Вы находитесь на странице: 1из 14
SELECTION: REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO- CHAPTER NUMBER AES-H-001 xxx ARAMCO ENGINEERING STANDARD *** ISSUE DATE: 07 OCT 89 REPLACES + 30 MAY 88 er OF 14 TABLE OF. NT SCOPE CONFLICTS AND DEVIATIONS APPLICABLE CODES AND STANDARDS 2 DEFINITIONS 2 SELECTION REQUIREMENTS FOR ONSHORE STRUCTURES 3 AND FACILITIES SELECTION REQUIREMENTS FOR OFFSHORE STRUCTURES 9 AND FACILITIES COATING COMPATIBILITY 12 % DENOTES CHANGE OR ADDITION NUMBER 2 ISSUE DATE: REPLACES AL COATINGS PAGE NO. This Standard, in conjunction with AES-H-101, covers minimum coatings selection requirements for onshore and offshore industrial structures and facilities. Exception: Coating selection requirements for pipelines and piping are given in AES-H-002. “GONELIGTS AND DEVIATIONS. oj Any conflicts between this ‘Standard and other Aramco Engineering Standards (AES's), related Aramco Materials System Specifications (AMSS's), Codes, Forms and Aramco Mandatory Drawings CAMD's) shall be resolved by the Aramco Chief Engineer, Dhahran. Any deviations providing less than the minimum requirements of this Standard require written approval from the Aramco Chief Engineer» Dhahran. PLICABLE CODES AND STANDARD! pecifications, standards; codes, forms: : milar Waterval shall be vf the: latest’ issue’ Cincluding all revisions, addenda, and’ supplements) unless stated otherwise. EFINITIO Utfshore” For purposes of this Standard, the division betueen offshore _and ;onshore is as follows: Arabian. Gulf: Offshore is over-water and includes ‘the shoreline for a minimum distance inland of 30 m measured from the high tide mark, but in the event of known, locally severe atmospheric corrosion caused by proximity to the Gulf, the onshore/offshore dividing line may be moved farther inland. Exception: ‘The causeway between the Ras Tanura Refinery and the Terminal is defined to be onshore. wx ARAMCO ENGINEERING STANDARD ¥%# ) seiectrol 5.1.1 IN REQUIREMENTS, FOR INDUSTRIAL COATINGS Red Se: for a distance inland of 1 km. Splash Zone NUMBER + AES-H-00L ISSUE DATE: 07 OCT 89 REPLACES : 30 MAY 88 PAGE NO; : 3 OF 14 ‘Offshore 15 over water and includes the shoreline New Construction: For legs and other structural members, the splash zone is defined as the area between ISLW -0.5 to 34.3 m. For pipeline risers the splash zone is the area between-ISLW -1.5 to.+4.6 m.: For conductors the splash zone 18, the. area between. ISLH 23. to- 44.6, Maiatenance: For maintenance coating on existing structures the splash zone is defined as the area between MSL +0.3 to 42.1 m Responsible Technical Organization: Where referred to in this Standard, the Responsible Technical Organization is the Coneulting Services Department, Aramco, Dhahran, Saudi Arabia. Approved Product: A coating material that has been approved by the Responsible Technical Organization as meeting the requirements of the applicable APCS or AMSS. If no applicable APCS or ANSS exists, the product must be certified in writing by, the Responsible. Technical Organization. that it suitable toe tke intended sefvice. Oaly approved products ‘are arloued* for.use on Aramco jobs: These requirements apply to all costings referred to in the AES-H-series