SCHEDULE 1 Base Price

MUARA KARANG PEAKER GAS


METER PROJECT

MTO
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

A. Metering Shelter
! - PONDASI BORE PILE DIA 40 CM, KEDALAMAN 8 M
Pengeboran dia 40 cm, kedalaman 8 m 112.00 m
Cor Beton K-350 14.07 m3
Pembesian D16 Ulir 1,415.68 kg
Pembesian 10 Polos 1,055.04 kg
Kawat Ikat 100.00 kg

2 - PILE CAP & FOOTING


Galian Pondasi 21.84 m3
Beton K-125 Lantai kerja Pilecap 0.84 m3
Beton K350 Pile Cap 17.75 m3
Pembesian D19 Ulir 437.08 kg
Pembesian D16 Ulir 1,327.20 kg
Kawat Ikat 100.00 kg
Bekisting Plywood 12 mm 10.00 lb
Kayu 3x3 0.50 m3

Gas Pipeline Development for


Sch 1.1 - 1
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

paku 3" 50.00 kg

3 - SLOOF
Galian Tanah 13.20 m3
Lantai Kerja beton K-125 0.84 m3
Beton K-350 13.20 m3
Pembesian 13 Ulir 349.44 kg
Pembesian 10 Polos 207.31 kg
Kawat Ikat 50.00 kg
Plywood 12 mmm 15.00 lb
Kayu 3x3 1.00 m3
Paku 100.00 kg

4 - FLOOR
Pembesian 2 lapis dia 10 529.36 kg
Lean concrete K-125 15.20 m3
beton K300 45.60 m3

4 - ANCHOR BOLT
Anchor bolt M16 56.00 ea

5 - GROUTING

Gas Pipeline Development for


Sch 1.1 - 2
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

Grouting Non Shrink 10.00 zak

6 - PEK. SALURAN
Galian Tanah 76.00 m3
U Ditch dia 30 cm 92.00 m

7 - FENCE BRC
Concrete Pondasi Fence NRC K-250 5.00 m3
Fence BRC 114.00 m
Pintu BRC 1.00 ea

8 STEEL STRUCTURE

- Kolom & beam


H 250 x 250 x 9 x 14 4,029.76 kg
WF 400 x 200 x 8 x 13 5,499.48 kg

- Hoist Rail
WF 400 x 200 x 8 x 13 2,487.86 kg

- Roof
WF 200 x 100 x 5.5 x 8 1,321.74 kg
C 150 x 65 x 20 x 3.2 3,474.72 kg

Gas Pipeline Development for


Sch 1.1 - 3
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

Sagrod 22 200.00 kg
Tirod 12 100.00 kg
Corrugated roof zinc allume t=0.45 mm 342.00 m2

-Wall
Wall Claddingzincallume t=0.45 mm 1,184.00 m2

-Connection
Plate 16 200.00 kg

9 SKID

WF 300 x 150 x 6.5 x 9 4,129.08 kg


pipe support pipe H 100x100x6x8, tinggi 0,5 m 262.73 kg
baseplate t=12 mm 150 x 150 31.79 kg
Dynabolt M-16 120.00 ea
lifting lug 100.00 kg
U bolt 20 mm 26.25 kg

10 Pipa Downspot & Talang Air


Pipa 4 " 20.00 m
Talang Air 92.00 m
Klem Pipa 4" 8.00 ea

Gas Pipeline Development for


Sch 1.1 - 4
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

B. MODIFICATION PIPE SUPPORT ( 15 EA )


1 - PILE CAP & FOOTING
Lean Concrete K-125 0.60 m3
Concrete K-350 18.75 m3
Pembesian D13 2,700.00 kg
Pembesian 10 Polos 210.00 kg
Grouting Non-Shrink 5.00 zak

2 - STEEL STRUCTURE
Column H 100x100x6x8 1,017.00 kg
Beam H 100x100x6x8 203.40 kg
U bolt 20 mm 37.50 kg
baseplate 250x250x16 235.50 kg

3 - PAINTING
Primer Coat 4.00 pile (20 l)
Intermediate Coat 4.00 pile (20 l)
Top Coat 4.00 pile (20 l)

