Академический Документы
Профессиональный Документы
Культура Документы
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart y our computer, and then open the file again. If the red x still
appears, y ou may have to delete the image and then insert it again.
Part ONE
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart y our computer, and then open the file
again. If the red x still appears, you may have to delete the image and then insert it again.
1. Introduction
2
What is Horizontal Directional Coring?
Ground Investigation Technique developed in Norway, in late 80s.
Used in petroleum & mineral explorations and tunnel project. Part ONE
2. Considerations for HDC Planning
Why uses HDC in Tunnel Projects? When & Where should HDC be used?
Confirmed tunnel alignment.
Minimize the risk of unforeseen tunneling
conditions. Preliminary Geological Model.
Extent of problematic rock.
Target the Identified key areas of Geotechnical Hazards / Problematic Ground.
Natural groundwater inflow measurement. Vert. Vert.
BH BH
Continuous core near the tunnel level gives
a lot more information for design and for the
tenderers to price than can be obtained from
vertical boreholes at regular spacing.
HDC launching point can be positioned on
land for core sampling seawards and under
water. Proposed
Tunnel
6 8
Specification of HDC Technique Proposed HDC Trajectory
Max. bending angle: Designer should provide the proposed trajectory to the coring specialists
DV e.g. control points of coordinates & level.
9 deg/30 m (R=180 m).
Max. core-run: Tolerance Envelope
NQ
3 m in deviated section. Smooth launching & curvature to get optimum coring length.
3 or 6 m in straight section.
Core diameter:
DV size (31.5 mm) in deviated
section.
NQ size (47 mm) in straight
section.
Hole diameter:
Typically in N-size (76 mm). As-built alignment of HDC
Proposed trajectory of HDC
Primary steerable coring system was designed Tolerance envelope
for directional coring in competent rock. Steerable Barrel As-built corehole trajectory for recent completed Hong Kong tunnel project
9 11
10 12
Coring Duration What is Geological Model?
Approx. Coring Tolerance Envelope Approx. Coring To anticipate variations in material properties and boundaries in 3D.
Remarks
Length (Dist. from trajectory) Duration (Months)
Coring duration of HDC referring to the recent completed Hong Kong projects
13 15
HD04
HD03
16
HDC passing through inferred Fault Zone HDC passing through Tai Tam Fault
Shear Zones
Causeway Bay
Typhoon Shelter
Granite with Basalt
Causeway Bay Dykes & Microfractured
HD03a Typhoon Shelter within the Tai Tam Fault
Zone
Basalt Dyke up to
HD03 120 m long
17 19
What we found in Tai Tam Fault? GI Data for Geological Model Assessment
Altered & highly
NR chloritized, medium to Vertical & Inclined BH
coarse grained GRANITE Rockhead Level
Continuous core sample of HDC With Consistent high
Geology along tunnel alignment Tai Tam Fault Zone Lugeon Test Value
Lugeon Tests
Rock Permeability
Water Inflow Tests
NR Water Ingress Prediction
Lab Tests - HD03a
Rock Mass Quality around tunnel level
NR
NR Fault Rockhead
Breccia Fault
Sheared Granite Breccia
Tunnel
18 20
Potential Hydrothermal Alteration Zone along TKO-LTT Information from HDC
TKO Line
Tuff
HDC
Hydrothermally
Altered Rocks Greisenised Granite
& Pegmatite
Greisenised Tuff
Granite
Granite
Black Hills Tunnel Incident
HDC
Granite Tuff & Granite Contact
