Академический Документы
Профессиональный Документы
Культура Документы
200
and may not be reproduced without licence.
10,550
10,550 2. All dimensions are in mm and should be checked on site. Written dimensions rule
400
over scaled dimensions. Any discrepancies to be reported to the architect before
2,000 3,200 1,500 1,600 1,600 650 any work commences.
J J 3. All construction work to comply with the latest K.B.S standard code of practice ,
1,000
Beam A Y
18Y8-02-150 Local Authority by-laws and fire regulations.
J J
1,000
1,000
H H 4. P.V. denotes permanent ventilation and must be provided above all doors and
Beam B Beam A windows where shown.
H H
7Y8-02-200B2
4Y12-05
2,200
5. All walls should be reinforced with hoop iron at every alternate course.
2,200
2,200
2100
Y8(02)
6. Water meter to be located 300mm above ground level.
C1 C1
Beam B G G SECTION C1-C1 7. D.P.C. denotes one layer of bituminous felt to be provided under all walls and
1,200
18Y8-05-200T2
G G should be 150mm above GL.
Beam A
Beam B
Beam B
1,200
1,200
17Y8-01-200B2
25Y8-04-200B1
8. All structural work to Structural Engineer's Details
F F
F F 9. Heavy duty polythene sheeting and anti-termite treatment to be provided under
1,690
X X ground floor slab.
1,690
1,690
11,800
First Floor
10.All surface beds to be cast on well compacted filling.
11,800
11,800
150
Beam A E E
7Y8-03-200T2
450
510
E E 900 11.All pipes and services to be minimum 450mm below reduced GL.
Beam A
510
510
5Y10-01-200B2
Beam A D D
D D
1,000
1,000
1,000
12.All inspection chambers within building area and parking areas to have heavy
Beam B 4Y12-03 duty double seal airtight covers.Drains under building,driveway,parking to be
B1
C C PVC pipes encased in 150mm concrete surround.
900
C C B1
18Y8-05-200T2 Y8-02-150
Beam B
5Y10-01-200B1
Beam A
Beam B
2,600
2,600
2,600
BASE B1 ON PLAN
2700
11 No.)
4Y12-04
Beam B
B B B B 17Y8-02-150
1,600
1,600
1,600
Y8(02)
Y 4Y12-04
Beam A C1 C1
SECTION C1-C1
A A
Determined at site
2,000 3,200 1,500 1,600 1,600 650 A A
75mm Kicker 150mm thick ground
2,000 3,200 1,500 1,600 1,600 650 floor slab
Ground Floor
10,550 10,550
50mm thick murram
5Y10(01)B2
Y8 Y8 VRC concrete class 20
600
5Y10(01)B1
75
100
1 2 3 4 5 6 7 2,200 4,400 2,600 900 blinding concrete
(1:4:8)
SECTION B1-B1.
SECTION Y-Y THROUGH SLAB (Scale 1:15)
(SCALE 1 : 20)
Y8 Y8 Y8
3B 3A
10,550 Y8 Y8
2Y16-14 2Y12-13
1,000
2,200
1 2 3 4 5 6 7
Beam A 10,550
G G 3,400 3,200 2,600
1,200
1,200
F F Y8(06) Y8(06)
J J
Beam A
Beam A
1,690
1,690
2Y16-12 2Y16-12
B1 B1
H H
11,800
11,800
510
1,000
(4 NO.)
Beam A G
B1 B1
G
C C Y
Y8-200c/c
Beam A
F F 2Y12 Y8-200c/c
Y8-200c/c
2,600
2,600
X X
R8 RINGS 200c/c 2Y12
11,800
Beam A
B B D D Y-8 200c/c B
600
1,600
10,550 B B
Project Title
1,000
x
900
B1
1 2 3 4 5 6 7 A A
PROPOSED RESIDENTIAL HOUSE
600
900
2,000 3,200 1,500 1,600 1,600 650 7Y12-03-200T1
10,550
BEAMS AND COLUMNSLAYOUT FIRST FLOOR 4Y10-04-200T2
(SCALE 1:25)
1 2 3 4 5 6 7
Client
FOUNDATION LAYOUT
SCALE 1:25
4Y10-04-200T2
50 To be determined at site 150
150 mm thick concrete bed 50 To be determined at site 150 7Y12-01 7Y12-01 7Y12-03-200T1
500g PVC as DPM on 50mm thick murram blinding
7Y12-03-200T1
15Y10-02
15Y10-02
250mm thick hardcore well compacted in 50mm layers
4Y10-04-200T2
4Y10
7Y10-05-200B2
200 mm thick natural stone wall bedded in cement mortar 1:3 ( 04)
7Y12-06-200T1
15Y10-02-200B2
7Y12-01-200B1
Sign:..............................................Date :....................
7Y12-05
150mm thick ground floor slab( 1:2:4
on 50mm thick murram blinding on
Drawing Title
250mm thick well compacted hardcore.
STRUCTURAL DRAWINGS
250
250