3. Gravedad especfica
MW [ ppg ]
SG=
8,33
4. ECD
TVD [ psi]
(0,052)
annular pressure loss [ psi]
ECD [ ppg ] =
5. Peso del lodo mximo a partir del Leak off Test Data
casing shoe TVD [ft ]
(0,052)
leakoff pressure [ psi]
MWM [ ppg ] =
6. Salida de la bomba
TRIPLEX
SB [ ]
bl
stk
=(0,000243) ( Dliner [ ] )2( Stroke length [ ] )
D
( 20,7854) S
3
SB [ GPM ]=
DONDE:
D= dimetro de liner [in].
S= Longitud de Stroke [in].
SPM= Strokes por Minuto.
DUPLEX
Dliner [ ]
bl
[ ]
stk
( 0,000324 )
Drod []
bl
[ ]
stk
( 0,000162)
bl
[ ]
stk
SB @ 100 eff =
Frmula 2
SB
[ ]
bl
stk
=(0,000162)(S ) [ 2(D)2d 2 ]
DONDE:
S= Longitud de Stroke [in].
D= dimetro de liner [in].
D= dimetro de la barra [in].
7. Velocidad Anular
VA [
ft
]=
( [ ])
SB
bl
min
min bl
Capacidad anular [ ]
ft
Formula 2
VA [ ]ft (24,5)(Q)
= 2
min Dh Dp 2
DONDE:
Q= Rata de circulacin [GPM].
Dh= Dimetro interno del casing o dimetro del hoyo [in].
Dp= Dimetro externo de la tubera, collar [in].
FORMULA 3
( [ ])
SB
bl
min
VA
[ ]
ft
min
=
Dh 2Dp 2
SB [ GPM ] =
VA
[ ](
ft
min
Dh 2Dp 2 )
24,5
DONDE:
AV= velocidad anular deseada [ft/min].
Dh= Dimetro interno del casing o dimetro del hoyo [in].
Dp= Dimetro externo de la tubera, collar [in].
SPM =
( [ ])(
VA
ft
min
capacidad anular
[ ])
bl
ft
SB
[ ]
bl
stk
9. Capacidad anular
bl Dh 2Dp 2
CA [ ]
ft
=
1029,4
PIPE
Bl desplazados= NUMBER OF STANDS AVERAGE LENGTH
(
PULLED PER STAND [ ft ] )( )( DISPLACEMENT [ blft ])
STEP 2
MW [ ppg]
Bl desplazados
PH [ psi decrease ] = (0,052)
CASING PIPE
(
CAPACITY
bl
ft [ ])
DISPLACEMENT (
bl
ft [ ])
14. Al sacar tubera hmeda
STEP 1
bl
[ ]
( )
PIPE DISP
ft
Bl desplazados= NUMBER OF AVERAGE LENGTH
STANDS PULLED( PER STAND [ ft ] )( )
+ PIPE CAP
bl
ft [ ]
STEP 2
Bl desplazados
PH [ psi ] = ( 0,052 ) ( MW [ ppg ] )
bl
[ ]
( )
CASING PIPE DISP
( CAPACITY
bl
ft [ ])
+ PIPE CAP
ft
bl
ft [ ]
PRDIDA DE EQUILIBRIO DEBIDO A BAJO NIVEL DEL LODO
15. Longitud de tubera seca sacada para perder equilibrio
FT=
(
OVERBALANCE [ psi ] CASING CAP
[ ]
bl
ft
PIPE DISP
bl
ft [ ])
(
( MW [ ppg ] ) ( 0,052 ) PIPE DISP
bl
[ ])ft
FT=
(
OVERBALANCE [ psi ] CASING CAP
[ ]
bl
ft
PIPE CAP
bl
ft [ ]
PIPE DISP
bl
ft [ ])
(
MW [ ppg ] ( 0,052 ) PIPECAP
[ ]
bl
ft
+ PIPE DISP
bl
ft [ ])
17.
CLCULOS MTRICOS
( P ER METER TRIPPING
[ ]
D RY PIPE ,
KPa
m
=
)( CASING
CAPACITY
m
[ ]) ( [ ] )
m
m
3
METAL
DISP
3
m 102
m
[ ]
[ ])( )
3
DRILLNG m
(
METAL DISP
FLUID m
kg
PRESSURE DROP DENSITY 3 + PIPE CAPACITY
m3
[ ]
( ] )
m m
P ER METER TRIPPING =
[
WET PIPE ,
KPa
m ( ANNULAR CAPACITY
m3
m
102 [ ])
LEVEL DROP
(
LENGTH OF DRILL COLLARS [ m ] METAL DISP
m3
m [ ])
( FOR POOH DRILL COLLARS [ m ]
=
) CASING CAPACITY
m3
m [ ]
18. Temperatura de formacin
( TEMPERATURE [ F ] ) ((
TF [ F ] = AMBIENT SURFACE + TEMPERATURE INCREASE ( TVD [ ft ] )
F PER ft OF DEPTH ) )
19. Caballos de potencia hidraulica
(P)(Q)
HHP=
1714
DONDE:
HHP= CABALLOS DE POTENCIA HIDRAULICA
P= PRESIN DE CIRCULACIN [psi]
Q=RATA DE CIRCULACIN [GPM]
20. Desplazamiento y peso de tubera
bl OD [ ]2ID[]2
DISPLACEMENT [ ]
ft
=
1029,4
WEIGHT
[ ]
lb
ft
=DISPLACEMENT
bl
ft
2747
lb
bl [ ]( [ ])
21. Reglas de oro
Peso para drill collars puede ser aproximado:
WEIGHT [ ]
lb
ft
=( OD [ ]2ID [ ]2 ) (2,66)
WEIGHT
[ ]
lb
ft
=( OD [ ]2ID [ ]2 ) (2,5 6)
PUMP RATE 1
log (
PUMP RATE 2 )
Clculos mtricos
UNIDADES S.I.
2
NEW SPM
( NEW PUMP PRESSURE
WITH NEW PUMP STROKES [ KPa ]
= CURRENT
)( )(
PRESSURE [ KPa ] OLD SPM )
COSTO POR PIES
B+ C R (t+ T )
CT =
F
DONDE:
BIT COST (B)
RG COST (CR)
ROTATING TIME (t)
ROUND TRIP TIME (T)
FOOTAGE PER BIT (F)
CLCULOS DE PILDORA
23.Clculo de bbls de pildora para sacar tubera seca
24.Peso de pildora requerido para una longitu deseada de tuberi seca con un set de
volumen de pildora
Se determinar lo siguiente:
Longitud del ensamblaje de fondo (BHA) necesario para un peso deseado sobre la broca (WOB)
Pies de tuberia de perforacin que se puede utilizar con un determinado ensamblaje de fondo (BHA)
PROFUNDIDAD DEL WASHOUT