SMHB Sdn Bhd in association with

JOB NO. 891


CALC SHEET NO.:
JOB NAME : Pahang Selangor Raw Water Transfer Project CALCULATIONS BY: WTF DATE 19/5/17
STRUCTURE : Crane Load CHECKED BY: DATE
SECTION : Corbel Design REVIEWED BY: DATE
REF CORBEL DESIGN CALCULATION OUTPUT

Crane Data

span between rails = 16.8 m


weight of crane + crab = 180 KN
weight oif crab only = 20 KN
minimum hook approach = 1 m
span of crane rail = 6.5 m
weight of crane rail = 113 Kg/m
crane capacity = 250 KN

Maximum Static wheel load = 166.964 KN / wheel


minimum static wheel load = 48.036 KN / wheel

For impact max wheel load = 208.705 KN / wheel


For impact, min wheel load = 60.045 KN / wheel

horizontal force tansverse to rail = = 6.750 KN / wheel


horizotal force longitudinally = 2.087 KN / wheel
along each rail

vertical load of rail on each corbel = 7.345 KN

ultimate max vertical load on a corbel (x 1.6) = 679.609 KN

Ultimate Min vertical load on a corbel (x 1.6) = 203.895 KN

ultimate transverse force on a corbel(x 1.6 ) = 21.600 KN

ultimate max vertical load on a corbel (x 1.4) = 594.658 kN

Ultimate Min vertical load on a corbel (x 1.4) = 178.408 KN

ultimate transverse force on a corbel(x 1.4 ) = 18.900 kN

Service max vertical load on a corbel (x 1.4) = 425 kN

Service Min vertical load on a corbel (x 1.4) = 127 kN

Service transverse force on a corbel(x 1.4 ) = 14 kN


SMHB Sdn Bhd in association with

JOB NO. 891


CALC SHEET NO.:
JOB NAME : Pahang Selangor Raw Water Transfer Project CALCULATIONS BY: WTF DATE 19/5/17
STRUCTURE : Crane Load CHECKED BY: DATE
SECTION : Corbel Design REVIEWED BY: DATE

CORBEL DESIGN

INPUT DATA :
end clearance = 200 mm fcu = 30 N/mm2
cover = 30 mm fy = 460 N/mm2
breath, b = 400 mm
height, h = 550 mm
bar diameter = 25 mm
depth, d = 508 mm > 388

ultimate vertical load = 680 KN


ultimate concrete shear stress = 4.38 N/mm2

k = 0.31
z = 359.40 mm
x = 329.11
x/d = 0.65 > 0.615
Ft = 378.19 KN
Fc = 50148.48 1.85934702 27.6365
Asreqd = 945 mm2
Asmin. = 812.00 mm2
Asmax. = 2639.00 mm2

bar dia = 25 mm
no of bars = 4 mm provide
As prov = 1963 mm2 OK, > As min. 4 T 25
OK, < As max.

SHEAR CHECK

V = 3.35 N/mm2

100 As / bd = 0.97
400/d = 1.00
Vc = 0.66 N/mm2
enhancement = 5.08
Vc (max) = 3.37 N/mm2 Vc > V

V-2dVc/av = -0.02 < 0.4

Asv = 61 mm2 bar dia. = 12 provide


Asv (min) = 472 mm2 no of bars = 5 5 T 12
As prov = 1131 mm2 (2 legs)
OK !
Depth over links are to be provided = 338 mm
Job No. : 909 Rev. 0
Calc sheet no.
Job name : Proposed Develop of Langat2 Water Treatment Plant and Water Drawings nos.
Reticulation System In Selangor Darul Ehsan/ Wilayah Persekutuan Kuala Lumpur Designed by : WTF Date : 5/19/2017
Structure : TWPS Checked by : Date :
Section : Corbel Reviewed by : Date :
Ref
Input av
Fv = 142 kN
av = 300 mm av< d,OK Fv

b = 1000 mm Ft hy =
0.45h to
h = 400 mm Fc 0.6h
z

h
hy = 240 mm d
Reinf. dia = 20 mm 0.9x

cover = 40 mm
d = 350 mm L
av / d = 0.857 mm 0.9 x cos
fcu = 35
Reynold H/bk fy = 460 N/mm2
link dia = 16 mm
L = 850 mm
k = 0.015026 k = Fv / (0.9 fcu b av )
z = 340.9104 mm = 0.974 d
x = 20 mm = 0.058 d x = ( d - z )/0.45
x/d = 0.058 < 0.615 The Steel will have yielded before concrete crashes

Steel Strain st = cc( d - x / x ) = 0.05715 > y = 0.00219


Steel Stress fst = Es st = 460 N/mm2

Moment Check :
Ft = 124.9595 kN Ft = N cot
Ast req. = 312.3988 mm2
Ast min = 1400 mm2
Ast max = 4550 mm2
Bar size = 20 mm
No. of bar = 6 mm
Asprovided = 1885 mm2 Reinf. sufficient
= 0.538559 %

Shear Capacity Check :

2d / av = 2.333
vc(C25 conc) = 0.79 ( 100 As / ( bv d ))1/3 ( 400 / d )1/4 /m m = 1.25
= 0.532

vc (C30 conc) = vc(C25 conc) * ( fcu / 25 )1/3


= 0.595

Max. vc = vc*2d / av = 1.388 N/mm2


v = V / bd = 0.406 N/mm2

Shear reinforcement :
v-2dvc/av = -0.982 Not less than 0.4
Asv = 274.600 mm2 < 0.5 Ast = 942.478

- Combined As + Asv should be within the limits of 0.6% minimum and 2.0% maximum of b * d

Main bars Min. Asv No. of link Asv Combined Limiting of combined
Ast = 1/2*Ast provided provided Ast + Asv Ast + Asv

( mm2 ) ( mm2 ) ( mm2 ) (%)


1885 942 3 1206 OK 3091 0.88 Value OK

Result : Reinforcement = 6T20


Shear link provided = 3T16