standards. SELECTION REQU ENTS FOR ONSHORE STRUCTURES FACTLITIE JApprytd‘Coat’s SysI” i | ee “eI I : 1 1 New | \ | Constr'n| Maint. | 1 -|- [exterior |APCS-4 JAPCS-4 |Use aluminum (APCS~4) for bod l(except) |APCS-6 IAPCS-6 jand piping. Asphalt tank Aréa to be Coated and: Other” Remarks 1 | 1 1 vl 1 Ichenical JAPCS-1A |APCS-1B [bodies may be painted entirely |Storage) JAPCS-1B |APCS-1C Iblack~ [apcs-1c 1APCS-26 | 1 1 1 I 1 ! : 1 lapcs-25 | Ifor tanks in coastal areas usel 1 lepoxy coating for wind 1 1 Igirders, top shell course 1 | labove the wind girders» and | 1 Icenter deck of floating roofs.| NUMBER + AES-H-001 wx ARAMCQ ENGINEERING STANDARD »*% ISSUE DATE: 07 OCT 89 : REPLACES : 30 MAY 88 ) seLecTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. : 4 OF 14 ! lApprv'd Coat'g Syst Area to be Coated | 1 I= is 1 and Other I | 1 New | 1 Remarks 1 ! 1 constrnl Maint. | 1 |----------I- I~ 1 | 5.1.2 [Interiors [APCS-3 [APCS-3 |Coat all areas in‘contact with! oil (Dark JAPCS-2A |APCS-2A |standing water, including all | IProducts) | IAPCS-20Al internals except: heating I ‘ AF eit). _ -VApCS-20B I goils’.. Normally these. areas., 1 ! l 1 | Jare as follows: 1 |-----=----1 -1- =| : | 5.1.3 [Interior, |APCS-2A J[APCS-2A |Cylindrical tanks ~ bottom and] Joil (Light) JAPCS-20Al first 0.6 m up walls (1 m for | [Products) | IAPCS-20B|APCS-20 series). 1 | | | |Spheroids ~- up to lower deck | | | | lof manway. I- -I-= -1- -1- < 5.1.4 [Interior JAPCS-2A |APCS-2A |Coat entire interior including IRaw Water | | Jall internals. Ifor Indus-| |trial Use | \- 1 Jinterior, IA [Potable Ef IMater and | [Domestic | 1 | \.. | 1 1 | | | | 1 1 1 1 ie “er —t IAPCs-2B, ICoat entire interior including] } “ary ‘internat Céatings in’ ok | | | | | 1 ! I. 1 ! ' | 1 { PCS-28 Icontact with potable water and Iwith all domestic water sys~ Items require health certifi~ Icate. [For small drinking water tanks lhot-dip ‘galvanized steel’ is lacceptable. AROS 25°] AbCS-25 tis hot “use APES+1A4 or IC where! “faPCS“1A “JAPCS-1B: Jacid/alkalt fumes” or ‘spillage. | JAPCS-1B° JAPCS-1C Jaré present. 1 JApcS-1c JAPCS-26 | ! | =I IVaries with service. Contact | 1 | Raw Water =| 1 5.1.7 |Chemical: | 1 lInterior | | 1 | | lization. 1 | 1 5.1.8 Interior, [APCS-2C |APCS-2C |Coat entire interior indludingl 1 1 1 1 |Responsible Technical Organ- [Demineral-[APCS-28 JAPCS-2B Jall internals. Coating in | lized Water] Icontact uith potable water and] land Boiler [temperatures less than 90 deg | ISkim Tanks! Ic shall be coated with APCS-2B] °) seLecTION REQUIREMENTS FOR INDUSTRIAL COATINGS . PAGE NO. 5 OF 14 xxx ARAMCO ENGINEERING 1 New 1 | I-- 1 1 | constr exterior, |APCS-4 i= linterior [APCS-2A |Gas/oil | APCS~3 [Water JAPcS-2¢ |Separating! ICexcept = | Idesaiters | land dehy- | |drators) | | | I-- -1- Interior, | APCS~3 |Desalters/| APCS-2A [De- 1 _Ihydrators :| [Structural] APeS-4 “ “"Isteel(Mild| APCS-6 Iatmos-- | | ~Lpheri. obs, Texps: ees |Structural] [Steel (In-[APCS-4 dustrial JAPCS-6 land/or [Apcs-1A lHigh JAPCS-1B Humidity [APCS~22 | Atmos- JAPCS~1C Ipheric - |APCS~26 lExposure) | Istructurall \Steel [apcs-3 other than|APCS~10 \Piles 1 1CBuried orl limmersion | \Service) | NUMBER : AES-H-00L STANDARD *xx ISSUE DATE: 07 OCT 89 REPLACES : 30 MAY 