Вы находитесь на странице: 1из 11

CEYLEX/CEB CE&NEIP

Package-02
132/33kV KEGALLE GRID S/S
Power System Protection Setting Calculation

Bay Ref: 132kV Bus Section(=E03)


Doc Ref: CEYLEX/CEB CE&NEIP Package-02-E03
Doc Revision: 1.00
Fault Calculation Standard: IEC 60909
Clean Energy and Network Efficiency
Improvement Project
Power System Protection

TECHNICAL DATA
OVER CURRENT & EARTH FAULT PROTECTION SETTING
CALCULATION
FOR
132KV BUS SECTION

CLEAN ENERGY AND NETWORK EFFICIENCY IMPROVEMENT


PROJECT-PACKAGE 02

POWER SYSTEM PROTECTION SETTING CALCULATION

FOR APPROVAL

Page 2 of
14
Clean Energy and Network Efficiency
Improvement Project
Power System Protection

ISSUE AND REVISION RECORD

Rev. Issu Prepare Reviewe Approve


e Item d d d
No.
Dat by by By
1.0 05-05- Initial Release
2017

Page 3 of
14
Clean Energy and Network Efficiency
Improvement Project
Power System Protection

1. Power System Basic Data


Basic Parameter
Sl.no Description Value Unit
1 System Voltage 132 KV
2 System Frequency 50 Hz
3 System Full Load Current 1600 A
4 System X/R Ratio for System Study ~14
5 System Base MVA for System Study 100 MVA
6 System 1-Phase Fault MVA ~1000 MVA
7 System 3-Phase Fault MVA ~1000 MVA
8 CT Primary 3000 A
9 CT Secondary 1 A
10 PT Primary 132 KV
11 PT Secondary 110 V
12 CTR 3000
13 PTR 1200
14 CTR/PTR 2.500
Clean Energy and Network Efficiency
Improvement Project
Power System Protection

2. Phase Over Current Protection


Symmetrical Fault Current
1. System Source Impedance: Zs = KV^2 / Sb

2. Total System Source Impedance: Zt = Zs

3. Total System Source MVA: St = KV^2 / Zt

4. 3-Phase Fault Current: If = (St * 10^3) / (3 * KV)

Trip & Reset Time


1. IEC Curve-A Trip Time: T = (TDM * 0.140) / (((If / Ipickup)^0.020) 1)

2. IEC Curve-A Reset Time: T = (TDM * 9.700) / (1 - ((If / Ipickup)^2.000))

Directional Vector Graph


Clean Energy and Network Efficiency
Improvement Project
Power System Protection

51P Protection - Trip


General Rules
1. Discriminating Time Delay for Backup: 0.300 Sec

2. Downstream or Backup Trip Time: 1.250 Sec @ Fault Current

3. Required Protection Relay Pickup: 50% x In or Minimum Fault Current

4. Required Protection Relay Trip Time: (Downstream Trip Time + 0.300) @ Fault
Current

Setting
Sl.no Parameter Value Unit
1 Pickup 1.00 pu
2 TD Multiplier 0.21 Sec
3 RCA - Deg
4 Curve IEC Curve A
5 Block -

50P Protection Trip


General Rules
1. Discriminating Time Delay for Backup: 0.00 Sec

2. Downstream or Backup Trip Time: 0.00 Sec @ Maximum Fault Current

3. Required Protection Relay Pickup: 100% x In or Maximum Fault Current

4. Required Protection Relay Trip Time: 0.00 @ Pickup Current

Setting
Sl.no Parameter Value Unit
1 Pickup 4.00 pu
2 TD Multiplier 0.02 Sec
3 RCA - Deg
4 Curve Definite Time
5 Block -
Clean Energy and Network Efficiency
Improvement Project
Power System Protection

3. Residual Over Current Protection


Asymmetrical Fault Current
1. System Source Impedance: Zs = KV^2 / Sb

2. Total System Source Impedance: Zt = Zs

3. Total System Source MVA: St = KV^2 / Zt

4. 3-Phase Fault Current: If = (St * 10^3) / (3 * KV)

Trip & Reset Time


1. IEC Curve-A Trip Time: T = (TDM * 0.140) / (((If / Ipickup)^0.020) 1)

2. IEC Curve-A Reset Time: T = (TDM * 9.700) / (1 - ((If / Ipickup)^2.000))

Directional Vector Graph


Clean Energy and Network Efficiency
Improvement Project
Power System Protection

51G Protection - Trip


General Rules
1. Discriminating Time Delay for Backup: 0.300 Sec

2. Downstream or Backup Trip Time: 1.250 Sec @ Fault Current

3. Required Protection Relay Pickup: 25% x In or 25% of Minimum Fault Current

4. Required Protection Relay Trip Time: (Downstream Trip Time + 0.300) @ Fault
Current

Setting
Sl.no Parameter Value Unit
1 Pickup 1.00 pu
2 TD Multiplier 0.21 Sec
3 RCA - Deg
4 Curve IEC Curve A
5 Block -

50G Protection Trip


General Rules
1. Discriminating Time Delay for Backup: 0.00 Sec

2. Downstream or Backup Trip Time: 0.00 Sec @ Maximum Fault Current

3. Required Protection Relay Pickup: 75% x In or Maximum Fault Current

4. Required Protection Relay Trip Time: 0.00 @ Pickup Current

Setting
Sl.no Parameter Value Unit
1 Pickup 4.00 pu
2 TD Multiplier 0.02 Sec
3 RCA - Deg
4 Curve Definite Time
5 Block -
Clean Energy and Network Efficiency
Improvement Project
Power System Protection

4. Breaker Failure Protection


General Rules
1. Phase Current Pickup: Ipickup > Minimum Load Current at Normal
Operation

2. Zero Sequence Current Pickup: I0pickup > Maximum Unbalance Current at


Normal Operation

3. Negative Sequence Current Pickup:


I2pickup > Maximum Unbalance
Current at Normal
Operation

50LBB Protection - Trip


Sl.no Parameter Value Unit
1 Phase Current Pickup 0.20 pu
2 Zero Sequence Current Pickup 0.20 pu
Negative Sequence Current
3
Pickup 0.20 pu
4 Retrip 0.10 Sec
5 Trip 0.20 Sec
6 Block -