4 ANCHORBOLT
Anchorbolt M-16 120.00 ea

Gas Pipeline Development for


Sch 1.1 - 5
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

C. NEW PIPE SUPPORT ( 4EA )


1 - PILE CAP & FOOTING
Lean Concrete K-125 0.16 m3
Concrete K-300 5.00 m3
Pembesian D13 720.00 kg
Pembesian 10 Polos 56.00 kg
Grouting Non-Shrink 2.00 zak

2 - STEEL STRUCTURE
Column H 100x100x6x8 271.20 kg
Beam H 100x100x6x8 54.24 kg
U bolt 20 mm 10.00 kg
baseplate 250x250x16 62.80 kg

3 - PAINTING
Primer Coat 1.00 pile (20 l)
Intermediate Coat 1.00 pile (20 l)
Top Coat 1.00 pile (20 l)

4 ANCHORBOLT
Anchorbolt M-16 32.00 ea

Gas Pipeline Development for


Sch 1.1 - 6
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

D. FLOW COM BUILDING

1 - FOOTING
Lean Concrete 0.11 m3
Beton K-300 1.20 m3
Pembesian D13 49.36 kg
Pembesian 10 29.62 kg
Kawat ikat 25.00 kg
Cat lantai epoxy 216.00 m2

2 SLOOF
Lean Concrete 0.11 m3
Beton K-300 0.96 m3
Pembesian D13 89.87 kg
Pembesian 10 82.27 kg
Kawat ikat 50.00 kg

3 FLOOR
Lean Concrete 0.80 m3
Beton K-300 2.40 m3
Pembesian 10 106.67 kg
Kawat ikat 25.00 kg

Gas Pipeline Development for


Sch 1.1 - 7
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

4 TRENCH
Lean Concrete 0.12 m3
Beton K-300 0.75 m3
Pembesian 10 41.13 kg
Kawat ikat 10.00 kg

5 KOLOM
Beton K-300 0.72 m3
Pembesian D13 133.12 kg
Pembesian 10 131.63 kg
Kawat ikat 50.00 kg

6 ROOF
Beton K-300 7.36 m3
Pembesian D13 133.12 kg
Pembesian 10 320.00 kg
Kawat ikat 50.00 kg

7 DINDING
Pasangan batu bata 64.00 m2
Painting dulux 128.00 m2

Gas Pipeline Development for


Sch 1.1 - 8
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

8 SALURAN U DITCH
saluran u ditch D30 cm 20.00 m
pasangan bata merah 40.00 m

9 Plat Penutup
Plat penutup trench 2.00 m2

E AIR COMPRESSOR SHELTER & AIR RECEIVER FOUNDATION

1 - PONDASI BORE PILE DIA 40 CM, KEDALAMAN 8 M


Pengeboran dia 40 cm, kedalaman 8 m 80.00 m
Cor Beton K-350 10.05 m3
Pembesian D16 Ulir 1,011.20 kg
Pembesian 10 Polos 753.60 kg
Kawat Ikat 100.00 kg

2 - FOOTING
Galian Pondasi 9.00 m3
Beton K-125 Lantai kerja Pilecap 0.68 m3
Beton K350 Pile Cap 5.49 m3
Pembesian D19 Ulir 720.00 kg
Pembesian Dia 10 polos 60.00 kg
Kawat Ikat 25.00 kg

Gas Pipeline Development for


Sch 1.1 - 9
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

Bekisting Plywood 12 mm 10.00 lb


Kayu 3x3 2.00 m3
paku 3" 25.00 kg

3 - SLOOF
Galian Tanah 2.28 m3
Lantai Kerja beton K-125 0.38 m3
Beton K-350 2.28 m3
Pembesian 13 Ulir 158.08 kg
Pembesian 10 Polos 234.46 kg
Kawat Ikat 50.00 kg
Plywood 12 mmm 10.00 lb
Kayu 3x3 1.00 m3
Paku 25.00 kg

4 - FLOOR
Wiremesh M8-150 60.00 m2
Lean concrete K-125 3.00 m3
beton K300 18.00 m3