88 Area to be Coated 1 and Other I 1 ' Remarks i nl Maint. | 1 1 1 peels JAPCS-4 [alae for attached piping. a | renee bee lapcs-2A |For GOSP traps; degassers, andl JAPCS-2C |HOSEP's in wet sour servicess | JAPCS-3. |coat entire interior surface | lincluding all internals except! Iheating coils. For wet sweet |’ Iservices coat 0.3 m above |maximum expected water level. Coating not required in dry Iservices. APCS-3 [Coat bottom 60% including all | 1 1 1 1 = |e 1 JAPGS-2A Jinternals up to this level. 1 4 | | \ I | 1 | 1 eS LAPCS-4 JAPCS-6 Japcs-1B JAPCS-1C Japcs-22 JAPCS-26 1 1 1 1 \ 1 1 1 1 1 | 1 1 : 1 1 1 1 JAPCS~3 JAPcs-10 Japcs-19 See paragraph 5.4.2 below for pile driven structures. 1 ! | 1 k { 1 1 | 1 1 1 | 1 1 l 1 I 1 1 I 4x D SELECTION y ARAMCO ENGINEERING REQUIRENENTS FOR INDUSTRIAL COATINGS PAGE NO. NUMBER : AES-H-001 STANDARD ¥#* ISSUE DATE: 07 OCT 89 REPLACES : 30 MAY 83 6 OF 14 lApprv'd Coat's Sysl 1s 1 New | Constr'nl Istructurall Steel and |APCS-11A JAPCS~11A] JAPCS-11B [Stacks I CAbove.. 1 1150 deo )1 steel: 1 |Cold Sys- |APCS-2A |tems(Poly— lurethane lor Foam IGlass | [Hot Systems |valvesy [Rotating Equipment, |APCS~22 | Insulated] 1 1 1 TAPCS-4 JAPCS-6 lelectricall [Equipment Itauncher» Receivers IProversy land Skid [mounted lEquipment jexterior [surfaces | 1 : 1 1 l 1 1 = 1 1 1 1 1 i | I = See Remarks - [No coating needed where Area to be Coated “| and Other Il Remarks Maint. | APCS-11B1 | 1 = 1 1 1 APCS-2A |Coat steel facilities to be loperated intermittently below lthe atmospheric dew point. [Minimum dry film thickness is ]100 micrometers. 1 [continuous operating temper— vlatures exceed 6 degC and “Tfacility ts service at Ileast 90% of the time. lException: Use APCS-2C if loperating factor is less than |90% or if the facility is [subject to water deluge. [See AES-B-006. i fe APCS=4": |For new construction séé also" APCS-6 [paragraph 5-4.1"Shop-applied APCS-22 |Coatings™ in this Standard. Apcs~26 | 44x ARAMCO ENGINEERING ) sevectron RE 5.3.8 «5.3.9 5.3.10 5.3.13 we NUMBER + AES-H-O01 STANDARD ¥*X ISSUE DATE: 07 OCT 89 REPLACES : 30 NAY 88 QUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO~ 7 OF 14 Area to be Coated 1 | ' I- and Other 1 1 New 1 Remarks 1 | I constr'n| Maint. | I I-- --1-= 1 -1 [Launchers | | Icoat entire interior up to thel Jana lapcs-3 |APCS-3. [main block valve. 1 [Receivers | 1 1 ! lin’Water. I 1 IGoating:is ‘not, requiredsin I Iservices | ! lhydrocarbon’ service. 1 [Interior | 1 1 1 [Surfaces | 1 1 1 Fasteners, |APCS-1B IGarbon | APCS-1¢ [Steel and |APCS-4 ILow Alloy Steel 1 [-- 2 [Galvanized [steel Stainless -f Steel 2 | ICopper ! JAlloys 1 Ie Isteel Ac- |Hot-dip Icessories |Galvan- I CHand lized JAPCS-22 [cordance with ASTM A385_and [Rails» Jor APCS-4]APCS~26 |A386. 5 o ILadders, Jor APcS-6] l Brackets, |orAPCS-22] | letc.) lorAPCS-261 1 pees |APcS-1B [Coating on the fasteners shall’ |apcS-1¢ |be similar to the coating on | JApCS-4 [the structure. Galvanized or | JAPCS-26 Ifluorocarbon coated fasteners | 1 |may be used without subsequent] | peane es 1 1 te 1 |Not normally coated. If top~ 1 Icoating is necessary un~ I en Iweathered galvanizing prime. I 1 ‘VFirs€ bth APCS= 2. % For OP 1 1 | 1 1 1 1 1 [local repairs to galvanizing luse APCS-22, APCS-26 or the Izinerich primer for APCS-1C. Not normally coated. If top> lcoating iS required, prime” Ifirst with APCS-24, Feces ‘|Not.nde mally coated. 