of technical considerations or market conditions. exploration phase.
Likewise, a medium-scale mining concessionaries can change
The most important achievements implemented as of 2014 are: over to large-scale mining at any time. The calculation of royalties must be based on net
tax stability with regards to modifications to income tax and VAT; earnings or the Net Smelter Return NSR; neverthe-
application of the net present value (NPV) for calculating If after eight years a large-scale mining concessionaire has less, small- and medium-scale mining concessionai-
sovereign adjustment; standardization of a formula for not finished its initial and advanced exploration program, it res may deduct the smelting, refining and transport
calculating windfall earnings tax, which is applied when the can change its regime to medium-scale mining, which prices, while large-scale concessionaires can only
company has amortized its entire investment, thereby directly impacts the concession patent costs, instead of deduct the latter two.
eliminating discretional nature; exemption of the outgoing directly moving on to the economic evaluation phase.
currency remittance tax (ISD) on goods required for the mining

5
PROYECTO / PROJECT
Cobre
Copper
Molibdeno
Molybdenum LLURIMAGUA
UBICACIN: LOCATION: MAPA GEOQUMICO DE GEOCHEMICAL MAP
Imbabura / Cotacachi Imbabura/Cotacachi ANOMALAS SUPERFICIALES OF SURFACE ANOMALIES

SUPERFICIE: SURFACE AREA:


4.829 ha 4,829 hectares

CLASIFICACIN DEL PROYECTO: PROJECT CLASSIFICATION:


Brownfield Brownfield

FASE PHASE:
Exploracin avanzada Advanced exploration

NIVEL DE INFORMACIN: LEVEL OF INFORMATION:


7 7

LICENCIA AMBIENTAL: ENVIRONMENTAL LICENSE:


Vigente In effect

MODALIDAD DE INVERSIN: INVESTMENT MODALITY:


Alianzas estratgicas Strategic Alliances
ENAMI EP-CODELCO ENAMI EP-CODELCO

ESTATUS SOCIAL DEL PROYECTO:


ESTADO DEL PROYECTO: PROJECT STATUS: En el proyecto minero Llurimagua la ENAMI EP ha promovido
2015 2015 un modelo de gestin dentro del rea de influencia, en el
Primera fase de perforacin Initial drilling phase (May-December mbito social, ambiental e institucional, fundamentado en
(mayo-diciembre 2015), con un 2015), with a total of 15,092 m. acuerdos con las instituciones del Estado ecuatoriano y las
total de 15.092 m distribuidos distributed throughout 12 drillholes. comunidades. El soporte interinstitucional ha sido
en 12 sondajes. importante para el desarrollo de la actividad minera, este se
2016 ha basado en procesos de informacin y comunicacin
2016 Second drilling phase that considers permanente sobre las fases mineras, la prctica y el manejo
Segunda fase de perforacin 10,000 meters. responsable del ambiente, se ha sustentado en la normativa
que pretende considerar minera y las acciones de aproximacin, negociacin y
10.000 metros. acuerdos para las actividades tcnicas operativas.

RECURSOS: RESOURCES:
Recurso Inferido de 318 MM TN. Inferred resource of 318 MM TN. SOCIAL STATUS OF THE PROJECT:
Ley del cobre: 0.7 %. Copper grade: 0.7 %.
At the Llurimagua mining project the ENAMI EP has
Ley del molibdeno: 0.016 %. Molybdenum grade: 0.016%.
promoted a management model within the area of influence,
in the social, environmental and institutional ambit, based on
........ ........ agreements with Ecuadorian State institutions and the
INFRAESTRUCTURA communities. The inter-institutional support has been
/ INFRASTRUCTURE ........ ........ important for performing mining activities. This has been
........ ........ based on permanent information and communications
processes regarding mining phases, practices and
........ ........ 4h responsible environmental management. Additionally, this is
founded on the mining standards and talks, negotiations and
Alto
desarrollo
Mediano
desarrollo
Bajo
desarrollo
........ ........ 4h agreements for technical-operational activities.
High Medium Low
development development development
........
6
PROYECTO / PROJECT
Cobre
Copper
Molibdeno
Molybdenum TELIMBELA
UBICACIN: LOCATION: MAPA GEOQUMICO DE GEOCHEMICAL MAP
Bolivar / Chimbo Bolivar/Chimbo ANOMALAS SUPERFICIALES OF SURFACE ANOMALIES

SUPERFICIE: SURFACE AREA:


4.033 ha 4,033 hectares

CLASIFICACIN DEL PROYECTO: PROJECT CLASSIFICATION:


Greenfield Greenfield

FASE: PHASE:
Exploracin avanzada Advanced exploration

NIVEL DE INFORMACIN: LEVEL OF INFORMATION:


7 7

LICENCIA AMBIENTAL: ENVIRONMENTAL LICENSE:


Vigente In effect

MODALIDAD DE INVERSIN: INVESTMENT MODALITY:


Alianzas estratgicas Strategic Alliances

ESTADO DEL PROYECTO: PROJECT STATUS:


