note these are purely construction thumb rule rates no consultancy and PMC included in this
Table 1
total 4500
note for arriving at a projected estimate per Sqft we need to consider this cost 10% less while multiplying
with the total area considering difference in the finishing materials / AC / furniture quality etc so
total 4050
this rate of execution is worked out on purely thumb rule base subject to change with respect to
detailed plan and specifications.