1 1 IE 1 1 1 1 | 1 1 lapcS-4 [Paragraph 5.3.10 applies. JAPCS-6 [Galvanizing shall be in acu NUMBER : AES-H-001 #H ARAMCO ENGINEERING STANDARD *xx ISSUE DATE: 07 OCT 69 REPLACES: : 30 MAY 88 ) SELECTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. : 8 OF 14 lApprv'd Coat" Sys} Area to be Coated I- = 1 and Other 1 New | 1 Remarks | Constr'n| Maint. | ~nen- l= I- 1- 5.3.14 [Steel or [APCS-1B JAPCS-1B |If galvanized steel is used. IConcrete JAPCS-12 [APCS-12 |Paragraph 5.3.10 applies. [Floors & | 1 TWalkways Isealer coat shall be applied ) ICexcept Ite concrete floors prior to lorating) I- =| aon 5.3.15 [Grating IGrating shall be galvanized lin accordance with ASTM A385 land A386. Grating shall not |be painted in lieu of Igalvanizing. End banding Ishall be coated per paragraph 15.35.10. -|- |See AES-P~104. Ie 5.3.16 |Electrical Iconduit 1 1 I I 1 1 1 1 | 1 1 1 | 1 | 1 ! | | | | | | 1 lapplication of non-skid paint.| 1 | | | | 1 1 ! | | | fel |Shop- [See INot IVendor/Contractor painting 1 lapplied. [Remarks IAppli- Ishops shall use paint systens. | Coatings "| Icable” |that meet the following — i | Iconditions: 1 wddQ they are suitable for’ :the “YS “intended “tse ‘or the’ pro-~". 1 1 duct and, | 12) they can be maintenance ! | painted in SAO with | | standard APCS systems. 1 1 ad | i | | | | 1 1 ! | | 1 | —|= 5.4.2 Piling, [APCS-2A |APCS-2A |Pre-coated piles shall be Driven |APCS-3 JAPCS-3 Icoated over the entire area APCS-104 IAPCS-26 lexpected to be below ground. | Piles driven bare shall be 1 Iback-excavated to a depth of 1 Jat least 1m below grade and | lcoated with APCS-10 or any of 1 Ithe maintenance coatings in 1 Ithis paragraph. 1 I NUMBER AES-H-001 yore ARAMCO ENGINEERING STANDARD x*¥ ISSUE DATE: 07 OCT 89 REPLACES 30 MAY 88 SELECTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. + 9 OF 14 6 CTION REQUIREMENTS FI RUCTURES. AG. 1 lApprv'd Coat's Sysl Area to be Coated | 1 a - : and Other 1 | 1 New | | Remarks 1 1 | Constr'n| Maint. | ' ! i= he =| f x )tet JAtmos- [APGS-1A |APGS-1B [Epoxy enanels may be used for | Ipheric JAPCS-1B |APCS-1C |piping color~coding purposes. 1 [Service JAPCS-22 JAPCS-22 |For new construction use 1 1 JapcS-25 |APCS-25 |APCS-1A for yard constructions! 1 1 IAPCS-26 |for on site painting APCS-1B |’ ! 1 1 lis acceptable. % 6.1.2 Isplash [Monel |APCS-19B]APCS~19B shall not be substi- IZone [Sheath | tuted for Monel sheathing on [Service Inew construction except on except Iboat [figurations where sheating lis difficult. Substitution lis not allowed .on primary. lYoad-bearing ‘members. Only the Isprayable grade’ (APCS-19B) i's lallowed. The atmospheric zone |coating must overlap the top lof the Monel sheathing by at Ieast 75 nm. |See paragraph 4.2' for the ldefinition of splash zone. | 1 | | 1 geometrically intricate con- | | 1 ab aT ©) landings) Sibmersed | Service HVALL Offshore struckurdsare “leathodically protected. a [See AES-H-002. 1 1 1 I 1 % 6.1.4 IPipelines,| \conductors| land Risers! 