1.

Gradiente de presin (psi/ft) cte: 0,052 : (ppg)


GR
[ ]
Psi
ft
=( 0,052 ) ( MW [ ppg ] )

2. Presin hidrosttica (psi)


PH [ psi]= ( 0,052 ) ( MW [ ppg] )( TVD [ft ] )

3. Gravedad especfica
MW [ ppg ]
SG=
8,33

4. ECD
TVD [ psi]

(0,052)
annular pressure loss [ psi]
ECD [ ppg ] =

5. Peso del lodo mximo a partir del Leak off Test Data
casing shoe TVD [ft ]

(0,052)
leakoff pressure [ psi]
MWM [ ppg ] =

6. Salida de la bomba
TRIPLEX
SB [ ]
bl
stk
=(0,000243) ( Dliner [ ] )2( Stroke length [ ] )

D
( 20,7854) S
3

SB [ GPM ]=
DONDE:
D= dimetro de liner [in].
S= Longitud de Stroke [in].
SPM= Strokes por Minuto.
DUPLEX
Dliner [ ]



bl
[ ]
stk

( 0,000324 )

Drod []



bl
[ ]
stk

( 0,000162)





bl
[ ]
stk
SB @ 100 eff =

Frmula 2
SB
[ ]
bl
stk
=(0,000162)(S ) [ 2(D)2d 2 ]

DONDE:
S= Longitud de Stroke [in].
D= dimetro de liner [in].
D= dimetro de la barra [in].

7. Velocidad Anular

VA [
ft
]=
( [ ])
SB
bl
min
min bl
Capacidad anular [ ]
ft
Formula 2
VA [ ]ft (24,5)(Q)
= 2
min Dh Dp 2

DONDE:
Q= Rata de circulacin [GPM].
Dh= Dimetro interno del casing o dimetro del hoyo [in].
Dp= Dimetro externo de la tubera, collar [in].
FORMULA 3

( [ ])
SB
bl
min

VA
[ ]
ft
min
=
Dh 2Dp 2

SB [ GPM ] =
VA
[ ](
ft
min
Dh 2Dp 2 )

24,5

DONDE:
AV= velocidad anular deseada [ft/min].
Dh= Dimetro interno del casing o dimetro del hoyo [in].
Dp= Dimetro externo de la tubera, collar [in].

8. Strokes por minuto requeridos a partir de la velocida anular deseada

SPM =
( [ ])(
VA
ft
min
capacidad anular
[ ])
bl
ft

SB
[ ]
bl
stk

9. Capacidad anular

bl Dh 2Dp 2
CA [ ]
ft
=
1029,4

CAPACIDAD ANULAR ENTRE CASING Y MULTIPLES TUBERAS DE PERFORACIN


[bl/ft]
bl Dh 2[T 12+T 22]
CA [ ]ft
=
1029,4
CAPACIDAD DE TUBERAS Y HOYOS ABIERTOS; TUBERA DE PERFORACIN,
DRILL COLLAR, REVESTIMIENTO Y OBJETOS CILINDRICOS.
ID [ 2 ]
C [ ]
bl
ft
=
1029,4

10. Cantida de cortes por pie perforado


2
Dh (
BARRILES DE CORTES= 1%POROSIDAD ]
1029,4
TOTAL DE SLIDOS GENERADOS
W cg =350 ( Ch )( L ) (1P ) SG
DONE:
Wcg= Slidos generados [lb]
Ch= Capacidad del hoyo [bl/ft]
L= distanca de perforacin [ft]
SG= gravedad especifica de los cortes
P= porosidad [%]
CONTROL DE LA PERFORACIN
11. Velocidad mxima de perforacin (MDR), ft / h, al perforar orificios de
dimetro grande (14-3 / 4 pulg y mayores)
( 67 ) ( MWSALIDA [ ppg ] MWentrada [ ppg ] ) (rata de circulacin [ GPM ] )
MDR
[ ]
ft
hr
=
Dh2

12. Factor de Boyancia


65,5[MW [ ppg ] ]
FB=
65,5
Disminucin de la Presin hidrosttica (HP) al extraer el tubo del orificio
13. Al sacar tubera seca
STEP 1

PIPE
Bl desplazados= NUMBER OF STANDS AVERAGE LENGTH
(
PULLED PER STAND [ ft ] )( )( DISPLACEMENT [ blft ])
STEP 2

MW [ ppg]
Bl desplazados
PH [ psi decrease ] = (0,052)
CASING PIPE

(
CAPACITY
bl
ft [ ])
DISPLACEMENT (
bl
ft [ ])
14. Al sacar tubera hmeda
STEP 1
bl
[ ]
( )
PIPE DISP
ft
Bl desplazados= NUMBER OF AVERAGE LENGTH
STANDS PULLED( PER STAND [ ft ] )( )
+ PIPE CAP
bl
ft [ ]
STEP 2
Bl desplazados
PH [ psi ] = ( 0,052 ) ( MW [ ppg ] )
bl
[ ]
( )
CASING PIPE DISP

( CAPACITY
bl
ft [ ])
+ PIPE CAP
ft
bl
ft [ ]
PRDIDA DE EQUILIBRIO DEBIDO A BAJO NIVEL DEL LODO
15. Longitud de tubera seca sacada para perder equilibrio

FT=
(
OVERBALANCE [ psi ] CASING CAP
[ ]
bl
ft
PIPE DISP
bl
ft [ ])
(
( MW [ ppg ] ) ( 0,052 ) PIPE DISP
bl
[ ])ft

16. Longitud de tubera mojada sacada para perder equilibrio

FT=
(
OVERBALANCE [ psi ] CASING CAP
[ ]
bl
ft
PIPE CAP
bl
ft [ ]
PIPE DISP
bl
ft [ ])
(
MW [ ppg ] ( 0,052 ) PIPECAP
[ ]
bl
ft
+ PIPE DISP
bl
ft [ ])
17.