2015 2015
Perforacin de 4.000 m sobre la anomala 4,000 m of drilling in the Ashcoaca anomaly.
de Ashcoaca. Varios tramos en el sondaje Various stretches of TEL-06 drillhole have 0.9%
TEL-06 de hasta 20 m con 0,9% Cu, Cu up to 20 m., various stretches with 1.1% Cu
varios tramos de 27 m con 1,1% Cu. ESTATUS SOCIAL DEL PROYECTO:
up to 27 m. En los proyectos mineros Torneado - Telimbela, la ENAMI
Anomala de suelos para cobre de 300 x EP ha promovido un modelo de gestin dentro del rea de
Copper soil anomalies measuring 300 x 300
300 metros en el sector de Telimbela
meters in the sector Telimbela Central, where an influencia, en el mbito social, ambiental e institucional,
Central. Donde se plantear realizar una
campaa de geofsica terrestre IP - Mag. IP - Mag ground geophysical campaign will be fundamentado en acuerdos con las instituciones del
proposed. Estado ecuatoriano y las comunidades. El soporte
2016 interinstitucional ha sido importante para el desarrollo de
Geofsica terrestre IP del rea Telimbela 2016
la actividad minera, este se ha basado en procesos de
Central. IP ground geophysics in the area of Telimbela
informacin y comunicacin permanente sobre las fases
Perforacin de 1.500 metros sobre el Central.
mineras, la prctica y el manejo responsable del
sector Telimbela Central. 1,500 meters of drilling in the sector of Telimbe- ambiente, se ha sustentado en la normativa minera y las
la Central. acciones de aproximacin, negociacin y acuerdos para
las actividades tcnicas operativas.
POTENCIAL: POTENTIAL:
Perforacin sobre la anomala de Drilling in the Ashcoaca anomaly; in the
Ashcoaca, en el sondaje TEL-06 existen TEL-06 drillhole there are stretches
tramos de hasta 20m con 0,9% Cu, with 0.9% Cu up to 20 m., in addition to
various stretches with 1.1% Cu up to SOCIAL STATUS OF THE PROJECT:
adems varios tramos de 27m con At the Torneado - Telimbela mining projects, ENAMI EP has
27 m.
1,1% Cu. promoted a management model within the area of
influence, in the social, environmental and institutional
........ ........ ambit, based on agreements with Ecuadorian State
institutions and the communities. The inter-institutional
INFRAESTRUCTURA
/ INFRASTRUCTURE ........ ........ support has been important for performing mining
activities. This has been based on permanent information
........ ........ and communications processes regarding mining phases,
practices and responsible environmental management.
........ ........ 3 h Additionally, this is founded on the mining standards and
talks, negotiations and agreements for
Alto
desarrollo
Mediano
desarrollo
Bajo
desarrollo
........ ........ 3 h technical-operational activities.
High Medium Low
development development development
........
7
PROYECTO / PROJECT
Cobre
Copper
Molibdeno
Molybdenum EL TORNEADO
UBICACIN: LOCATION: MAPA GEOQUMICO DE GEOCHEMICAL MAP
Bolivar / San Miguel Bolivar/San Miguel ANOMALAS SUPERFICIALES OF SURFACE ANOMALIES
SUPERFICIE: SURFACE AREA:
17.878 h 17,878 hectares

CLASIFICACIN DEL PROYECTO: PROJECT CLASSIFICATION:


Greenfield Greenfield
FASE: PHASE:
Exploracin avanzada Advanced exploration

NIVEL DE INFORMACIN: LEVEL OF INFORMATION:


7 7

LICENCIA AMBIENTAL: ENVIRONMENTAL LICENSE:


Vigente. In effect.

Se dispone de dos licencias Two environmental licenses have


ambientales para cinco concesiones been granted for five mining
mineras. concessions.

MODALIDAD DE INVERSIN: INVESTMENT MODALITY:


Alianzas estratgicas Strategic Alliances

ESTADO DEL PROYECTO: PROJECT STATUS:


2015
2015
Perforacin de tres sondajes (500m) en la Drilling of three drillholes (500m) in the El Cristal
concesin El Cristal. 8.5 m con una ley de 0,3% concession. 8.5 m. with a Cu grade of 0.3%; 4 m.
Cu; 4 m con una ley de 0,13 gr/ton Au en el with a gold grade of 0.13 gr/ton in the TOR 03
sondaje TOR 03. drillhole. ESTATUS SOCIAL DEL PROYECTO:
Anomala de suelos para cobre de 1.800 x 500 m Copper soil anomalies measuring 1,800 x 500 m. En los proyectos mineros Torneado - Telimbela, la
en el sector de Osohuayco. Donde se programa in the sector of Osohuayco, where an IP - Mag ENAMI EP ha promovido un modelo de gestin dentro del
realizar una campaa de geofsica terrestre IP -
Mag.
ground geophysical campaign is proposed. rea de influencia, en el mbito social, ambiental e
2016
institucional, fundamentado en acuerdos con las
2016
IP ground geophysics in the area known as
instituciones del Estado ecuatoriano y las comunidades.
Geofsica terrestre IP en el rea denominada El soporte interinstitucional ha sido importante para el
Osohuayco. Osohuayco.
1,500 meters of drilling in the sector of Osohuayco.
desarrollo de la actividad minera, este se ha basado en
Perforacin de 1.500 metros sobre el sector procesos de informacin y comunicacin permanente
Osohuayco.
sobre las fases mineras, la prctica y el manejo
POTENCIAL: POTENTIAL: responsable del ambiente, se ha sustentado en la
Concesin El Cristal , Chilcaloma, Gualazay y Cerro El Cristal, Chilcaloma, Gualazay and Cerro Grande normativa minera y las acciones de aproximacin,
Grande con 0,5% Cu y 0,69% Zn en alrededor de Concession with 0.5% Cu and 0.69% Zn in negociacin y acuerdos para las actividades tcnicas
2150 ha (JICA 1989-1991). Concesin San Antonio approximately 2,150 hectares (JICA 1989-1991). San operativas.
con 0,46% Cu en alrededor de 729 ha. (JICA 1991) Antonio Concession with 0.46% Cu in approximately
Concesin El Cristal, campaa de perforacin 729 hectares (JICA 1991). El Cristal Concession,
mostr tramos de 8.5 m con una ley de 0,3% Cu; 4 drilling campaign evidenced 8.5 m. stretches with a SOCIAL STATUS OF THE PROJECT:
copper grade of 0.3%; 4 m. with a gold grade of 0.13
At the Torneado - Telimbela mining projects, ENAMI EP
m con una ley de 0,13 gr/ton Au. en el sondaje TOR
has promoted a management model within the area of
03. gr/ton in the TOR 03 drill hole.
influence, in the social, environmental and institutional
ambit, based on agreements with Ecuadorian State
........ ........ institutions and the communities. The inter-institutional
support has been important for performing mining
........ ........ activities. This has been based on permanent
INFRAESTRUCTURA information and communications processes regarding
/ INFRASTRUCTURE ........ ........ mining phases, practices and responsible environmental
management. Additionally, this is founded on the mining
........ ........ 3 h standards and talks, negotiations and agreements for
technical-operational activities.
Alto
desarrollo
Mediano
desarrollo
Bajo
desarrollo
........ ........ 3 h
High Medium Low
development development development
........
8
Au PROYECTO / PROJECT
Oro
Gold PACTO
UBICACIN: LOCATION: MAPA GEOQUMICO DE GEOCHEMICAL MAP
Pichincha / Quito Pichincha/Quito
ANOMALAS SUPERFICIALES OF SURFACE ANOMALIES

SUPERFICIE: SURFACE AREA:


4.645 h 4,645 hectares

CLASIFICACIN DEL PROYECTO: PROJECT CLASSIFICATION:


Brownfield Brownfield

FASE: PHASE:
Exploracin avanzada Advanced exploration

NIVEL DE INFORMACIN: LEVEL OF INFORMATION:


7 7

LICENCIA AMBIENTAL: ENVIRONMENTAL LICENSE:


Vigente. In effect.

