Вы находитесь на странице: 1из 4

Project: SAMPLE PROJECT Page of

Subject: FOOTING F5.0 Updated on 5/5/2006

Client: Design: Date: 05/14/17

Addres: Checked: Date:


'file:///var/www/apps/conversion/tmp/scratch_3/354862313.xls'#$Spread

Allow. Soil Pressure= 2.00 Ksf

LOAD ANALYSIS Dead Load Live Load Net Uplift(Wind)


Pa (Max.)= 5.75 K 3.30 K 4.00 K
Pa (Min.)= 2.75 K
Ppier 1.33 x 1.33 x 1.33 x 0.15 = 0.35 K
Psoil 23.23 x 1.33 x 0.12 = 3.72 K
P ftg= 5.00 x 5.00 x 1.00 x 0.15 = 3.75 K
Total Pa (Max.)= 13.57 K 3.30 K 4.00 K Total Ps (Service)= 20.87 k
Total Pa (Min.)= 10.57 K
V(Service)= 2.00 k Total V (service) = 2.00 k

M(due to VDL) 0.00 x 3.66 = 0.00


M(due to VLL) 0.00 x 3.66 = 0.00
M(due to VWL) 2.00 x 3.66 = 7.33
Additional M(Service)=
Total Moment(Service)= 0.00 K-Ft 0.00 K-Ft 7.33 K-Ft Total M s(Service)= 7.33 K-Ft

STABILITY CHECK CASE 1

Total Uplift: 4.00 K 20.87 K


0.6 W = 6.34 K 7.33 K-Ft

SF= Pg / Pu = 6.34 K / 4.00 K = 1.6 > 1.5 OK, No Uplift 2.00 K


3.66

e=Ms/Ps= 7.33 / 20.87 = 0.35 Ft <d/6, Case 1 BAR SIZE


where,d/6= 0.83 Ft q2 0.74 Ksf =q 3
0.48 Ksf q1
SOIL PRESSURE DISTRIBUTION ( CASE I ) Due to DL LL & WL Total
q 1= (P/BL )*( 1 +6e/L) = 0.77 Ksf 0.42 Ksf 1.19 Ksf OK, <1.25xAllow. Soil Pre e P 1.19 Ksf
q 2= (P/BL )*( 1 -6e/L) = 0.31 Ksf 0.17 Ksf 0.48 Ksf OK,No Tension
q3 ( At column edge)= 0.48 Ksf 0.26 Ksf 0.74 Ksf
L= 5.00
0 0.00 0.00 Ft

fc'= 3.0 Ksi


fy= 60.0 Ksi CASE 2
SHORT WAY LONG WAY
Ms(DL)= 5.68 K-Ft 5.68 K-Ft 0.00 K
Ms(LL)= 2.62 K-Ft 2.62 K-Ft
Mu(Short)= 1.2 X 5.68 + 1.6 X 2.62 = 11.01 K-Ft 0.00 K-Ft
Mu(Long)= 1.2 X 5.68 + 1.6 X 2.62 = 11.01 K-Ft 0.00 K
As req'd As min (0.18 %)
In short way 0.28 in2 0 1.30 in2 <--USE
In long way 0.28 in2 0 1.30 in2 <--USE 0.00

USE Bott. 5 #5 in shorter direction


USE Bott. 5 #5 in longer direction
0.00 Ksf 0
Note: USE TOP, In case of net uplift f1

e
P
kd

0.00
Project: SAMPLE FOOTING Page of
Subject: FOOTING F7.0 x 10.0 Updated on 5/5/2006

Client: Design: Date: 05/14/17

Addres: Checked: Date:


'file:///var/www/apps/conversion/tmp/scratch_3/354862313.xls'#$Combined
Allow. Soil Pressure= 2.00 Ksf
Left catilever: Middle Right Cantilever
3.50 Ft 5.50 Ft 1.00 Ft
Dead Load Live Load Wind (Up or Down)
LOAD ANALYSIS P1 = 15.00 K 32.00 K 6.00 K
P2= 6.00 K 13.00 K 4.00 K
Pa (Min.)= 12.00 K
Ppier 1.33 x 1.33 x 1.33 x 0.15 = 0.35 K
Psoil 92.67 x 1.33 x 0.12 = 14.82 K
P ftg= 7.00 x 10.00 x 1.50 x 0.15 = 15.75 K
Total Pa (Max.)= 51.93 K 45.00 K 10.00 K Total Ps (Service)= 89.93 k
Total Pa (Min.)= 42.93 K
H(Service)= Total V (service) = 0.00 k

M(due to VDL) 0.00 x 4.16 = 0.00


M(due to VLL) 0.00 x 4.16 = 0.00
M(due to VWL) 0.00 x 4.16 = 0.00
Additional M(Service)=
Total Moment(Service)= 0.00 K-Ft 0.00 K-Ft 0.00 K-Ft Total M s(Service)= 0.00 K-Ft

STABILITY CHECK CASE 1

Total Uplift: 10.00 K 47.00 K 19.00


0.6 x W 25.76 K
0.00 K 0.00 K-Ft
SF= Pg / Pu = 25.76 K / 10.00 K = 2.6 > 1.5
OK, No Uplift 4.16
Resultant Force= 66.00 k
e of Resultant= 0.08 Ft 3.50 Ft 5.50 Ft 1.00 Ft
Moment of Resultant: 66.00 k x0.08 = 5.50 K-Ft
e=Ms/Ps= 5.50 / 89.93 = 0.06 Ft <d/6, Case 1
where,d/6= 1.67 Ft q2 1.28 Ksf =q 3
1.24 Ksf q1
SOIL PRESSURE DISTRIBUTION ( CASE I ) Due to DL LL & WL Total
q 1= (P/BL )*( 1 +6e/L) = 0.77 Ksf 0.56 Ksf 1.33 Ksf OK e P 1.33 Ksf
q 2= (P/BL )*( 1 -6e/L) = 0.71 Ksf 0.52 Ksf 1.24 Ksf OK,No Tension
q3 ( At column edge)= 0.74 Ksf 0.54 Ksf 1.28 Ksf
L= 10.00

fc'=
3.0 Ksi fy= 60.0 Ksi
SHORT WAY LONG WAY
Ms(DL)= 30.47 K-Ft 49.87 K-Ft CASE 2
Ms(LL)= 21.98 K-Ft 35.98 K-Ft
Ms(DL)@top= 2.24 K-Ft 47.00 K 19.00 K
Ms(LL)@top= 1.87 K-Ft
Mu(Short)= 1.2 X 30.47 + 1.6 X 21.98 = 71.73 K-Ft 0.00 K 0.00 K-Ft
Mu(Long)= 1.2 X 49.87 + 1.6 X 35.98 = 117.41 K-Ft
Mu(Long)@ top 1.2 X 2.24 + 1.6 X 1.87 = 5.69 K-Ft
0.00
3.50 Ft 5.50 Ft 1.00 Ft
As req'd As min (0.18 %)
In short way 1.15 in2 0 3.89 in2 <--USE
In long way 2.00 in2 0 2.72 in2 <--USE 0.00 Ksf 0
In long way 0.08 in2 0 2.72 in2 <--USE f1
USE Bott. 9 #6 in shorter direction
USE Bott. 6 #6 in longer direction e
USE Top. 6 #6 in longer direction P
kd
kd
0.00