5 - AIR RECEIVER FOUNDATION


Concrete K-350 8.55 m3
Pembesian D-16 73.60 kg

Gas Pipeline Development for


Sch 1.1 - 10
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

6 - ANCHOR BOLT
Anchor bolt M16 16.00 ea
Anchorbolt M20 24.00 ea

7 - GROUTING
Grouting Non Shrink 20.00 zak

8 - PEK. SALURAN
Galian Tanah 12.50 m3
U Ditch dia 30 cm 50.00 m

9 STEEL STRUCTURE

- Kolom & beam


H 125 x 125 x 6.5 x 9 221.04 kg
WF 200 x 100 x 4.5 x 7 178.00 kg

- Roof
Rafter WF 200 x 100 x 4.5 x 7 331.08 kg
Rafter WF 150 x 75 x 5 x 7 461.68 kg
Purlin C 100 x 50 x 20 x 2 206.50 kg

Gas Pipeline Development for


Sch 1.1 - 11
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery
No Volume Unit
to site , unloading, storing and handling at site complete erection.

Sagrod 10 kg
Tirod 16 kg
Corrugated roof zinc allume t=0.45 mm 75.60 m2

-Wall
Wall Cladding zincallume t=0.45 mm 44.00 m2

-Connection
Plate 16 100.00 kg

10 Pipa Downspot & Talang Air


Pipa 4 " 24.00 m
Talang Air 31.60 m
Klem Pipa 4" 8.00 ea

TOTAL

Gas Pipeline Development for


Sch 1.1 - 12
CCPP Tanjung Batu Kaltimra Project
PART 5 Bid Forms
SCHEDULE 1 Base Price

MUARA KARANG PEAKER GAS


METER PROJECT

MTO
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
A. Metering Shelter
! - PONDASI BORE PILE DIA 40 CM, KEDALAMAN 8 M
Pengeboran dia 40 cm, kedalaman 8 m 112.00 m
Cor Beton K-350 14.07 m3
Pembesian D16 Ulir 1,415.68 kg
Pembesian 10 Polos 1,055.04 kg
Kawat Ikat 100.00 kg

2 - PILE CAP & FOOTING


Galian Pondasi 21.84 m3
Beton K-125 Lantai kerja Pilecap 0.84 m3
Beton K350 Pile Cap 17.75 m3
Pembesian D19 Ulir 437.08 kg
Pembesian D16 Ulir 1,327.20 kg
Kawat Ikat 100.00 kg
Bekisting Plywood 12 mm 10.00 lb
Kayu 3x3 0.50 m3

Gas Pipeline Development for


Sch 1.1 - 13
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
paku 3" 50.00 kg

3 - SLOOF
Galian Tanah 13.20 m3
Lantai Kerja beton K-125 0.84 m3
Beton K-350 13.20 m3
Pembesian 13 Ulir 349.44 kg
Pembesian 10 Polos 207.31 kg
Kawat Ikat 50.00 kg
Plywood 12 mmm 15.00 lb
Kayu 3x3 1.00 m3
Paku 100.00 kg

4 - FLOOR
Pembesian 2 lapis dia 10 529.36 kg
Lean concrete K-125 15.20 m3
beton K300 45.60 m3

4 - ANCHOR BOLT
Anchor bolt M16 56.00 ea

5 - GROUTING

Gas Pipeline Development for


Sch 1.1 - 14
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
Grouting Non Shrink 10.00 zak

6 - PEK. SALURAN
Galian Tanah 76.00 m3
U Ditch dia 30 cm 92.00 m

7 - FENCE BRC
Concrete Pondasi Fence NRC K-250 5.00 m3
Fence BRC 114.00 m
Pintu BRC 1.00 ea

8 STEEL STRUCTURE

- Kolom & beam


H 250 x 250 x 9 x 14 4,029.76 kg
WF 400 x 200 x 8 x 13 5,499.48 kg

- Hoist Rail
WF 400 x 200 x 8 x 13 2,487.86 kg

- Roof
WF 200 x 100 x 5.5 x 8 1,321.74 kg
C 150 x 65 x 20 x 3.2 3,474.72 kg

Gas Pipeline Development for


Sch 1.1 - 15
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
Sagrod 22 200.00 kg
Tirod 12 100.00 kg
Corrugated roof zinc allume t=0.45 mm 342.00 m2

