Crane Data
CORBEL DESIGN
INPUT DATA :
end clearance = 200 mm fcu = 30 N/mm2
cover = 30 mm fy = 460 N/mm2
breath, b = 400 mm
height, h = 550 mm
bar diameter = 25 mm
depth, d = 508 mm > 388
k = 0.31
z = 359.40 mm
x = 329.11
x/d = 0.65 > 0.615
Ft = 378.19 KN
Fc = 50148.48 1.85934702 27.6365
Asreqd = 945 mm2
Asmin. = 812.00 mm2
Asmax. = 2639.00 mm2
bar dia = 25 mm
no of bars = 4 mm provide
As prov = 1963 mm2 OK, > As min. 4 T 25
OK, < As max.
SHEAR CHECK
V = 3.35 N/mm2
100 As / bd = 0.97
400/d = 1.00
Vc = 0.66 N/mm2
enhancement = 5.08
Vc (max) = 3.37 N/mm2 Vc > V
b = 1000 mm Ft hy =
0.45h to
h = 400 mm Fc 0.6h
z
h
hy = 240 mm d
Reinf. dia = 20 mm 0.9x
cover = 40 mm
d = 350 mm L
av / d = 0.857 mm 0.9 x cos
fcu = 35
Reynold H/bk fy = 460 N/mm2
link dia = 16 mm
L = 850 mm
k = 0.015026 k = Fv / (0.9 fcu b av )
z = 340.9104 mm = 0.974 d
x = 20 mm = 0.058 d x = ( d - z )/0.45
x/d = 0.058 < 0.615 The Steel will have yielded before concrete crashes
Moment Check :
Ft = 124.9595 kN Ft = N cot
Ast req. = 312.3988 mm2
Ast min = 1400 mm2
Ast max = 4550 mm2
Bar size = 20 mm
No. of bar = 6 mm
Asprovided = 1885 mm2 Reinf. sufficient
= 0.538559 %
2d / av = 2.333
vc(C25 conc) = 0.79 ( 100 As / ( bv d ))1/3 ( 400 / d )1/4 /m m = 1.25
= 0.532
Shear reinforcement :
v-2dvc/av = -0.982 Not less than 0.4
Asv = 274.600 mm2 < 0.5 Ast = 942.478
- Combined As + Asv should be within the limits of 0.6% minimum and 2.0% maximum of b * d
Main bars Min. Asv No. of link Asv Combined Limiting of combined
Ast = 1/2*Ast provided provided Ast + Asv Ast + Asv