PROJECTREPORT

PROJECT:friendsapartmentltd
REF:456111560546
ADDRESS:
_______________________________ nca:
456111560546
Architect;tarus/steve
Week:28outof75+addedworkhowmanyweeks?
ContractStartDate:1/9/2016
ContractcompletionDate:28/2/2018
Maincontractor:_kensteel_constructionltd
Clerkofworks/zachariah
+toprogramme2weeksaheadof
Progress

Store Activity stat Start/fini changes verificat REMARK


y us nish ion
level
base Formwork 100 15/9/16
ment 1.bases/beams/colu % To
mns 06/10/16
2 suspended slab &
beams
3 staircase starters
4. lift shaft base
Reinforcement- 100 20/9/16 Basement Structura
1.bases/beams/colu % added l
mns work arch
2 suspended slab &
beams
3 staircase starters
4. lift shaft base
Concretes 100 7day-
1.bases/beams/colu % 28/9/16 to Bases 28days
mns 20/10/16 collumn bas18.7-
2 suspended slab & 26.7
beams slab18.7-
3 staircase starters 25.6
4. lift shaft base
Substructure 100 15/10/16
walling %
Plaster 100
%
flooring 0%
subst Retaining wall 100
ructu %
re
Retaining bases & 100
columns %
Concrete to 100
Retaining bases & %
columns
Walling to ditto 100
%
Plaster & 100
masterseal %
application to
external walls
Plumbing
electrical 1.AC
provinsions
on the
basement
2 provide
power point
and allow for
trunking
provinsion to
contain the
cables
3

Grou formwork 100


nd %
floor
Reinforcement- 100
%
Concretes 100
collumns % Col-18.7-
Suspended slab 11/11/16 25.7
Stairs Slab17.0-
lift 24.9
Superstructure 100 26/1/17 Client
walling % approval
on
setting
Precast lintel 100
%
Electrical -changes
1-Change in bed
switches heights
2-dp relocation
3-additional AC switch to
-lounge
-m/br
-br o2
4 relocation of switch to
o1
light at br
5. agreed on the
positioning of
metering panel-
switch board l-
4.0mx2.0m wx
height 2.7m

plumbing
Plaster to ground
unit ceiling 100
Walls %
Plaster to parking 0%
bay
ceilling 9/24
flooring 0%
1st Formwork to 100
floor column, suspended %
slab, staircase ,lift
rcc
Reinforcement- to 100 Col-17.3-
column, suspended % 26.6
slab, staircase ,lift Slab-18.7-
rcc 26.0
Service s to ditto 100
%
Concretes 100
collumns % 20/28th/1/1
Suspended slab 7 16/12/16
Staircase 1 13/12/16&
2
Lift shaft wall 1
2
unit A
Superstructure 100 25th week Architectural
walling % 2/2/17 Review 6 to
9
Precast lintel 100
%
electrical 100 1st fix
% ongiong
plumbing 100 1.Relocation 1st fix
% of stack pipe ongoing
for kitchen
sink whb
shifted to h
to f
2.location of
drain pipe for
air
conditioner
machine at
balcony front
& rear
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor 0%
Tiles to floor

Sample unit
Unit B
Superstructure 100 complete
walling %
Precast lintel 100 complete
%
electrical 1st fix
plumbing 1st fix
Plaster to ceiling 100 6/3 to complete
Beams % 24/3/17

Walls/collumns

Rendered floor Hacking


ongoing
Tiles to floor
Superstructure 100 27th wk Architectural
Unit walling % -18/3/17 Review 9 to
C 12
Precast lintel 100
%
electrical Nil
Plumbing nil
Plaster to ceiling
Beams

Walls/collumns

Rendered floor
Tiles to floor

2nd Formwork to 100


floor column, suspended %
slab, staircase ,lift
rcc
Reinforcement- to 100
column, suspended %
slab, staircase ,lift
rcc
Service s to ditto 100
%