-Wall
Wall Claddingzincallume t=0.45 mm 1,184.00 m2

-Connection
Plate 16 200.00 kg

9 SKID

WF 300 x 150 x 6.5 x 9 4,129.08 kg


pipe support pipe H 100x100x6x8, tinggi 0,5 m 262.73 kg
baseplate t=12 mm 150 x 150 31.79 kg
Dynabolt M-16 120.00 ea
lifting lug 100.00 kg
U bolt 20 mm 26.25 kg

10 Pipa Downspot & Talang Air


Pipa 4 " 20.00 m
Talang Air 92.00 m
Klem Pipa 4" 8.00 ea

Gas Pipeline Development for


Sch 1.1 - 16
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR

B. MODIFICATION PIPE SUPPORT ( 15 EA )


1 - PILE CAP & FOOTING
Lean Concrete K-125 0.60 m3
Concrete K-350 18.75 m3
Pembesian D13 2,700.00 kg
Pembesian 10 Polos 210.00 kg
Grouting Non-Shrink 5.00 zak

2 - STEEL STRUCTURE
Column H 100x100x6x8 1,017.00 kg
Beam H 100x100x6x8 203.40 kg
U bolt 20 mm 37.50 kg
baseplate 250x250x16 235.50 kg

3 - PAINTING
Primer Coat 4.00 pile (20 l)
Intermediate Coat 4.00 pile (20 l)
Top Coat 4.00 pile (20 l)

4 ANCHORBOLT
Anchorbolt M-16 120.00 ea

Gas Pipeline Development for


Sch 1.1 - 17
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR

C. NEW PIPE SUPPORT ( 4EA )


1 - PILE CAP & FOOTING
Lean Concrete K-125 0.16 m3
Concrete K-300 5.00 m3
Pembesian D13 720.00 kg
Pembesian 10 Polos 56.00 kg
Grouting Non-Shrink 2.00 zak

2 - STEEL STRUCTURE
Column H 100x100x6x8 271.20 kg
Beam H 100x100x6x8 54.24 kg
U bolt 20 mm 10.00 kg
baseplate 250x250x16 62.80 kg

3 - PAINTING
Primer Coat 1.00 pile (20 l)
Intermediate Coat 1.00 pile (20 l)
Top Coat 1.00 pile (20 l)

4 ANCHORBOLT
Anchorbolt M-16 32.00 ea

Gas Pipeline Development for


Sch 1.1 - 18
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
D. FLOW COM BUILDING

1 - FOOTING
Lean Concrete 0.11 m3
Beton K-300 1.20 m3
Pembesian D13 49.36 kg
Pembesian 10 29.62 kg
Kawat ikat 25.00 kg
Cat lantai epoxy 216.00 m2

2 SLOOF
Lean Concrete 0.11 m3
Beton K-300 0.96 m3
Pembesian D13 89.87 kg
Pembesian 10 82.27 kg
Kawat ikat 50.00 kg

3 FLOOR
Lean Concrete 0.80 m3
Beton K-300 2.40 m3
Pembesian 10 106.67 kg
Kawat ikat 25.00 kg

Gas Pipeline Development for


Sch 1.1 - 19
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
4 TRENCH
Lean Concrete 0.12 m3
Beton K-300 0.75 m3
Pembesian 10 41.13 kg
Kawat ikat 10.00 kg

5 KOLOM
Beton K-300 0.72 m3
Pembesian D13 133.12 kg
Pembesian 10 131.63 kg
Kawat ikat 50.00 kg

6 ROOF
Beton K-300 7.36 m3
Pembesian D13 133.12 kg
Pembesian 10 320.00 kg
Kawat ikat 50.00 kg

7 DINDING
Pasangan batu bata 64.00 m2
Painting dulux 128.00 m2

Gas Pipeline Development for


Sch 1.1 - 20
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
8 SALURAN U DITCH
saluran u ditch D30 cm 20.00 m
pasangan bata merah 40.00 m