Se dispone de dos licencias Two environmental licenses have been


ambientales para dos concesiones granted for two mining concessions.
mineras.

MODALIDAD DE INVERSIN: INVESTMENT MODALITY:


Cesin y transferencia de Cession and transfer of mining rights.
derechos mineros.

ESTADO DEL PROYECTO: PROJECT STATUS:

2015 2015
Anomala de Cu-Mo en el sector de Cu-Mo anomaly in the sector of
Manchuri (1 km). Manchuri (1 km2).
Durante el 2015 se perforaron 1.674,30 m During 2015 1,674.30 m. were drilled of
de 1.800 m planificados, distribuidos en 6
the 1,800 m. planned, distributed
sondajes. ESTATUS SOCIAL DEL PROYECTO
throughout 6 drillholes.
Los resultados obtenidos de los sondajes Las acciones de responsabilidad social en el
The results obtained from the drillholes
ratifican la proyeccin de las vetas a proyecto minero Pacto, han permitido mantener un
ratify the projection of veins at depth.
profundidad. relacionamiento comunitario armonioso con la
poblacin; adems de posicionar la actividad
2016 2016 minera como una oportunidad productiva y de
Se consolidar la informacin con los The information will be consolidated with desarrollo para la zona, especialmente en las
resultados de laboratorio que se reciba. the lab results received. parroquias Pacto y Gualea, reas de influencia del
proyecto minero.
POTENCIAL: POTENTIAL:
347.000 onzas de oro en el sector El Viudo. 347,000 ounces of gold in the sector of
50.000 onzas de oro en el sector La Victoria. El Viudo. 50,000 ounces of gold in the SOCIAL STATUS OF THE PROJECT:
(ENAMI EP) sector of La Victoria. (ENAMI EP) The social responsibility actions in the Pacto
mining project have fostered a harmonious
relationship with the community, in addition to
positioning mining activities as an opportunity for
production and development in the zone, especially
........ ........ in the parishes of Pacto and Gualea, areas of
INFRAESTRUCTURA influence of the mining project.
/ INFRASTRUCTURE ........ ........
........ ........
........ ..... 2. 5 h
Alto
desarrollo
Mediano
desarrollo
Bajo
desarrollo
........ ..... 2. 5 h
High Medium Low
development development development
........
9
Au PROYECTO / PROJECT
Cobre
Copper
Oro
Gold LA BONITA
UBICACIN: LOCATION: MAPA GEOQUMICO DE GEOCHEMICAL MAP
Sucumbos / La Sofa, Rosa Florida Sucumbios/La Sofa, Rosa Florida ANOMALAS SUPERFICIALES OF SURFACE ANOMALIES
y La Bonita and La Bonita
SUPERFICIE: SURFACE AREA:
13.590 ha 13,590 hectares
CLASIFICACIN DEL PROYECTO: PROJECT CLASSIFICATION:
Greenfield Greenfield
FASE: PHASE:
Exploracin inicial Initial exploration
NIVEL DE INFORMACIN: LEVEL OF INFORMATION:
8 8
LICENCIA AMBIENTAL: ENVIRONMENTAL LICENSE:
Vigente. In effect. An environmental license has
Se dispone de una licencia ambiental been granted for the initial exploration
para la fase exploracin inicial en la phase of the La Chispa mining
concesion minera La Chispa. concession.
Otra licencia para exploracin avanzada Another license, for advanced
se encuentra en trmite. exploration, is being processed.

MODALIDAD DE INVERSIN: INVESTMENT MODALITY:


Alianzas estratgicas Strategic Alliances
ESTADO DEL PROYECTO:
2015 PROJECT STATUS:
Exploracin a detalle (1:10.000) en 4 reas especficas de la concesin 2015
Rosa Florida. Detailed exploration (1:10,000) in 4 specific areas of the Rosa Florida concession.
Muestreo de suelos por cumbres en la concesin Rosa Florida, 724 Soil sampling by layers in the Rosa Florida concession, 724 samples collected.
muestras recolectadas.
Aerial geophysical studies have been planned for the Rosa Florida concession
Se ha programado realizar estudios de geofsica aerotransportada sobre and part of La Bonita.
la concesin Rosa Florida y parte de La Bonita.
In the southeast sector of the Rosa Florida concession there is field evidence that
En el sector sureste de la concesin Rosa Florida, evidencias de campo
muestran mineralizaciones que merecen ser estudiadas a detalle. show mineralization that warrants detailed study.
2016
2016
Levantamiento Geolgico 1:10.000 en la concesin Rosa Florida. Geological Survey 1:10,000 in the Rosa Florida concession. Aerial geophysical
Geofsica area por mtodo magntico y electro magntico. study using magnetic and electromagnetic means.

POTENCIAL:
Campaas de geoqumicas de chips de rocas, sedimentos activos y suelos muestran valores anmalos en elementos de Cu, Au y Ag. Se han determinado
dos zonas potenciales hacia el oeste del proyecto con valores de hasta 1 g/ton. en Au. Hacia el oeste existen importantes zonas con valores anmalos en
Cu, hasta 1%, y Au 1.9 g/Ton, en rocas Cuarzo-Monzonitas. Adems de extensas zonas de alteracin cuarzo-sericita-pirita con intensidad moderada a fuerte.
POTENTIAL:
Geochemical campaigns of rock chips, active sediments and soils show anomalies of Cu, ESTATUS SOCIAL DEL PROYECTO
Au and Ag. Two potential zones have been identified to the west of the project with values Se han promovido procesos continuos de cooperacin
up to 1 g/ton of Au. To the west there are important zones with anomalies of Cu up to 1%, con la Autoridad Municipal del cantn La Bonita y las
and Au measuring 1.9 g/Ton, in Quartz-Monzonite rocks. Additionally, there are extensive comunidades del rea de influencia en aspectos
zones with moderate to strong quartz-sericite-pyrite alterations. ambientales, sociales y comunicacionales para el
desarrollo de las actividades mineras; adems de
........ ........ contribuir en el impulso de iniciativas locales que
permitan aportar con los proyectos productivos.
INFRAESTRUCTURA
/ INFRASTRUCTURE ........ ........
SOCIAL STATUS OF THE PROJECT:
........ ........ Continuous cooperation processes have been promoted
with the Municipal Authorities of the county of La Bonita
........ ..... 3 .5 h and the communities in the area of influence regarding
environmental, social and communications aspects for
Alto
desarrollo
Mediano
desarrollo
Bajo
desarrollo
........ ..... 6. 5h the development of mining activities; in addition to
contributing to the promotion of local initiatives that
High Medium Low
development development development
........ support productive projects.