CLCULOS MTRICOS

CADA DE PRESIN POR METRO DE TUBERA SACADA TUBERA SECA


DRILLNG

PRESSURE DROP ( FLUID


kg
DENSITY 3 )[ ] ( METAL DISP [ ])
m3
m

( P ER METER TRIPPING

[ ]
D RY PIPE ,
KPa
m
=
)( CASING

CAPACITY
m

[ ]) ( [ ] )
m
m
3

METAL

DISP
3
m 102
m

[ ]
[ ])( )
3
DRILLNG m

(
METAL DISP
FLUID m
kg
PRESSURE DROP DENSITY 3 + PIPE CAPACITY
m3
[ ]
( ] )
m m
P ER METER TRIPPING =

[
WET PIPE ,
KPa
m ( ANNULAR CAPACITY
m3
m
102 [ ])
LEVEL DROP
(
LENGTH OF DRILL COLLARS [ m ] METAL DISP
m3
m [ ])
( FOR POOH DRILL COLLARS [ m ]
=
) CASING CAPACITY
m3
m [ ]
18. Temperatura de formacin

( TEMPERATURE [ F ] ) ((
TF [ F ] = AMBIENT SURFACE + TEMPERATURE INCREASE ( TVD [ ft ] )
F PER ft OF DEPTH ) )
19. Caballos de potencia hidraulica
(P)(Q)
HHP=
1714
DONDE:
HHP= CABALLOS DE POTENCIA HIDRAULICA
P= PRESIN DE CIRCULACIN [psi]
Q=RATA DE CIRCULACIN [GPM]
20. Desplazamiento y peso de tubera
bl OD [ ]2ID[]2
DISPLACEMENT [ ]
ft
=
1029,4

WEIGHT
[ ]
lb
ft
=DISPLACEMENT
bl
ft
2747
lb
bl [ ]( [ ])
21. Reglas de oro
Peso para drill collars puede ser aproximado:
WEIGHT [ ]
lb
ft
=( OD [ ]2ID [ ]2 ) (2,66)

Peso para espiral drill collars puede ser aproximado:

WEIGHT
[ ]
lb
ft
=( OD [ ]2ID [ ]2 ) (2,5 6)

22. Frmula de Roughneck's


FRMULA BSICA
2
NEW PUMP RATE [ SPM ]
( NEW CIRCULATING =
PRESSURE [ psi ] )( PRESENT
)(
CIRCULATING PRESSURE [ psi ] OLD PUMP RATE [ SPM ] )
Determinacin del factor exacto en la ecuacin anterior
PRESSURE 1
FACTOR=
( PRESSURE 2 )
log

PUMP RATE 1
log (
PUMP RATE 2 )
Clculos mtricos
UNIDADES S.I.
2
NEW SPM
( NEW PUMP PRESSURE
WITH NEW PUMP STROKES [ KPa ]
= CURRENT
)( )(
PRESSURE [ KPa ] OLD SPM )
COSTO POR PIES
B+ C R (t+ T )
CT =
F
DONDE:
BIT COST (B)
RG COST (CR)
ROTATING TIME (t)
ROUND TRIP TIME (T)
FOOTAGE PER BIT (F)
CLCULOS DE PILDORA
23.Clculo de bbls de pildora para sacar tubera seca

24.Peso de pildora requerido para una longitu deseada de tuberi seca con un set de
volumen de pildora

25.Volumen, altura, presin ganada debido a la pildora


26.Barriles ganados debido al bombeo de pldora

27.Densidad aparente de cortes (usando el balance del lodo)


Procedimiento
Los cortes deben ser lavado libre de lodo en un fluido base aceite, el diesel se puede
utilizar en lugar de agua.
Ajuste el peso de lodo a 8,33 ppg.
Llenar el diesel y los cortes en equilibrio y tapar.
Remover la tapa, llenar con agua (cortes incluidos) coloque la tapa y retirar el diesel.
Mueva el contrapeso para obtener un nuevo equilibrio

La gravedad especfica de los cortes se calcula de la siguiente manera:

DISEO DE LA SARTA DE PERFORACIN (LIMITACIONES)

Se determinar lo siguiente:

Longitud del ensamblaje de fondo (BHA) necesario para un peso deseado sobre la broca (WOB)

Pies de tuberia de perforacin que se puede utilizar con un determinado ensamblaje de fondo (BHA)
PROFUNDIDAD DEL WASHOUT
PRDIDA DE RETORNO, PERDIDA DE EQUILIBRIO