Вы находитесь на странице: 1из 1

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

0 1 2

CONSTRUCTION DWG;
A A

B B

A B C D E F G

2310 7900 7900 7900 7900 2885

C1 C1 C1 C1 C1 C1 C1

450
FB4 FB1 DEVELOPER
C 1 C

S1
FB3

FB3

FB2

FB3
4070

C1
D C1 FB4 C1 FB1 C1 C1 C1 C1 D
2

S1 S1 PROJECT
HLAINE TET HOTEL
PROPOSED 8-1/2 STOREY BUILDING
650 If we cast 650mm cantilever slab to cover M&E
6596

FB5 FB5 AT KYAIK WINE PAGODA ROAD


FB2

E E
FB2

FB2

FB3
YANGON, MYANMAR
P1 FB4 P1 shaft, is it enough for your wall design?? any wall
BLOCK NO. NO.17
330 S1
C2
idea/design developement? LOT NO. 18/B
C1 C1
C2 TOWNSHIP MAYANGONE TOWNSHIP
FB4 C2 FB1 P1 C1 C1
3 DRAWING DESCRIPTION
F F
330
S1 MF Framing Plan
4070

P1 P1
FB3

FB2

FB3

C1 C1 C2 C1 C1 C1
FB1 P1
4
450

G G
1/80

20170113 S2-02-A
R0
L.S.

H H

S.E.C.
I I

J J
L.C.

K
Column Schedule Beam Schedule Slab Schedule Wall Schedule K

Mark No. Dimension Mark No. Dimension Mark No. Thickness Mark No. Thickness
OWNER
C1,C2 360x360X18 (A572) FB1 H 400x200x6x12 (A36) S1 140 (Deck Slab)
P1 Tube 150x150x5 (A36) FB2 H 350x175x7x11 (A36)
FB3 H 300x150x6x8 (A36)
L L
FB4 H 250x125x6x9 (A36)
FB5 H 200x100x5.5x8 (A36)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Вам также может понравиться