10
Fe Ti PROYECTO / PROJECT
Hierro
Iron
Titnio
Titanium TOLA NORTE
UBICACIN: LOCATION: MAPA GEOQUMICO DE GEOCHEMICAL MAP
Esmeraldas / Eloy Alfaro Esmeraldas/Eloy Alfaro ANOMALAS SUPERFICIALES OF SURFACE ANOMALIES

SUPERFICIE: SURFACE AREA:


4.638 ha 4,638 hectares

CLASIFICACIN DEL PROYECTO: PROJECT CLASSIFICATION:


Greenfield Greenfield

FASE: PHASE:
Exploracin avanzada Advanced exploration

NIVEL DE INFORMACIN: LEVEL OF INFORMATION:


7 7

LICENCIA AMBIENTAL: ENVIRONMENTAL LICENSE:


Vigente In effect

MODALIDAD DE INVERSIN: INVESTMENT MODALITY:


Cesin y transferencia de Cession and transfer of
derechos mineros. mining rights.

ESTADO DEL PROYECTO: PROJECT STATUS:


2015 2015
En el 2015 se realiz la consultora interna- In 2015 a consultation process was
cional HATCH que caracteriz el depsito performed with the international consultancy
Tola Norte. ESTATUS SOCIAL DEL PROYECTO
agency HATCH, which characterized the Tola
Tomando los resultados geoqumicos de las En el proyecto Tola Norte se implement una estrategia
Norte deposit. Applying the geochemical de intervencin social en las reas de influencia, con
muestras producto de la primera campaa
results of the samples from the first drilling nfasis en las propiedades identificadas para la fase de
de perforacin (ao 2014) de 2.800 metros,
se categoriz y certifico recursos a nivel de campaign (2014), which totalled 2,800 perforacin. Esta estrategia ha permitido la obtencin
inferidos a travs de un QP. El recurso meters, the inferred resources were de permisos para las operaciones tcnicas, adems de
certificado fue de 1.035 MM TN, ley 5% Fe categorized and certified through a QP. impulsar sinergias operativas y entornos colaborativos
total. Certified resources totalled 1,035 MM TN, entre Empresa, Estado y comunidades conjuntamente
En agosto 2015 se inici la campaa de 5% Fe total grade. In August 2015 the con los Gobiernos locales de las parroquias Las Peas y
prospeccin en reas aledaas a la conce- La Tola, reas de influencia del proyecto minero.
prospecting campaign began in areas
sin minera, 87 pozos manuales (0,4 m-7 surrounding the mining concession, with 87
m).
holes dug by hand (0.4 m-7 m).
2016 2016
Publicacin del proyecto para venta. Publication of the project for sale.
SOCIAL STATUS OF THE PROJECT
The Tola Norte project implemented a social intervention
RECURSOS: RESOURCES: strategy in the areas of influence, placing emphasis on
Recurso inferido de 1.035 MM TN, ley 5 Inferred resource 1,035 MM TN, 5% Fe the properties identified for the drilling phase. This
% Fe total en 4.648 ha. total grade in 4,648 hectares. strategy has allowed for obtaining permits for technical
operations, in addition to fostering operational synergy
........ ........ and collaborative climates between the Company, State
and communities along with the local governments of
INFRAESTRUCTURA
/ INFRASTRUCTURE ........ ........ the parishes of Las Peas and La Tola, which are the
areas of influence of the mining project.
........ ........
........ ........ 5 h
Alto
desarrollo
Mediano
desarrollo
Bajo
desarrollo
........ ........ 1 h
High Medium Low
development development development
........
11
PROYECTOS DE DEPSITOS PRIMARIOS Y SECUNDARIOS
PROJECTS OF PRIMARY AND SECONDARY DEPOSITS
Inversin por cada nivel (GFIN-
ENAMI e Informe G5, pag52)
$ 3.632.000,00 (todos los proyectos) $ 6.368.000,00 (todos los proyectos) $ 8.070.000,00 (cada proyecto) $ 4.000.000,00 (cada proyecto) $ 8.800.000,00 (cada proyecto) $ 11.000.000,00 (cada proyecto)

NIVEL 8 NIVEL 7 NIVEL 6 NIVEL 5 NIVEL 4 NIVEL 3


EXPLORACIN INICIAL EXPLORACIN AVANZADA - ETAPA 1 EXPLORACIN AVANZADA - ETAPA 2 EXPLORACIN AVANZADA - ETAPA 3 EVALUACIN ECONMICA - ETAPA 1 EVALUACIN ECONMICA - ETAPA 2
Dene Dene
Dene estudio Dene estudio
Dene targets o sitios de inters Dene recursos inferidos recursos recursos
Prefactibilidad Factibilidad
indicados medidos
SENSORES ESTIMACIN
GEOQUMICA GEOFSICA GEOQUIMICA
REMOTOS DE RECURSOS

