Site Access
JAF Approval
Work From Home
Fueling
Rigger Kit Issues/TEMS issues
No Dedicated Teams/Driver issuance
ISDP App Issues/Web Approval
Customer Complaint Scenario/POC
Possibl
Shared Sites with Other Operators/Delay from Guard's side/Site St
Team have to go to the
Driver have to pick the team (2G/3G En
Fueling Expense is not avaiable on time(not befor
Many times, the riggers do not have full EHS required tools. Also sometim
There are no dedicated teams allocated ( Fixed Engineer/Rigger/Driver)/Engineer has to c
Take a lot of time for approval due to which eng
In most of the Customer Complaints, Engineer have to do Walk Test and perform EHS QC but thes
Percentages
5%
30%
10%
10%
5%
20%
13%
7%
8110
o
Rigger Name Engineer Name Driver Name
1 Waheed Umer zaib No Driver
2 Wasim Haseeb Javad Shah
3 Farukh Fahad Nadeem
4 Idrees Waleed Nazar
5 Shahbaz Omer shah Israr
6 Lajbar Khan Ahmad Swati Adeel
7 Haroon Salman Azhar
8 Shahzad
9 Abid Ullah Niaz
10 Abdullah Gul Rehman
11 Shoaib Arshad
12 Haris No Driver
City Name Testing Dates Total Calls
01/03/2017 to
Muzafarabad AJK 310
03/03/2017
06/03/2017 to
Palandri AJK 225
08/03/2017
13/03/2017 to
Kohat 302
16/03/2017
20/03/2017 to
Mingora Swat 200
21/03/2017
Network Call Call MOS
Grade of Service
Downtime Connection Completion (Avg of, Avg A to
Service Accessibility
Time Ratio B+Avg B to A)
TH 2% TH 97%
TH <1% TH 6.5 Sec TH > 98% TH > 3