1 * 6.1.5 |Grating |Same as for onshore service. |See paragraph 5.3.15. For |boatlandings, cellar deéks, land associated connecting lwalkways, ethylene-vinyl— alcohol copolymer shop coated Igrating is an acceptable Jalternative coating to Igalvanizing. | 1 I | 1 1 1 a \ | 1 1 I 1 ; 1 1 1 1 1 1 cl NUMBER + AES-H-001 ARAMCO ENGINEERING STANDARD *x* ISSUE DATE: 07 OCT 89 REPLACES +: 30 MAY 88 SELECTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. +: 10 OF 14 1 lApprv'd Coat'g Syst Area to be Coated 1 | Jewe a —s and Other 1 1 1 New | 1 Remarks 1 1 I constr'n| Maint. | 1 I- a= I~ -|-- | 6.1.6 | |Helidecks,|APCS-1A JAPCS-18 [Requires the addition of 1 [Flat Plate] | or -1C |silica. 1 IDecks and | | | 1 ) |Walkways, | 1 | | 1& Chequer -| | | 1 [Plate 1 | | | [Decks and | 1 1 | IMalkuays | 1 ! 1 eet fo —_ y 6.1.7 [Fire- 1 1 [See AES-B-006 and AES-B-009. | Iproofing | | | 1 i na | eon =| =~ ~I- 1 6.1.8 [Structural|apcs-11A [APCS—11A] 1 ISteel and |APCS-11B |APCS~11B] 1 [stacks 1 | 1 1 | Above 1 | 1 1 1150 deo c I 1 1 1 6.t9 “APGS=19 [APCS-19ATSed” 1 Japcs-19B1 yee 6.261 [Tanks and farcs-ah JApcs-1B 1 sass 0252.52 Leaning, col ARC Bee eee . lexterlor Apes eae. [se [ae Yapcs-26 | j t 1 iis | [tanks and | \Vessels, | 1 1 1 1 1 \ I 1 ltnterior coating requirements | lare the same as for onshore 1 1 1 1 1 i 1 | | lInterior \ |services. See paragraph 5.1 1 \ land 5.2. I-- | —-1~ Isteel c 1 |Same as for onshore service. Ivered with! | Isee paragraph 5.3.5. |Insulating! 1 I IMaterials | 1 1 NUMBER AES-H-001 xxx ARAMCO ENGINEERING STANDARD xxx ISSUE DATE: 07 OCT 89 - REPLACES : 30 HAY 88 &) SELECTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. 11 OF 14 ' lApprv'd Coat'g Sys| Area to be Coated I I I-- ~|- ==] and Other 1 1 1 New | I Remarks I ! I constr'n} Maint. | 1 I--- -|-= = I= * 6.2.4 [Valvesy [APCS-IA_|APCS-1B |For new construction, see alsol [Rotating |APCS-1B |APCS-1C |paragraph 5.4.1 "Shop Applied | lEquipment,|APCS-1C |APCS-6 |Coatings" in this Standard. = | lElectricallAPCS-6 | |APCS-22 |If color coding is specified ) lEquipment,|APCS-26 |APCS-26 Ifor safety or other reasons, ! | ILaunchers | | luse epoxy-enamel if APCS~1 1 IReceiverss| 1 Iseries not available in 1 land Skid- | 1 Idesired color. 1, {mounted | ' | l lEquipment | | I 1 lCExterior | | 1 1 [surfaces | | 1 | Sa 1- a 6.2.5 [Launchers | 1 Isame as for onshore service. | land Recei-| 1 ISee Paragraph 5.3.8. 1 Ivers in | | 1 | IWater 1 | | 1 oo, |Services: | te 1 we ; i SE) Tebiteritors | ese t pe err eareeal : ISurface) | 1 ! - ' y3 IHand JAPCS-1B [Paragraph 5.3.10 applies. 1 [Rails» JapcS-1¢ |Galvanizing, shall bein I “Leader ey [nized oF TAPCS=22: [st eordance “With. ASTH A385! 0°71 ~ land JAPCS-1A" JAPCS-26. land A386.” . ! IBrackets’ |APCS~1B | | 1 | 1 1 1 1 1 -_ | 1 6.3.2 |Fasteners,| 1 ISame as for onshore service | Icarbon | | lexcept that APCS-4 is not 1 [Steel & | | Ipermitted. 1 ILow Alloy | | |See paragraph 5.3.9. - 1 [Steel I | ! | 1- =|=-= 1 1 6.3.3 [Galvanized] 1 |Same as onshore. See 1 Isteel I 1 Iparagraph 5.3.10. 1 NUMBER + AES-H-001 vont ARAMCO ENGINEERING STANDARD ¥x% ISSUE DATE: 07 OCT 89 REPLACES : 30 MAY 86 - > SELECTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. + 12 OF 14 1 lApprv'd Coat'g Syst Area to be Coated I! 1 im lee | and Other 1 | | New 1 1 Remarks 1 1 | constr'n] Maint. | 1 [----------1- =I 1 =~ | 6.3.4 [Aluminum | |Same as for onshore servi- | [Stainless | Ices. See paragraphs 5.3.11 | ISteel & | land 5.3.12. I I Copper 1 1 | ) [Alloys — | 1 | io ——i | 1 6.3.5 [Electricall ISee AES-P-104. 