Вы находитесь на странице: 1из 4

CARLITO V.

MARASIGAN

POSITION APPLIED FOR : SCAFFOLDING


FOREMAN/SUPERVISOR

PERSONAL DATA
Date of Birth : July 20, 1952

Place of Birth : Lagnas, Bauan,

Nationality : Filipino

Civil Status : Married

Height : 54

Weight : 130 lbs.

Sex : Male

Educational Attainment : High School Graduate

Notify in case of emergency : Vivian Marasigan

Address : Poblacion, San

TIN : 765003

SSS No. : 04-040845-0

Passport No. : EB1275640

Issued At : Batangas

Expiry Date : 29 October 2015


EMPLOYMENT RECORD
Employer : KENTZ ENGINEERS & CONSTRUCTORS
Job Site : Mozambique, Africa
Position : SCAFFOLDING SUPERVISOR
Date : December 26, 2010- September 16, 2011

Duties and Responsibilities


Supervise/ instruct assigned scaffolder for erection/ installation of safety
scaffold for working platform of pipe and valve installation at pipe rack, for
fixing or tightening of steel structural job, for vessel and tank blasting and
painting and some areas which is in need of working platform. Instruct to
dismantle after the works completely done.

Employer : TOZZI QATAR


Job Site : Qatar
Position : SCAFFOLDING SUPERVISOR
Date : December 06, 2009- February 15, 2010

Duties and Responsibilities


Supervise/ instruct designated scaffolder to install hangingscaffold at pipe
rack for tightening of steel structure bolt, vessel or tank pedestal bolt and for
installation of pipe line purposes. Give instruction to scafffolder which
scaffold is required to dismantle.

Employer : ERSAI Caspian Contractor LLC


Job Site : Republic of Kazakhstan
Position : SCAFFOLDING FOREMAN
Date : December 21, 2005- August 30, 2007

Duties and Responsibilities


Instruct assigned scaffolder for what area are required to install
scaffold. Type of scaffold that we installed are hanging tower scaffold,
canteliver scaffold at pipe rack area and temporary access scaffold.

Employer : SUFFOLK PETROLEUM SERVICES LIMITED


Position : SCAFFOLDING SUPERVISOR
Date : May 28, 2003- February 28, 2004

Duties and Responsibilities


Supervise/ instruct designated scaffolder to install hangingscaffold at
pipe rack for tightening of steel structure bolt, vessel or tank pedestal bolt
and for installation of pipe line purposes.Erection of scaffold for vessel and
tank for blasting and painting purposes.Give instruction to scafffolder which
scaffold is required to dismantle. Supervise/ instruct assigned scaffolder
for erection/ installation of safety scaffold for working platform of pipe and
valve installation at pipe rack, for fixing or tightening of steel structural job,
for vessel and tank blasting and painting and some areas which is in need of
working platform. Instruct to dismantle after the works completely done.

Employer : CPEC
Position : SCAFFOLDING FOREMAN
Date : November 10, 1998- April 15, 2001

Duties and Responsibilities


Supervise/ instruct assigned scaffolder for erection/ installation of
safety scaffold for vessel and tank blasting and painting purposes, install
hanging, cantilever scaffold at pipe rack structure for pipe/ valve installation,
steel bolt tightening.

Employer : YOUNG SHIN PLANT CONSTRUCTION CO.


LTD.
Taiwan, R.O.C.
Position : SCAFFOLDING GENERAL FOREMAN
Date : September 09, 1997- September 09, 1998

Duties and Responsibilities


Supervise/ instruct assigned scaffolder for for erection/ installation of
safety scaffold for working platform of pipe and valve installation at pipe rack
for fixing or tightening of steel structural joint, for vessel and tank blasting
and painting and some areas which is in need of working flatform. Instruct to
dismantle after the works completely done.

Employer : Consolidated Contractors International


Co.
Abu Dhabi, U.A.E.
Position : SCAFFOLDING FOREMAN
Date : February 24, 1995- January 31, 1996

Duties and Responsibilities


Supervise/ instruct designated scaffolder to install hanging scaffold at
pipe rack for tightening of steel structure bolt, vessel or tank pedestal bolt
and for installation of pipe line purposes.Erection of scaffold for vessel and
tank for blasting and painting purposes.Give instruction to scaffolder which
scaffold is required to dismantle.

Employer : Consolidated Contractors International


Co.
Jubail, K.S.A.
Position : FOREMAN SCAFFOLDING
Date : March 30, 1992- February 10, 1993

Duties and Responsibilities


Instruct assigned scaffolder for what area are required to install
scaffold. Type of scaffold that we installed are hanging tower scaffold,
cantilever scaffold at pipe rack area and temporary access scaffold.

Employer : A.G.&P.
Bauan, Batangas, Philippines
Position : FOREMAN SCAFFOLDER
Date : April 29, 1987- December 22, 1989

Duties and Responsibilities


Supervise/ monitor scaffold erection and installation for blasting and
painting purposes of vessel and tank and for fixing of bolt of steel structure.
Instruct to install of hanging, cantilever and tower scaffold in some required
area for safety working platform and dismantle right after the work were
completely done.

Employer : Ballast Nedam Group N.V.


Riyadh, K.S.A.
Position : FOREMAN SCAFFOLDER
Date : January 14, 1982- September 06, 1986

Duties and Responsibilities


Instruct/ monitors installation of scaffold for installation of false work of
slab, beam for laying of concrete hallow blocks and finishing touches,
working platform for pouring concrete purposes. Install scaffold in some
areas as per requested by the supervisor and dismantle after the work
completed.

Вам также может понравиться