Вы находитесь на странице: 1из 4

HAIL SURFACE FACIL

Contract Number: 8598

RT REQUEST

TIE IN Line
Sr. No. Dwg no./Rev WELDING PROCESS POSITION WPS No Weld No. Welder ID Dia(In)
NO.. Class

1 HD-EC-TF-P210-901 26A GTAW WB2N 5G TR-235 1 TW-665 6"

2 HD-EC-TF-P210-901 26B GTAW WB2N 5G TR-235 2 TW-141 6"

3 HD-EC-TF-P120-901 4A GTAW+SMAW WC1N 5G TR-236 1 TW-857 10"

4 HD-EC-TF-P120-901 4B GTAW+SMAW WC1N 5G TR-236 2 TW-665 10"

5 HD-EC-TF-P0186-901 12A GTAW+SMAW B1N 5G TR-236 1 TW-665 12"

6 HD-EC-TF-P0186-901 12A GTAW+SMAW B1N 5G TR-236 2 TW-141 12"

7 HD-EC-TF-P0186-901 12A GTAW B1N 5G TR-235 3 TW-26 3/4"

8 HD-EC-TF-P0186-901 12A GTAW B1N 5G TR-235 4 TW-26 3/4"

Page 1 of 4
9 HD-EC-TF-P0186-901 12A GTAW B1N 5G TR-235 5 TW-26 3/4"

10 HD-EC-TF-FL5003-002 FLARE GTAW A59AN 5G TR-235 FLARE 1 TW-52 12"

11 HD-EC-TF-FL5003-002 FLARE GTAW A59AN 5G TR-235 2 TW-52 12"

PILOT GAS
12 CLIENT SITE DRAWING GTAW 5G TR-237 1 TW-26 1"
GAS LINE

PILOT GAS
13 CLIENT SITE DRAWING GTAW 5G TR-237 2 TW-26 1"
GAS LINE

PILOT GAS
14 CLIENT SITE DRAWING GTAW 5G TR-237 3 TW-26 1"
GAS LINE

PILOT GAS
15 CLIENT SITE DRAWING GTAW 5G TR-237 4 TW-26 1"
GAS LINE

IDENTIFICATION ON FILM AS FOLLOWS: ADOC/TR/TARGET/ CONTRACT NO/ DWGN

QA/Q

Name
Signature
Date

Page 2 of 4
CE FACILITIES
PROJECT: HSF
Date:- 25-Oct-16 REQUEST NO : 003
Joining
Electrode/Filler Wire Material Description
Elements
Joint Type Fit-up
Sch/ Thk Final Visual
(Butt/Branch/ (Acc) Remarks
(mm) (Acc-Rej)
Fillet/Socket) (Viz,PipeFlg,Pip Specification
1st Component 2nd Component Date
e-Elb,Etc) (upstream) (Down Stream)

SCH 40 BUTT PIPE TO TEE ER 70S-2 A 106 Gr B A 234 WPB ACC ACC

SCH 40 BUTT PIPE TO TEE ER 70S-2 A 106 Gr B A 234 WPB ACC ACC

PIPE TO
SCH 80 BUTT ER 70S-2+E 7018 A 106 Gr B A 105N ACC ACC
FLANGE

SCH 80 BUTT PIPE TO TEE ER 70S-2+E 7018 A 106 Gr B A 234 WPB ACC ACC

SCH 40 BUTT PIPE TO TEE ER 70S-2+E 7018 A 106 Gr B A 234 WPB ACC ACC

SCH 40 BUTT PIPE TO TEE ER 70S-2+E 7018 A 106 Gr B A 234 WPB ACC ACC

PIPE TO
S 160 BUTT ER 70S-2 A 106 Gr B A 234 WPB ACC ACC
ELBOW

ELBOW TO
S 160 BUTT ER 70S-2 A 234 WPB A 106 Gr B ACC ACC
PIPE

Page 3 of 4
PIPE TO
S 160 BUTT ER 70S-2 A 106 Gr B A 105N ACC ACC
FLANGE

CUT AND
SCH 20 BUTT PIPE TO PIPE ER 70S-2 API 5L-B-PSL2 API 5L-B-PSL2 ACC ACC
REWELD

SCH 20 BUTT PIPE TO PIPE ER 70S-2 API 5L-B-PSL2 API 5L-B-PSL2 ACC ACC

PIPE TO
SCH 20 BUTT ER 316L A 312 A 182 ACC ACC
FLANGE

PIPE TO
SCH 20 BUTT ER 316L A 312 A 182 ACC ACC
FLANGE

PIPE TO
SCH 20 BUTT ER 316L A 312 A 182 ACC ACC
FLANGE

PIPE TO
SCH 20 BUTT ER 316L A 312 A 182 ACC ACC
FLANGE

O/ DWGNO/PROCESS/SPOOL NO./WPS NO / WELDER ID/PIPE X THK/DATE

QA/QC Inspector/Engineer QA/QC Inspector/Engineer


(Contractor) (Company)

Page 4 of 4

Вам также может понравиться