The purpose of the grouting between steel structure and reinforcement concrete
construction is:
In order to achieve these goals the following work method statements should be
complied with:
- Connection area between steel and concrete structure must be keep out of dirt
and grease etc.
- The concrete surface is to be roughening as far as technically possible and
reasonable.
- All concrete connection elements must be soaked (minimum one full day) with
water without creating stagnant water.
- After grouting/concreting, curing shall be done in accordance with local
requirements (such as protection against wind, heavy rain or heat, frost, etc.)
The application of the embed grout depends on the high of the grout and the
instruction of the manufacturer:
Seite 1 von 1
Basic Data:
Resistance:
Against freezing and salt, resistance against chemicals, resistance against oil and petrol
Grain size 0 8 mm
Strength 24 h 8 60 N/mm
3d 11 - 70 N/mm
7d 12 - 84 N/mm
28 d 13 - 92 N/mm
90 d 14 - 104 N/mm
Dwelling 28 d 0,35 %