9 Plat Penutup
Plat penutup trench 2.00 m2

E AIR COMPRESSOR SHELTER & AIR RECEIVER FOUNDATION

1 - PONDASI BORE PILE DIA 40 CM, KEDALAMAN 8 M


Pengeboran dia 40 cm, kedalaman 8 m 80.00 m
Cor Beton K-350 10.05 m3
Pembesian D16 Ulir 1,011.20 kg
Pembesian 10 Polos 753.60 kg
Kawat Ikat 100.00 kg

2 - FOOTING
Galian Pondasi 9.00 m3
Beton K-125 Lantai kerja Pilecap 0.68 m3
Beton K350 Pile Cap 5.49 m3
Pembesian D19 Ulir 720.00 kg
Pembesian Dia 10 polos 60.00 kg
Kawat Ikat 25.00 kg

Gas Pipeline Development for


Sch 1.1 - 21
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
Bekisting Plywood 12 mm 10.00 lb
Kayu 3x3 2.00 m3
paku 3" 25.00 kg

3 - SLOOF
Galian Tanah 2.28 m3
Lantai Kerja beton K-125 0.38 m3
Beton K-350 2.28 m3
Pembesian 13 Ulir 158.08 kg
Pembesian 10 Polos 234.46 kg
Kawat Ikat 50.00 kg
Plywood 12 mmm 10.00 lb
Kayu 3x3 1.00 m3
Paku 25.00 kg

4 - FLOOR
Wiremesh M8-150 60.00 m2
Lean concrete K-125 3.00 m3
beton K300 18.00 m3

5 - AIR RECEIVER FOUNDATION


Concrete K-350 8.55 m3
Pembesian D-16 73.60 kg

Gas Pipeline Development for


Sch 1.1 - 22
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR

6 - ANCHOR BOLT
Anchor bolt M16 16.00 ea
Anchorbolt M20 24.00 ea

7 - GROUTING
Grouting Non Shrink 20.00 zak

8 - PEK. SALURAN
Galian Tanah 12.50 m3
U Ditch dia 30 cm 50.00 m

9 STEEL STRUCTURE

- Kolom & beam


H 125 x 125 x 6.5 x 9 221.04 kg
WF 200 x 100 x 4.5 x 7 178.00 kg

- Roof
Rafter WF 200 x 100 x 4.5 x 7 331.08 kg
Rafter WF 150 x 75 x 5 x 7 461.68 kg
Purlin C 100 x 50 x 20 x 2 206.50 kg

Gas Pipeline Development for


Sch 1.1 - 23
CCPP Tanjung Batu Kaltimra Project
METER PROJECT

MTO PART 5 Bid Forms


SCHEDULE 1 Base Price
OF CIVIL

Description
The work consists of design, inspection, insurance , delivery UNIT PRICE
No Volume Unit
to site , unloading, storing and handling at site complete erection.

IDR
Sagrod 10 kg
Tirod 16 kg
Corrugated roof zinc allume t=0.45 mm 75.60 m2

-Wall
Wall Cladding zincallume t=0.45 mm 44.00 m2

-Connection
Plate 16 100.00 kg

10 Pipa Downspot & Talang Air


Pipa 4 " 24.00 m
Talang Air 31.60 m
Klem Pipa 4" 8.00 ea

TOTAL

Gas Pipeline Development for


Sch 1.1 - 24
CCPP Tanjung Batu Kaltimra Project
Concrete Fence

Footing
p = 0.2 p = 327
l = 0.2 l = 0.15
t = 0.45 t = 0.2
n = 110 n = 1

V = 1.98 V = 9.81

Warning Sign & Marker

Footing
p = 0.5 p = 1.2
l = 0.5 l = 0.2
t = 0.2 t = 0.2
n = 56 n = 56

V = 2.8 V = 2.688

Footing
p = 0.4 p = 1.2
l = 0.4 l = 0.2
t = 0.025 t = 0.2
n = 6 n = 56

V = 0.024 V = 2.688