Concretes 100 Col-17.0-


Columns-20/2/17 % 25.1
17th&23rd /
Suspended slab Dimension Client-fl
1/17
17/2/17- alternation 1,2,7,8 & slab18.7-
at 3,4,5,6 26.2
washrooms
to dinning to
create space
for washing
machine
1st fl Staircase 1 28/1/17
to 2nd 2 29/1/17
fl
1st fl Lift shaft wall 1
to 2nd 2
fl
unit A
Superstructure 100 28th wk-
walling % 21/3/17 to
Precast lintel 100 ongoing
%
electrical 100
%
plumbing 100
%
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor 0%
Tiles to floor

Unit B
Superstructure 100 20/3/17 to
walling %
Precast lintel 0%
electrical
plumbing 1.Initially wc
s were close
couple and
later
changed to
wall hang
2.additional
stack pipe
for wc
belonging to
bedroom 01
Plaster to ceiling 100
Beams %

Walls/collumns

Rendered floor
Tiles to floor
Superstructure 100 21/3/17 to
Unit walling %
C
Precast lintel 0%
electrical
Plumbing
Plaster to ceiling
Beams
Walls/collumns

Rendered floor
Tiles to floor

3rd Formwork to 100 1. Client/ar


floor 1.column, % 2. ch/desig
2.suspended slab, 3.13 to ner
3.staircase ,4.lift rcc 18/3/17
4.
Reinforcement- to 100 1
1.column, % 2
2suspended slab, 3-
3.staircase 4,lift rcc 4
Service s to ditto 100
%
Concretes 100 -
collumns %

Suspended slab 100 17&24 of


% feb
3rd fl Staircase 1
to 4th 2
fl
3rd fl Lift shaft wall 1 100 9&10/3/17
to 4th 2 % 13&14/3/1
fl 7
unit A
Superstructure 0%
walling
Precast lintel 0%
electrical
plumbing Added water Client/ar
filter and ch
located at
utility area-
15th/3/17
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor 0%
Tiles to floor
Unit B
Superstructure 0%
walling
Precast lintel 0%
electrical
plumbing Washroom
RELOCATION
OF WC at
unit A -m/br
& br o1-14th
3/17
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor 0%
Tiles to floor 0%
Superstructure 0%
Unit walling
C
Precast lintel 0%
electrical
Plumbing
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor
Tiles to floor
4th Formwork to 100
floor column, suspended %
slab, staircase ,lift
rcc
Reinforcement- to 100
column, suspended %
slab, staircase ,lift
rcc
Service s to ditto 100
%
Concretes 0%
collumns
Suspended slab O 100 23/3/17 & E TO A
TO E % remains
Staircase 1
2

Lift shaft wall 1


2
unit A
Superstructure
walling
Precast lintel 0%
electrical
plumbing
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor 0%
Tiles to floor 0%

Unit B
Superstructure 0%
walling
Precast lintel 0%
electrical
plumbing
Plaster to ceiling 0%
Beams

Walls/collumns

Rendered floor 0%
Tiles to floor 0%
Superstructure 0%
Unit walling
C
Precast lintel 0%
electrical
Plumbing
Plaster to ceiling 0%
Beams
Walls/collumns

Rendered floor
Tiles to floor DATE

1 EHS OSHWAL 2007


2 SCALPFOLD
3 DUST SCREEN
4
DRAWING
/INFORMATION
RECEIVED ON SITE
1 Safety first
2 Safty leads to clean
work
DRAWING/INFORM
ATION REQUIRED
ON SITE
1 Gym layout plan awaited
2 Tile layout plan awaited
Invertor location /
Soft drw i
DELAYS
INCLUDING
DEFECTIVE WORK
[ACTION TAKEN]
Ferry of bldg stones
introduced pulley
machines 2no
STOPPAGES 0hrs
[HOURS]
TOTAL TO DATE

VISITORS DATE
INCLUDES STATORY
INSPECTORS
1 Municipal engineer 21/3/17
2 Project civil 21/3/17
engineer

PLANT/MATERIALS
DELIVERED TO
SITE
1 Ceramic tiles for 413
sample unit B1 cartoons
finishes
2 Wall hang cistern no 4 cartoons
wc/fittings

WORKS: dates
MATERIALS
TESTED OR
COMMISSIONED
1 4th floor concrete 23/3/17
slab grid o to eb----2 24/3/17
days

CLERK
PREPARED BY
OFWORKS
:-----zachariah

SIGN:-----

DATE:-----28/3/2017