at about 555m depth
Tuff (+33mPD)
21 23
BH offset 70m
Tuff & Granite Contact
Tuff & Granite Contact at +3mPD
Tuff & Granite Contact
at +69mPD at +18mPD Engineering Parameters used for the
Assessment
Rock Types & decomposition grades
Identification of Problematic Ground
Rockhead Level
Rock mass classification (Q-value)
Rock permeability (Lugeon Value)
Lab test results
24
22
Route 8 Eagles Nest Tunnel
1. Project References
2. HDC Technique
HDD/SP/1
3. Typical Field Tests in HDC (550 m)
25 27
Northbound
Tunnel
Part TWO
1. Project References Working area
of HDC
Southbound
Tunnel
28
Route 8 Eagles Nest Tunnel Po Shan Road Drainage Tunnel
Site Formation at South Portal Drainage Tunnel Design & Construction
2 nos. of HDC HDC along Tunnels
Nov. 05 to Jan. 06
Tolerance envelope of 2 m radius
PS-HDC/01
252 m
PS-HDC/02
310 m
29 31
HDD/SP/1
32
30
Harbour Area Treatment Scheme Stage 2A
Harbour Area Treatment Scheme Stage 2A
Ap Lei Chau
HD02 Cyberport
(610m)
Sandy Bay
Central
HDC01 at Sai Ying Pun(1250 m) HDC02 at Central (610 m) HDC03 at Wai Chai East (655 m)
HD01 Sai Ying Pun
HD05
(1250m) (700m)
HD04
(1085m)
Trajectory of HDC
Harbour Area Treatment Scheme Stage 2A Harbour Area Treatment Scheme Stage 2A
34
36
Harbour Area Treatment Scheme Stage 2A Harbour Area Treatment Scheme Stage 2A
37 39
Harbour Area Treatment Scheme Stage 2A Liantang / Heung Yuen Wai Boundary Control Point
Sheung Shui
Fanling
BCP
NE NT
38 40
Liantang / Heung Yuen Wai Boundary Control Point Tseung Kwan O Lam Tin Tunnel
HDC3:
HDC2: 1,000m
950m
HDC6:
470m
41 43
Liantang / Heung Yuen Wai Boundary Control Point Tseung Kwan O Lam Tin Tunnel
42 44
Coring Procedure of HDC
Procedure of HDC
Planning
Trajectory along the tunnel horizontal alignment
Targeting to pass through the expected fault zones
Part TWO Coring
Steerable within planned trajectory.
2. HDC Technique
Steerable Coring Barrel
Surveying
Regular surveys to ensure the HDC remained within the planned
trajectory envelope. Borehole surveying tool
47
Connect the
Set
innertube Survey
toolface -
and through out
orientation
surveytool. the bit for
and Core
with Read azimuth
Steerable orientation reading.
Coring and
Tool. inclination.
Extension
Rod
Peewee
Tool
46
48
HDC Steerable Barrel Borehole Surveying Tool
The 3 main components of a steerable barrel
Locking Piston to provide a locked position for the barrel. Corehole Surveying Tool PeeWee EMS Corehole Survey
Packer Assembly to maintain the toolface position during the streering A miniature electronic multishot that is used Survey
through out
process. for surveying of borehole profile. the bit for
azimuth
Adjustable Eccentric Housing to adjust the bending angle. Length of 0.975 m. reading.
Diameter of 30 mm.
Dogleg /
To provide orientation of a borehole.
Bending Angle
Extension
Rod
Toolface /
Rolling Angle
Peewee
Tool
49 51
PACKER
CORING BIT PROPOSED SEWAGE
A
CONVEYANCE TUNNEL
SECTION A-A
50 52
HDC Working Procedure HDC Working Procedure
GROUND GROUND
53 55
GROUND GROUND
1200m1100m 1000m 900m 800m 700m 600m 500m 400m 300m 200m
54 56
Operation Principle Operation Principle
57 59
Circulation
Pressured Fluid
1. Non-rotating, stationary outer barrel, by packer inflation, controls the directional setting. 3. Rotating inner barrel comprises an outer casing and an inner tube for core collection.
It is for maintaining the toolface angle, i.e. the coring orientation.
