Вы находитесь на странице: 1из 1

'no kidding' dual hydraulic failure, you'd

MD-90-30
have no flaps or slats either," he adds.
operational speeds versus altitude
Handling and cockpit commonality is a 15-
key part of Douglas Aircraft's marketing
drive to operators of DC-9/MD-80-series
twins. "If you blindfolded someone and
put them in the cockpit, they probably M= .57 .7 .84 .895
couldn't tell you whether they were flying
in the -88 or in the -90. Inside, it looks g 10-
almost like an -88. If in doubt, leave all
<V L O )R
the switches on automatic and don't fool
with them," says Jones. "Even a DC-9
pilot could walk into this aircraft and not
have any problems," he adds.
Envelope expansion is now complete at OOxr V
o Vrc VD
the high-altitude and high-speed ends.
"Operationally, this aeroplane will have
the same envelope as the MD-80 and -88,
with speeds up to 340kt and Mach 0.84.
In clearing that envelope, we have to go
15% beyond that, so we have been up to 100 150 200 250 300 350 400 450
Mach 0.85 and 395kt equivalent airspeed Airspeed (knots)
[EAS], All Douglas twins up to now are
cleared up to 395kt indicated airspeed. Jones believes that this escape system is scheduled, followed by a return to the
That equivalent for the MD-90 is 411kt superior to that used in the MD-80, which USA via Reykjavik, Iceland.
EAS, so we will be cleared to a larger involved egress through the forward McDonnell Douglas will then take the
flight envelope than any other twin and cargo-compartment hatch. MD-90 to Bangor, Maine, and Atlanta,
it really flies nice out there," he says. The aerodynamic qualities of the wing Georgia, where it will be demonstrated to
The aircraft will be certificated to have already been improved by a pattern Delta Air Lines, before being flown to
37,000ft, but for testing has been flown to of vortex generators (VGs), developed on Washington National and East Hartford
around 40,000ft. Douglas Aircraft's testbed MD-87 at Yuma, en route to Long Beach.
The slower end of the envelope is not Arizona. "They've certainly helped us Before beginning the tour, the aircraft's
due to be cleared until later this year after open up the buffet boundary and will anti-skid and carbon-brake systems will
stall testing begins in July. "Because we're enable us to meet our top-of-climb guar- be tested on a wet runway somewhere in
going to Paris, there wasn't enough time antee. It looks like we're going to make the western USA. In testing, Jones de-
to get it all done prior to that. We've got it," says Jones. scribes the operation of carbon brakes as
pretty good confidence that the overall A series of VGs forward and slightly "very nice and very smooth".
low-speed and stall characteristics will be inboard of the aileron have also been Full certification is not due until Au-
the same as the -80, because it has the introduced to help increase the effective- gust 1994, so that design changes from
same wing. [Stall speeds are well under ness of the tab-driven flight-control sur- the test programme can be introduced
lOOkt with 40 flaps]. Until we complete faces in the event of separation stalls at early into production and to ensure a
stall testing, we're operating with airspeed high altitudes. The VGs are also arranged complete "service-ready" capability, with
tags just to be conservative. We have 5kt in two spanwise groups near the leading Category Ilia and automatic landing.
added on to take-off speeds, for example." edge of the outboard wing-section and The T-2, the avionics test aircraft, is
will provide additional stall warning by due to be flown in September. As the T-l
CREW ESCAPE generating buffet. is already fitted with a standard avionics
When the first MD-90, called the T-l, The re-plumbed wing-fuel system, de- suite, however, the tasks to be carried out
returns from Paris, it will be fitted with signed to pass cold-soaked fuel through a on the T-2 are expected to be made easier.
a spin chute for the stall tests and final heat exchanger to avoid the development "We've already got a head start on some
clearance of the full envelope. "I'm not of the "cold corner", which is seen on of the likely avionics problems, so that the
expecting anything strange out of [the MD-80s, is expected to be tested for the T-2 is going to be in really good shape as
stall tests] and the rest of the basic first time "in anger" when the aircraft an avionics test aircraft," says Jones.
flight-test programme," says Jones, adding travels to Europe. Other provisions also From the test-pilots' perspective, that
that this is due to be completed by the include a revised fuel-burn cycle, ice head start feeling seems likely to be
end of September 1993. sensor and wing-yarn tufts to test for ice reflected throughout the programme. CI
To give the test crew a better chance of while on the ground.
The engine is the most obvious external change
escape in an unrecoverable deep stall, the Exposure to icing is expected during
aircraft has a crew-escape chute mounted the European trip, which is scheduled via
on the tail stairway. The steps of the stair St Louis, Missouri; Gander, Canada; and
are covered, for a smooth sliding surface, Shannon, Ireland; on the way to Rome,
and the stair has weights to speed deploy- where the aircraft will be demonstrated to
ment. A handgrip bar is slung across the Italian flag-carrier, Alitalia. The T-l will
chute to help crew members egress at the then be flown to Le Bourget, for a
correct angle into the slipstream. Two sets six-to-seven day stay at the Paris air show,
of hand-rails line the aisle down the cabin before being flown north to Stockholm,
to help the escape and prevent the crew where it will be shown to several Scan-
from becoming lodged between the banks danavian MD-80 operators. These include
of test equipment as they move to the SAS, Transwede and Finnair. A stop at
escape slide. Manchester, UK, to visit Airtours, is then

50 FLIGHT INTERNATIONAL 9 - 15 June, 1993

Вам также может понравиться