EVALUACIN ECONMICA PREMILINAR


EVALUACIN PRELIMINAR DE TARGETS
Puntaje 1 1 2 4 4 2.5 2.5 3 2 6 4 4 5 1 4 10 10 10 10 2.5 2.5 5 10 2.5 2.5 5 10

EVALUACIN ECONMICA DETALLE


Mapeo geolgico a detalle

Certicacin de Recursos

Certicacin de Recursos
DEPSITOS PRIMARIOS

Programa de perforacin

Programa de perforacin
Certicacin de Recurso
Perforacin exploratoria

Estudios Metalrgicos

Estudios Metalrgicos
EVALUACIN SEMIDETALLE

Estudios Geotcnicos

Estudios Geotcnicos
Imgenes Satelitales

Tcnica/econmica

Tcnica/econmica
Viabilidad Ambiental

Viabilidad Ambiental

Viabilidad Ambiental

Viabilidad Ambiental

Viabilidad Ambiental

Viabilidad Ambiental
Ingenieria de detalle
INICIO DE EXPLORACIN

Ingenieria de bsica

Estudi Econmico

Estudi Econmico
Geofsica Terrestre
Fotografas Areas

Viabilidad Tcnica

Viabilidad Tcnica

Viabilidad Tcnica

Viabilidad Tcnica
Cuanticacin de
Mapeo geolgico

Viabilidad Social

Viabilidad Social

Viabilidad Social

Viabilidad Social

Viabilidad Social

Viabilidad Social
EVAUACIN DETALLE
SECUNDARIOS

Geofsica Area

SUBTOTAL /20

SUBTOTAL /20

SUBTOTAL /20

SUBTOTAL /20

SUBTOTAL /20

SUBTOTAL /20
ACTIVIDADES

en malla - inll

en malla - inll
DEPSITOS

Sedimentos

Sedimentos
semidetalle

especco
Viabilidad

Viabilidad
Recursos

General
Suelos

Suelos

detalle
detalle
Rocas

Rocas

piloto

Piloto
X Llurimagua 1 1 0 0 0 0 0 3 5 SI SI SI 0 0 0 5 1 4 10 7 0 7 2 0 2
X Telimbela 1 1 2 4 4 0 0 3 15 SI SI SI 1 2 2 2 0 0 7 0
X El Torneado 1 1 2 4 4 0 0 3 15 SI SI SI 1 2 2 2 0 0 7 0
X Pacto 1 1 0 4 4 0 0 3 13 SI SI SI 1 1 2 2 0 0 6 0
X La Bonita 1 0 2 2 1 0 0 1 7 SI 0 0 0 0 0 0 0 0
X Tola Norte 1 1 10 0 0 2 14 SI SI SI 0 0 5 1 4 10 NO SI SI
EXPLORACIN INICIAL EXPLORACIN AVANZADA EVALUACIN ECONMICA

NIVEL 2 NIVEL 1 - Estudio de


Hito de decisin clave factibilidad PUNTO DE
OPERACIN - ETAPA 1 OPERACIN - ETAPA 2 Tasa de gasto
DECISIN

GASTOS A ESCALA LOGARITMICA


Construccin
Produccin
Planta Estudio de
Iniciacin de la

TOTAL/160
prefactibilidad
ALTO RIESGO produccin minera

Puntaje 5 5 10 20 Seleccin
Seleccin de la zona
EVALUACIN ECONMICA DETALLE
12

Regional

%
DEPSITOS PRIMARIOS

DISMINUCIN
Insfraestructura Mina

Viabilidad Ambiental

Viabilidad Ambiental
Construccin Planta

DEL RIESGO
Tcnica/ecnmica

Tcnica/ecnmica
Viabilidad Social

Viabilidad Social
SECUNDARIOS

SUBTOTAL /20

SUBTOTAL /20
ACTIVIDADES
DEPSITOS

Produccin
Viabilidad

Viabilidad
Accesos

PRODUCCIN

Planificacin Planificacin Exploracin de Objetivo de Perforacin Perforacin Desarrollo de Retirada del


conceptual detallada reconocimiento la evaluacin de exploracin de evaluacin la mina Minera servicio y
rehabilitacin
Pozo de
Teledeteccin, Geoqumica de Estudios piloto

ACTIVIDAD
Revisin de Revisin de geoqumica suelos, mapeo metalrgicos Ensayos y produccin,
literatura literatura regional, de geofsica, estudios disminucin
visita de campo geofsica area levantamiento metalrgicos o la eliminacin
de residuos
X Llurimagua 24 15.0%
X Telimbela 22 13.8%
X El Torneado 22 13.8%
X Pacto 19 11.9%
X La Bonita 7 4.4% 24 15.0%
X Tola Norte 24 15.0%
OPERACIN
22 13.8%
33 13.8%
19 11.9%
Los sistemas de clasificacin de la de ENAMI EP sern vistos por profesionales o y aprobados para la actividad en cuestin.
TOLA NORTE 24 15.0%
informacin agrupan los contenidos en individuos cuyo idioma en comn es la La estandarizacin de los niveles de la
niveles perfectamente definidos y clasificacin y conceptos que se maneja informacin preparada en el presente 7 4.4%
diferenciados uno de otros acorde a la sobre los proyectos de exploracin minera a informe, detallar los diferentes procesos y
puntuacin por cada nivel y clasificacin del nivel internacional, es as que fue importante consideraciones que ubicaron y clasificaron
o los proyectos dentro del negocio de la realizar una estandarizacin de la los proyectos acorde al nivel de la when the user is going to carry out a search language is the classification and concepts majority of opportunities they are explicit,
industria de exploracin de minerales. Son clasificacin por niveles de informacin en informacin existente y desarrollada para or enquiry of the degree to which a certain used for mining exploration projects on an and are important to comply with to obtain
tiles cuando el usuario va a realizar una los proyectos de ENAMI EP. El trmino de cada uno. project in the portfolio of ENAMI EP has been international level. As such, it was important the expected results, approved for the activity
bsqueda o consulta del grado de desarrollo estandarizacin tiene como connotacin developed, with regards to the level of to standardize the classification by levels of in question. The standardization of the levels
de un determinado proyecto en el portafolio principal la idea de seguir el proceso information that has been generated for the information in ENAMI EP projects. The of information prepared herein will detail the
de la ENAMI EP en cuanto al nivel de standard a travs del cual se tiene que actuar project. primary connotation of standardization is to different processes and considerations that
informacin que se haya generado sobre el o proceder. Al mismo tiempo, esta idea The information classification system groups follow a standard process that it is required ranked and classified the projects according
mismo. supone la de cumplir con reglas que, si bien the contents in clearly defined levels in which For this classification, a standard was used to act or proceed through. At the same time, to the level of existing information developed
en ciertos casos pueden estar implcitas, en each item is differentiated from others that is applied by the mining industry this assumes that all rules will be complied for each one.
Para la presente clasificacin se ha llevado la mayora de las oportunidades son reglas according to the score of each level and worldwide, as ENAMI EP projects will be seen with, which, although in certain
un estndar aplicado en la industria minera a explcitas y de importante cumplimiento a fin classification of the project(s) within the by professionals or individuals whose shared circumstances these may be implicit, in the
nivel internacional, puesto que los proyectos de que se obtengan los resultados esperados mineral exploration industry. This is useful
COBRE COPPER
La decisin de la Empresa Nacional Minera del Ecuador
ENAMI EP, de especializarse en cobre corresponde al
cambio de la matriz productiva que contempla el Proyecto
de Refinera y Fundicin de cobre y adems atiende a
varios factores que se enfrentan las grandes empresas de
talla mundial tales como:

Disminucin de leyes en las minas de cobre, debido al


envejecimiento de las grandes concesiones actuales,
frente a la inexistencia de proyectos cuprferos en
construccin.

