QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date:
DOC TITLE
PROCEDURE FOR FLANGE 18/01/16
MANAGEMENT Page 1 of 13
OF
DOC NO BNL-QCD-PFM-110
18/01/
001 IDC
16
Issued for Internal review T. A. D. H. C. U.
This document has been generated by an Electronic Document Management System. When printed it is considered as a for information only copy.
The controlled copy is the screen version and it is the holder's responsibility that he/she holds the latest valid version.
The change(s)/amendment(s) noted below have been made and approved by the Managing
Director/CEO for issue.
TABLE OF CONTENTS
Content
1.0 Purpose......................................................................................................................................................................4
2.0 Scope.........................................................................................................................................................................4
3.0 References.................................................................................................................................................................4
4.0 Safety Precautions.....................................................................................................................................................4
5.0 Equipment and Man Power.......................................................................................................................................5
5.1 Equipment:............................................................................................................................................................5
5.2 Manpower:...................................................................................................................................................5
6.0 Bolt Tightening.........................................................................................................................................................5
7.0 APPENDIX.............................................................................................................................................................12
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 4 of 16
MANAGEMENT
1.0 Purpose
This procedure describes the requirement for bolt tightening for piping system.
2.0 Scope
2.1. The procedure defines the method for bolt tightening using
manual/hand torque wrench, hydraulic torque wrench and hydraulic
stud bolt tensioner.
2.2. Application of bolts tightening tool shall be done as per the following
scope:
3.0 References
ASME B16.5 Pipe, Flange, and Fitting
Manufacture Recommended
Special attention is paid and shall be paid to flange management works as it utilizes
high-pressure hydraulic oil. Supervisor must be present at location to supervise the
worker prior to bolt tightening activity. Tools and equipment should be inspected
before use to ensure good working condition. The working area shall be roped of
and warning notices shall be displayed. For high elevation or remote area work,
adequate scafolding shall be erected for safety. Operators shall handle components
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 5 of 16
MANAGEMENT
during placing or removing the bolt tightening equipment as per manufacturers
recommendation. Operators shall also be equipped with safety glasses, hard hats,
gloves and safety shoes.
5.1 Equipment:
a. Hi-Force Including Accessories.
b. Manual/Hand Torque Wrench
c. Hand Tools
5.2 Manpower:
a) Mechanical Supervisor
b) Safety man
c) Mechanic/Helper
I 30% 1-2-3-4
II 60% 4-3-2-1
IV 100% 3-4-1-2
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 8 of 16
MANAGEMENT
I 30% 1-2-3-4;5-6-7-8
II 60% 8-7-6-5;4-3-2-1
IV 100% 2-6;1-5;4-8;3-7
16-15-14-13;12-11-
II 60%
10-9:8-7-6-5-;4-3-2-1
1-2-3-4;5-6-7-8;9-10-
III 100%
11-12;13-14-15-16
1-12-8-13;2-11-7-
IV 100% 14;3-9-5-15;4-10-6-
16
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 10 of 16
MANAGEMENT
BOLT
TORQUE
STAGE SEQUENCE REMARKS
SETTING
TIGHTENING
1-2-3-4;5-6-7-
8;9-10-11-
12;13-14-15-
I 30%
16;17-18-19-
20;21-22-23-
24
24-23-22-
21;20-19-18-
17;16-15-14-
II 60%
13;12-11-10-
9;8-7-6-5;4-3-
2-1
1-2-3-4;5-6-7-
8;9-10-11-
12;13-14-15-
III 100%
16;17-18-19-
20;21-22-23-
24
3-5-21-13;4-
6-22-14;17-
16-1-9;18-15-
IV 100%
2-10;24-12-
20-8;23-11-
19-7
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 12 of 16
MANAGEMENT
BOLT
TORQUE
STAGE SEQUENCE REMARKS
SETTING
TIGHTENING
1-2-3-4;5-6-
7-8;9-10-11-
12;13-14-15-
I 30% 16;17-18-19-
20;21-22-23-
24;25-26-27-
28
28-27-26-
25;24-23-22-
21;20-19-18-
II 60% 17;16-15-14-
13;12-11-10-
9;8-7-6-5;4-3-
2-1
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 13 of 16
MANAGEMENT
1-2-3-4;5-6-
7-8;9-10-11-
12;13-14-15-
III 100% 16;17-18-19-
20;21-22-23-
24;25-26-27-
28
17-13-3-5-9-
25;18-14-4-6-
10-26;16-20-
IV 100% 8-1-28-11;15-
19-7-2-27-
19;21-22-23-
24
BOLT
TORQUE
STAGE SEQUENCE REMARKS
SETTING
TIGHTENING
1-2-3-4;5-6-
7-8;9-10-11-
12;13-14-15-
16;17-18-19-
I 30%
20;21-22-23-
24;25-26-27-
28,29-30-31-
32
32-31-30-
29;28-27-26-
25;24-23-22-
21;20-19-18-
II 60%
17;16-15-14-
13;12-11-10-
9;8-7-6-5;4-3-
2-1
1-2-3-4;5-6-
7-8;9-10-11-
12;13-14-15-
16;17-18-19-
III 100%
20;21-22-23-
24;25-26-27-
28,29-30-31-
32
32-6-24-
14;31-5-23-
13;30-7-22-
15;29-8-21-
IV 100% 16;28-4-18-
10;27-3-20-
9;26-1-17-
12;25-2-18-
11
Doc. No:
QUALITY CONTROL DOCUMENT BNL/QCD-PFM-111
Issue Date: 18/01/16
PROCEDURE FOR FLANGE
DOC TITLE Page 15 of 16
MANAGEMENT
7.0 APPENDIX
7.1 Recommended flange bolt torque.