1 | | [Conduit =| 6.4 SPM Buoys 6.4.1 CALM JApply APCS~3 plus APCS-9 as | land SALM la sealer coat over entire 1 lexterior lexternal surface. Apply 1 ISubmerged Janti-fouling on bottom up 1 vier [Zone Ito water. Line. 1 1 | 1 1 1 | I | 1 1 1 12 [oeoes 6.4.2 [CALM and - Isae as‘ for submerged zone ISALM Exte- lexcept anti-fouling is not Irior At- lused. Imospheric 6.4.3 1APcS-3 inlet JAPCS=1A. cI Tee etek AL rs I= 1 6.4.4 [Interior JAPCS-1A JAPCS-1C |Alternaté system is APCS-3 | ICALM Buoy | IAPCS-22 [plus APCS-9 as a sealer and = | lArea’ 1 1 |topcoat. 1 \ I~ | a 1 6.4.5 [CALM and JAPCS-1A JAPCS-1C | 1 ISALH | Jarcs-22 | 1 |Piping and] | | | Ivalves | | +H FA i 7 con COMPATIBILITY TL Purpose The Overcoating Chart shows which combinations of existing coat/top coat paint systems may and may not be used on Aramco facilities. Combinations marked "N™ shall not be used. NUMBER + AES-H-001 ve ARAHCO ENGINEERING STANDARD x¥¥ ISSUE DATE: 07 OCT 89 d REPLACES : 30 MAY 88 SELECTION REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO 13 OF 14 Combinations marked "NR" shall not be used unless authorized in writing by the Responsible Technical Organization. 7.2 Overcoating Chart COATING BEING APPLIED Y= Yes N= No NR = Not recommended. ) 1 1 Icoal | | [Zine | 1 1 | ITar lEpoxy [Epoxy |Sili- | 1 ! lepoxy [Epoxy |Mastic [Enamel |cate Alkyd! | ~ [anna ===] = woeen=|=n===] | Epoxy (2) DHSS ESE SE ea ee i NES LCL | | ! 1 ! | | 1 1 Coal Tar 1 | 1 | | 1 ! | Epoxy C2) FY oT YF NR OEY TON OD eat 1 1 1 1 1. | 1. | | Epoxy 1 1 | 1 1 | 1 | Mastic (2) TNR | ¥ Foy Toy dou Pycol | 1 | 1. ! | 1 ! | 1 | 1 1 | 1 | J ENR oo NR oh AMP kal YG Ls ae mth a ghee omfg oe ch {SSS ee IT Zin 1 I 1 1 1 | 1 | 1 Silicate SECRECY cecein cet I-A S PNR He eR IN 1 | | 1 | 1. | 1G Alkyd Cw tn tow Ft own Pw ty t ) ! 1. | 1. | 1 1 1 | ‘Silicone 1 1 ' 1 1 1 ! be. Alkyd Tu oP NbN PNP ON TN GL Vt al Gaeeee ‘I I Heat ae), I eh, Fo: Polyurethane -t as ee ! als Hee ee 1A Enamel VNR TNR OT ON PON PONS “Pvc iT 1 1 ! | | 1 1 [i Bituminous | N TN Tt N F N TN TNR I IN i | 1 ! |. | 1 | G Chlorinated | | 1 | | | 1 | Rubber Tn otn ton EON TN TY I | 1 | | | | | 1 1 Latex 1 ! | | 1 | 1 7 | Emulsion Pwr tues} oN oT oN TN TVS 1 1 | 1. | | 1 1 1 Lacquer re tra f oe 1 oN Tarot : Notes™ (1) Gloss must be removed from existing coat by sanding or similar prior to applying topcoat. (2) Intercoat intervals must be observed. HK NUMBER : AES-H-001 ARAMCO ENGINEERING STANDARD «¥x ISSUE DATE: 07 OCT 89 REPLACES : 30 MAY B8 REQUIREMENTS FOR INDUSTRIAL COATINGS PAGE NO. 14 OF 14 COATING BEING TED Yes N= No NR = Not recommended. Isili-[Poly- 1 IChlori-|Latex 1 Icone lurethanelBitu- [nated |Emul- = |Lac~ AlkydlEnamel |minous |Rubber |sion lquer Epoxy ¢2) 1 ya Coal Tar Epoxy (2) Epoxy Mastic (2) Epoxy Enamel (2) Silicate silicone Polyurethane | Enamel éhisrinatéa™ Rubber Latex Emulsion v NR Notes: (1) Gloss must be removed from existing coat by sanding, or similar prior to applying topcoat. (2) Intercoat intervals must be observed

Вам также может понравиться