Progresivo aumento de cobre refinado a nivel mundial.

Aumento de costos laboral anual.

Costo del agua, que en pases como Chile requiere el


uso intensivo de energa elctrica contemplada en el
proceso de desalinizacin de agua de mar.
Como se ha manifestado, en esta breve introduccin El cobre es un metal sumamente verstil, tiene
Costo de energa vs. la intensidad de uso (kWh/tmf) Ecuador ha adoptado medidas para propiciar que las gran importancia por su valor reciclable, as
requeridos para la industria minera en muchas ocasiones condiciones de pas sean atractivas a los inversionistas, tambin es el metal con mayor capacidad de
con dependencia de fuentes importadas. considerando los bajos costos de produccin frente a reutilizacin en el mundo, ya que dicha capacidad
otros pases. Es por eso que siendo la minera una es prcticamente infinita.
Disminucin de la productividad en la relacin toneladas industria de largo plazo, es oportuno pensar en invertir
de cobre/trabajador vs. el estancamiento de la produccin en la especializacin cuprfera, considerando que las Por sus atributos de durabilidad, conductividad
de cobre en los ltimos aos. condiciones de mercado en la etapa de produccin del elctrica y trmica, propiedades bactericidas,
metal rojo pueden ser un puntal para la economa resistencia a la corrosin, fcil aleacin con otros
ecuatoriana. metales y alta maleabilidad, tiene diversos usos y es
utilizado en varias industrias. Vale la pena recalcar
DISMINUCIN DE LEYES / FALLING MINERAL GRADES Por otro lado, vale la pena recalcar las que los nuevos usos del cobre siguen explorndose.
bondades del cobre, entre las que se pueden
mencionar que representa un metal De acuerdo a la informacin de Wood Mackenzie
semi-precioso, no ferroso, utilizado desde 2014, los usos finales del cobre son
pocas ancestrales; la humanidad lo conoce principalmente: construccin, productos del
este metal aproximadamente desde hace consumidor 29%, cableado elctrico 19%,
10.000 aos, actualmente constituye un transporte 12% y maquinaria industrial 10%,
componente importante de la vida moderna siendo China el mayor consumidor de cobre del
que tiene cientos de aplicaciones en reas mundo con aproximadamente el 44% de la
como: electricidad, electrnica, plomera, demanda total.
transporte, construccin, arquitectura y
productos para la salud (autosanitizantes La Empresa Nacional Minera del Ecuador ha
para uso en hospitales). A nivel mundial se considerado un acierto apostar en la inversin del
utilizan alrededor de 26 millones de metal rojo en el mediano y largo plazo, debido a su
Fuente: CRU Strategies / Source: CRU Strategies
toneladas de cobre al ao. gran demanda mundial.

The decision of the National Mining Company of Ecuador In accordance with the aforementioned, in recent times Due to the fact that it is highly durable, a good
ENAMI EP to specialize in copper corresponds to the Ecuador has adopted measures to offer attractive conductor of electricity and heat, antibacterial,
change in the production matrix, which includes the conditions to investors, considering the low cost of resistant to corrosion, easily mixed with other
Copper Refining and Smelting Project, and also involves production in comparison to other countries. It is for this metals and highly malleable, it has multiple uses in
several factors that large companies face on an reason that as the mining industry is long-term, it is a variety of industries. Because of these
international level, such as: appropriate to consider investing in copper specialization, characteristics, experts are continually researching
considering that copper production market conditions new uses for copper.
Lower mineral grades in copper mines due to the aging could become critical to the Ecuadorian economy.
of main concessions, along with the lack of copper Pursuant to the information provided in 2014 by
projects being built. On the other hand, it is worthwhile to emphasize the Wood Mackenzie, the final uses of copper are
benefits of copper, including the fact that it is a primarily: construction, consumer products (29%),
Progressive increase of refined copper worldwide. semi-precious, non-ferrous metal that has been used electrical cabling (19%), transportation (12%) and
since ancestral times; humanity has worked with copper industrial machinery (10%), with China being the
Annual increase in the cost of labour. for 10,000 years, and it is currently a very important worlds largest copper consumer, using about 44%
component of modern-day life, with hundreds of of total worldwide production.
Cost of water, which in countries such as Chile requires applications, including areas such as: electricity,
the intensive use of electric energy to remove salt from electronics, plumbing, transport, construction, architecture The National Mining Company of Ecuador has
the seawater used. and health products (sanitizers for hospital use). considered it wise to position itself for medium-
Approximately 26 million tonnes of copper are used every and long-term copper investment due to its high
Cost of energy vs. intensity of use (kWh/tmf) required for year on a worldwide level. demand worldwide.
the mining industry, which, in many occasions, is
dependent on imported energy sources. Copper is a highly versatile metal that is extremely
important due to its recyclable properties. Of all metals, it
Decrease in productivity in the tonnes of copper/worker has the greatest potential to be reused, as its capacity is
ratio vs. copper production standstill over recent years. essentially infinite.

