MONTLY CHECK TOOLS KIT MEKANIK

PT. UNITED TRACTORS


CABANG : MANADO
MEKANIK :
NRP :

NO DESCRIPTION Check NO DESCRIPTION Check


1 Adapter, Injec torq Wrench 51 Ring Spanner 6 X 7 mm V
2 Adjustable Wrench 12' V 52 Ring Spanner 8 X 9 mm V
3 Allen Key, 2 - 10 mm V 53 Ring Spanner 10 X 11 mm X
4 Allen Key, 12 mm V 54 Ring Spanner 12 X 13 mm X
5 Allen Key, 14 mm V 55 Ring Spanner 14 X 15 mm V
6 Bar 2 pcs V 56 Ring Spanner 16 X 17 mm V
7 Calliper 6', Vernier V 57 Ring Spanner 18 X 19 mm X
8 Cartridge Wrench V 58 Ring Spanner 20 X 22 mm V
9 Center Punch V 59 Ring Spanner 24 X 26 mm V
10 Chisel Flate V 60 Scrapper 2' V
11 Combination Wrench, 1/2' V 61 Screw Driver 75 mm ( + ) V
12 Combination Wrench, 27 mm V 62 Screw Driver 75 mm ( - ) V
13 Combination Wrench, 30 mm V 63 Screw Driver 100 mm ( + ) V
14 Combination Wrench, 32 mm V 64 Screw Driver 100 mm ( - ) V
15 Combination Wrench, 36 mm 65 Screw Driver 150 mm ( + ) V
16 Drift Punch V 66 Screw Driver 150 mm ( - ) V
17 Extention 1/2 X 5' V 67 Screw Driver 200 mm ( + ) V
18 Extention 1/2 X 10' V 68 Screw Driver 200 mm ( - ) V
19 Extention 3/4 X 8' V 69 Screw Picth Gauge V
20 Extention 3/4 X 16' V 70 Socket 1/2 ' dr , 10 mm V
21 Feeler Gauge 0.05 - 1 mm V 71 Socket 1/2 ' dr , 11 mm V
22 File Set 6 pcs V 72 Socket 1/2 ' dr , 12 mm V
23 File Flate V 73 Socket 1/2 ' dr , 13 mm V
24 File Round V 74 Socket 1/2 ' dr , 14 mm V
25 Haksaw Frame set V 75 Socket 1/2 ' dr , 15 mm V
26 Half Moon Wrench 14 X 17 mm V 76 Socket 1/2 ' dr , 16 mm V
27 Half Moon Wrench 19 X 22 mm V 77 Socket 1/2 ' dr , 17 mm V
28 Hammer Besi V 78 Socket 1/2 ' dr , 18 mm V
29 Hammer Karet V 79 Socket 1/2 ' dr , 19 mm V
30 Hammer Plastik R 80 Socket 1/2 ' dr , 20 mm V
31 Handle, T Sliding 1/2' dr V 81 Socket 1/2 ' dr , 21 mm V
32 Handle, T Sliding 3/4' dr V 82 Socket 1/2 ' dr , 22 mm V
33 Magneet Tool V 83 Socket 1/2 ' dr , 1/2 Long
34 Open End 6 X 7 mm V 84 Socket 3/4 ' dr , 22 mm V
35 Open End 8 X 9 mm V 85 Socket 3/4 ' dr , 23 mm V
36 Open End 10 X 11 mm V 86 Socket 3/4 ' dr , 24 mm V
37 Open End 12 X 13 mm V 87 Socket 3/4 ' dr , 27 mm V
38 Open End 14 X 15 mm X 88 Socket 3/4 ' dr , 28 mm V
39 Open End 16 X 17 mm V 89 Socket 3/4 ' dr , 29 mm V
40 Open End 18 X 19 mm V 90 Socket 3/4 ' dr , 30 mm V
41 Open End 20 X 22 mm V 91 Socket 3/4 ' dr , 32 mm V
42 Open End 24 X 26 mm V 92 Socket 3/4 ' dr , 36 mm V
43 Plier Combination V 93 Socket 3/4 ' dr , 38 mm
44 Plier Round Long Nose V 94 Socket 3/4 ' dr , 41 mm
45 Plier Side Cutting V 95 Socket 3/4 ' dr , 46 mm
46 Plier Snapring External V 96 Socket 3/4 ' dr , 1 5/16
47 Plier Snapring Internal V 97 Steel Brush V
48 Plier Vice Grip V 98 Tespen 12 Volt V
49 Plier Waterpump V 99 Tool Box & Key V
50 Ratchet 1/2' dr V 100 U- Joint 1/2' dr V
Pemeriksaan Tgl Dicheck Oleh
Keterangan SDH MEKANIK TOOL KEEPER

DWI NUR RIYAWAN KHARSIMAN


NOTE V = ADA & BAIK : X = HILANG : R = RUSAK :
RECONDITIONING BERITA ACARA T.E. 36
DEPARTMENT

Kehilangan / Kerusakan barang milik PT. United TractorsTbk dan penyelesaiannya


No. :

Pada hari ini, Rabu tanggal, 01 Agustus 2007 kami yang bertanda tangan
dibawah ini :
Nama : Hadriansyah
Jabatan : Mekanik

Menyatakan bahwa telah merusakkan / menghilangkan * barang-barang milik perusahaan


berupa :
No Nama Barang Part/Code No Merk Ukuran Qty Keterangan
1 Hammer Plastik 1
2 Open End Wrench Schaliper 14 x 15 1
3 Ring Spanner Schaliper 10 x 11 1
4 Ring Spanner Schaliper 12 x 13 1
5 Ring Spanner Schaliper 18 x 19 1

Kerusakan/kehilangan * tersebut terjadi pada waktu kami melaksanakan pekerjaan Full


Maintenance Contrac bulan Agustus 2006 di Gosowong Customer PT.Prima Traktor
Indonusa bersama-sama dengan sdr Sugeng Riyadi Sesuai JO/WO No. __________

Sebab-sebab kerusakan/kehilangan tersebut adalah : ___________________________


____________________________________________________________________
____________________________________________________________________

Kerusakan/kehilangan * barang tersebut diselesaikan sebagai berikut :


No. Nama Barang Qty Harga Satuan Qty Keterangan
1 Hammer Plastik
2 Open End Wrench
3 Ring Spanner
4 Ring Spanner
5 Ring Spanner

1. Menjadi beban perusahaan seluruhnya / sebagian * sebesar Rp. __________________


2. Menjadi beban saudara : mengganti dengan barang yang sama atau membayar sebesar
Rp. _______________ yang akan diperhitungkan dengan gaji selama ______ bulan,
mulai bulan ________________.

Penggantian barang - barang akan dilaksanakan oleh Cabang / HO Service paling lambat
tanggal _________________.

Dilaporkan Diketahui Diputuskan Disetujui

Hadriansyah Karsiman Dwi Nur R Susiyanto


Mekanik Tolls Keeper Service Dept.Head Branch Manager