58 60
Operation Principle Progress Diagram for HD/01 at Sai Ying Pun
Corehole Survey
SURVEY TOOL
61
63
Working Principles
Steering System:
Non-rotating outer barrel: Slides in a set toolface while coring
Rotating inner corebarrel: Drive the bit
Non-rotating innertube: Collect the core
62
Water Absorption (Lugeon)Test in HDC Water Inflow Test by PDPS
Double Packers for Injection Test HATS Stage 2A
Pump Down Packer System (PDPS)
HATS Stage 2A
Conventional injection method to determine equivalent rock mass Sectional inflows in HDC, along the proposed tunnel alignment.
permeability over relatively short lengths in a horizontal direction. Water quantity seeping naturally from the formation as a result
of pressure difference (i.e. predicting inflow during excavation)
Testing Section: 3 m
Perforated Pipe: 15 mm diameter A more realistic hydrogeological model than using the
Packer: 76 mm diameter conventional water absorption test.
To determine an effective grouting approach.
Setup of PDPS in HDC
65 67
P
S
Typical Length of Testing Section: 100 m
Ranging from 50 m to 120 m.
Proposed
Tunnel
66 68
Water Inflow Test by PDPS Water Inflow Test by PDPS
Operation Principle
PDPS FLOW METER
PUMP
ROCK HEAD ROCK HEAD
Retrieve the core barrel string and NQ barrel
FAULT ZONE FAULT ZONE
Pump down the PDPS along the core barrel
PDPS
strings PACKER
NQ
CASING
NQ PACKER FORMATION PACKER
Operation Principle
ROCK HEAD
Apply hydraulic pressure in stepwise to break the ROCK HEAD FAULT ZONE
inflation shear pin and inflate the packers PDPS
FAULT ZONE
Further apply pressure to open the passage for test PDPS
INNER
NQ PACKER OUTER PACKER
Slightly pull out the core string barrel to break the
deflation shear pin
PRESSURED FUILD
Packers deflate and the PDPS is retrieved with
overshot
70 72
Water Inflow Test in Horizontal Hole Impression Packer Test
Po Shan Road Drainage Tunnel
Use of:
Stopwatch
Measurement Inflation Deflation Survey Tool
Jar / Container Shear Pin Landing Shear Pin
Shoulder
73 75
NQ Barrel
Proposed Tunnel
Inner Impression
Packer Packer
Typical Length of Testing Section: 20 m
Ranging from 10 m to 25 m.
Landing
Shoulder
Impression Packer
74 76
Impression Packer Test
HATS Stage 2A
Part TWO
4. Tunnelling Though Fault Zone
2 m long impression packer .
FlexitMultismart at the front to Joints copied to plastic foil
obtain the orientation.
Keep the inflation pressure at
about 50 60 bar for 20 minutes.
Increasing to about 80 90 bar
that opens the last valve, inflation.
After packer expansion, fractures
will be printed on the soft material
surface,
Mark the fractures on the packer.
Copy to the wrapped plastic foil. Survey Tool
77
Test ingSection: 1 m.
Zero toolface on
Parafilm.
Zero toolface of the
Reflex EzShot
calibrated with the
Parafilm.
Packer & Reflex in the
hole.
Adjust Goniometer
according to Reflexs
measurement.
Mark the zero Toolface
onto the rock core,
Place rock core on
Goniometer and
oriented. Packer Device with
Measure the oriented
joints by compass. Parafilm Rock Core on Goniometer Leadmine Pass Fault Gouge Collapsed into the Tunnel
78
80
Tunnelling Though Fault Zone Leadmine Pass Fault
SEA BED
TBM
LEADMINE PASS
FAULT
ROCK ROCK
By-pass to TBM to enable rail mounted drills and grouting operation to Leadmine Pass Fault
81 83
SEA BED
TBM STALLED BY
FAULT GOUGE
TBM
LEADMINE PASS
FAULT
ROCK ROCK
View through heading at end of Leadmine Pass fault
82 84
Tunnelling Though Fault Zone
SEA BED
Thank You
TBM STARTER
CHAMBER EXCAVATED
BY DRILL AND BLAST
LEADMINE PASS
FAULT
ROCK ROCK
85
SEA BED
TBM REINSTATED
LEADMINE PASS
FAULT
ROCK ROCK
86