13
PLANTA DE FUNDICIN Y REFINACIN DE COBRE
SMELTING AND REFINING COPPER PLANT
El Gobierno Nacional promueve un plan integral para el Dentro del Portafolio de Proyectos 2016, la ENAMI EP ESTADO DEL PROYECTO:
desarrollo de industrias estratgicas en el pas, las cuales presenta varias concesiones para minera a gran escala, Estudio de pre-factibilidad realizado por
parten del aprovechamiento responsable de los recursos tales como Telimbela y El Torneado (Bolvar) y Nanguipa Snc-Lavalin, finalizado en diciembre de 2014.
naturales (materia prima) y se transforman en productos (Zamora Chinchipe), los cuales han sido impulsados por el Estudio de factibilidad inici en abril de 2015.
intermedios que luego son requeridos por otras industrias Gobierno Nacional y podran resultar favorables luego de
para la elaboracin de productos finales. efectuarse los estudios correspondientes, formando as COMPETITIVIDAD:
parte de la produccin tendiente a abastecer la Planta de Ubicacin privilegiada para exportar cobre
En el Ecuador, el objetivo es impulsar la industria minera y Cobre. refinado a China e importar concentrado
la metalrgica (refinera de cobre y aluminio), de manera desde Chile y/o Per.
que se generen varias actividades tendientes a dinamizar el Estos Proyectos (en busca de socios estratgicos), ofrecen Integracin futura con concentrado de
progreso en el pas, como una palanca productiva, social y la posibilidad de integracin UP y MIDSTREAM para el cobre producido localmente.
econmica con valor agregado. inversor. Potencial para aumentar ingresos a travs de
exportacin de subproducto, cido sulfrico hasta
Los principales retos socio-econmicos del Gobierno "El impacto social y ambiental se controlar con un margen Chile a precios competitivos.
Nacional son: reducir la pobreza y mejorar la calidad de vida de accin considerando regulaciones actuales y futuras" Factores de competitividad en escala regional y
a travs del fomento a la inversin, aumento y distribucin global (costos de electricidad y mano
de la renta, creacin de puestos de trabajo, mejoramiento MERCADOS OBJETIVOS: de obra competitivos).
de la calificacin y calidad del mercado laboral, crecimiento Exportacin de ctodos al Asia (China) Impacto social y ambiental controlado y de poca
directo de la industria minera, sustitucin de importaciones, Exportacin de sub-productos escala: bajo riesgo en la ejecucin del proyecto.
fomento de exportaciones con nuevos productos y (cido sulfrico a Chile, recuperacin de
mercados, desagregacin y transferencia tecnolgica y metales de barros andicos: mercado global)
desarrollo de nuevas tecnologas.
MATERIA PRIMA:
Este plan constituye uno de los pilares fundamentales Concentrado de cobre
dentro de la estrategia para el cambio de la matriz (importado o producido localmente)
productiva, debido a que su ejecucin determinar la
aceleracin en el crecimiento econmico y coadyuvar en
pos de superar los principales desafos sociales.
C O L O M B I A

En este sentido, se ha previsto construir una Planta de 0 50 100 km

Fundicin y Refinacin de cobre en la provincia de Guayas,


con capacidad de produccin de 280 kilotoneladas/ao de
0
Quito

ctodos de cobre, utilizando 1.000 kton de concentrado


importado y/o local. PLANTA DE FUNDICIN / SMELTER

As mismo, se han agilizado los esfuerzos en el marco de la


P A C F I C O

bsqueda de inversionistas, a travs de alianzas


estratgicas pblico privadas y/o inversin directa, GUAYAS
O C A N O

puesto que dicha obra requiere una inversin aproximada


de 2.000 millones de dlares.
REFINACIN / REFINEMENT
La Empresa Nacional Minera del Ecuador (ENAMI EP)
resolvi enfocar sus esfuerzos en proyectos cuprferos,
considerando el ambiente geolgico favorable que sugiere P E R

un gran potencial en varias reas que conforman su


Portafolio, adems de que el cobre es un metal que
representa demanda mundial y de esta forma, el pas se
convertira en proveedor primario para esa cadena
CTODOS DE COBRE / COPPER CATHODES
productiva.

The National Government is promoting a comprehensive plan to Likewise, efforts to seek investors have been accelerated through Export of cathodes to Asia (China)
develop strategic industries in the country, which involve the strategic public-private alliances and/or direct investment, as this Export derivatives (sulphuric acid to Chile,
responsible exploitation of natural resources (raw material) to project requires an investment of approximately 2 billion dollars. recovery of metals from anode slimes: global market)
transform them into intermediary products, which are then
required by other industries to manufacture final products. The National Mining Company of Ecuador (ENAMI EP) has resolved RAW MATERIAL:
to focus its efforts on copper projects, considering the favorable Copper concentrate
In Ecuador, the objective is to promote the mining and metallurgic geological environment that suggest an enormous potential it (imported or locally produced)
industry (copper and aluminum refining) to promote various holds for various areas included in its Portfolio. Additionally, there
activities that will stimulate progress within the country, like a is a global demand for copper and based on its plan, Ecuador PROJECT STATUS:
productive, social and economic lever with added value. would become a primary supplier for this productive chain. Pre-feasibility study carried out by
SNC-Lavalin, completed December 2014.
The main socio-economic challenges that the National The 2016 Project Portfolio of ENAMI EP includes several Feasibility study began April 2015.
Government faces are: to reduce poverty and improve quality of large-scale mining concessions such as Telimbela, El Torneado
life by promoting investment, increasing and distributing income, (Bolvar) and Nanguipa (Zamora Chinchipe), that the Government COMPETITIVENESS:
generating employment, improving the qualifications in, and has promoted and could prove favorable after carried out the Privileged location for exporting refined copper to China
quality of, the labour market, and through the direct growth of the relevant studies for forming part of the production tending to and importing concentrate from Chile and/or Peru.
mining industry, import substitution, export promotion with new supply the copper plant. Future integration with locally produced copper
products and markets, technological disaggregation and transfer, concentrate.
and developing new technology. These Projects (looking for strategic partners) offer investors the Potential to increase profit by exporting derivatives,
possibility of integrating UP and MIDSTREAM. sulphuric acid to Chile at competitive prices.
This plan represents one of the fundamental pillars of the strategy Competition factors on a regional and global scale
to change the production matrix, as the execution of this plan will (competitive electricity and labour prices).
determine the speed of economic growth and contribute to "Social and environmental impacts will be controlled with a Controlled and low-scale social and environmental
overcoming the critical social challenges faced by the country. margin of action that considers current and future regulations. impact: low risk project execution.
To this effect, it has been determined that a Copper Smelting and
Refining Plant will be built in the province of Guayas with the
capability of producing 280 kilotons/year of copper cathodes using
1,000 ktons of imported and/or local concentrate. TARGET MARKETS:

14
Noticias NEWS

El ministro Javier Crdova U. impuls las negociaciones con la firma canadiense


Javier Crdova, Stevie Gamboa, Gonzalo Pizarro (Codelco) y Aurora Williams (Min. Chile) Jorge Glas E. presidi el evento estatal con 22 empresas privadas Minister Javier Cordova U. promoted negotiations with the Canadian firm
Javier Cordova, Stevie Gamboa, Gonzalo Pizarro (Codelco) and Aurora Williams (Min. Chile) Jorge Glas E. presided over the state event attended by 22 private companies Lundin Gold aporta al desarrollo minero a gran escala
El 14 de enero pasado se firm en Quito, con la empresa canadiense
Ecuador y Chile asociados para desarrollar Proyecto Llurimagua Empresas pblicas en pacto estratgico Lundin Gold, el Acuerdo de las condiciones financieras para
El pasado lunes 7 de diciembre de 2015, en asociacin estratgica con industria nacional privada desarrollar el Proyecto Fruta del Norte, uno de los aurferos ms
entre Ecuador y Chile, se firm en la ciudad de Quito , el convenio Un paso ms en el compromiso del Gobierno por priorizar la industria grandes del pas.
binacional Trminos de Acuerdo de Accionistas para desarrollar el ecuatoriana. El mircoles 3 de febrero de 2016, 22 empresas privadas El documento fue suscrito por el Ministro de Minera, Javier Crdova
proyecto minero Llurimagua, entre la Empresa Nacional Minera del nacionales firmaron el convenio Marco de Cooperacin con Empresas Unda, en representacin del Estado ecuatoriano y Lukas Lundin,
Ecuador (ENAMI EP) y Codelco de Chile, con el fin de desplegar el Pblicas de los Sectores Estratgicos, entre estas la Empresa Nacional Presidente Ejecutivo de la empresa canadiense que explotar dicho
proceso minero, que actualmente comprende la fase de exploracin Minera del Ecuador (ENAMI EP). yacimiento ubicado en Zamora Chinchipe.
avanzada.
Lundin Gold supports large-scale mining development
Ecuador and Chile partner to develop the Llurimagua Project Public companies in a strategic deal On January 14 of this year, the Agreement on Financial Conditions to
Last Monday, December 7, 2015, through a strategic partnership with the private national industry Develop the Fruta del Norte Project was signed in Quito with the
between Ecuador and Chile, in the city of Quito, the bi-national The Government has taken one more step in its commitment to Canadian company Lundin Gold.
convention on Shareholders Terms of Agreement was signed to prioritize Ecuadorian industry. On Wednesday, February 3, 2016, 22
develop the Llurimagua mining project between the National Mining local private companies signed the Framework Agreement of The document was signed by the Minister of Mining, Javier Cordova
Company of Ecuador (ENAMI EP) and Codelco of Chile, with the Cooperation with Public Companies in Strategic Sectors, including the Unda, in representation of the Ecuadorian State, and Lukas Lundin,
purpose of building a mine. The project is currently in the advanced National Mining Company of Ecuador (ENAMI EP). Chief Executive of the Canadian company that will exploit the mineral
exploration phase. deposit located in Zamora Chinchipe.

Equipo tcnico recibe capacitacin por parte de CODELCO

Technical team receives training from CODELCO


Rafael Poveda B. ratific el apoyo del Gobierno al desarrollo de la minera a gran escala Stevie Gamboa V. suscribi los acuerdos en representacin de la estatal
Curso de Geofsica en Llurimagua
Rafael Poveda B. confirmed the Government support to develop the large-scale mining project. Stevie Gamboa V. signed the agreements in representation of the state company Instructor Ing. Carlos Cifuentes (Codelco)
El martes 17 de febrero 2016 varios tcnicos gelogos de ENAMI EP
participaron en el taller de Geofsica Aeroportable mtodo Z TEM,
Cobre ecuatoriano incentiva la inversin china para Proyecto Mirador Convenios auspiciado por la chilena Codelco, que se realiz en el campamento La
El 21 de diciembre de 2015 en el campamento de EcuaCorriente S.A. Durante el primer trimestre de 2016, la Empresa Nacional Minera del Conquista; sector El Chontal, rea de influencia del Proyecto Minero
(Ecsa), de capitales chinos, ubicado en la parroquia Tundayme, cantn Ecuador ENAMI EP ha suscrito varios convenios para transferencia de Llurimagua.
El Pangui (Zamora Chinchipe), se inaugur el Proyecto Minero Mirador, informacin geolgico minera con empresas como Grupo 10-X Los participantes fueron seleccionados de cada proyecto donde se ha
pionero en la explotacin de cobre a gran escala en el Ecuador, con la International, Mineralvalle S.A. y Xinjiang Production & Construction contemplado realizar este tipo de estudios en las siguientes fases
presencia del Ministro Coordinador de Sectores Estratgicos, Rafael Corp. (XPCC) de China. mineras.
Poveda Bonilla.
Geophysical course in Llurimagua
Agreements Instructor: Carlos Cifuentes, P.Eng. (Codelco)
Ecuadorian copper encourages Chinese investment
for the Mirador Project On Tuesday, February 17, 2016, several geological specialists from
Throughout the first quarter of 2016, the National Mining Company of
ENAMI EP participated in the Aeroportable Geophysical workshop (Z
On December 21, 2015, in the field of Chinese-owned EcuaCorriente Ecuador, ENAMI EP, signed various contracts to share geological
TEM method), sponsored by the Chilean mining company, Codelco.
S.A. (ECSA), located in the parish of Tundayme, El Pangui County mining information with companies such as Grupo 10-X International,
This took place in the La Conquista Field in the sector of El Chontal,
(Zamora Chinchipe), the Mirador Mining Project was inaugurated, a Mineralvalle S.A. and Chinese-owned Xinjiang Production &
within the area of influence of the Llurimagua Mining Project.
pioneer project in large-scale Ecuadorian copper mining, with the Construction Corp.
Coordinating Minister of Strategic Sectors, Rafael Poveda Bonilla. Participants were chosen from each project where this type of study
has been considered for future mining phases.

Av. 6 de diciembre N31-110 y Whymper


Torres Tenerife, piso 10
Tenerife Towers, 10th floor
+593 (2) 3-953-000
Quito - Ecuador
comunicacion@enamiep.gob.ec
lotaip@enamiep.gob.ec
@ENAMIEP EnamiEp

www.enamiep.gob.ec

Вам также может понравиться