Introduction

In this project, we aimed to create the city that was free from pollution.
Nowadays, the number of population were increasing the same as the number of
technologies. When the number of technologies is increasing, it also expand the
contamination in the city. So this time, we decided to change the system of city by
prohibited the cars from the center of city but instead, we provided the public
transportation which are electrical trams. This is not only decrease the pollution in
country, but also united the harmony among people and decrease the number of
accident as there are the exact lane for tram, can not be mixing with the walk lane. We
will use the tram system which transport by electricity. It could go around the city and
more easily.

Objective

We designed this town to make every people can live in the town and live with a
healthy life because nowadays, people live with many pollution, like air pollution, etc.
So, we will build the public transportation for people and banned all the personal
transportation to decrease the pollution. Not only it can decrease the air pollution, but
also can decrease the traffic and number of accidents. We used Thailand map to be our
model because Thailand has many problems about traffic and pollution, so we will try to
figure out if it positive or negative by designing the public transportation that doesnt
exist in Thailand.

Data Analysis

One tram costs about 86 million baht. We want 27 trams for 15 stops in this town.
86,000,000 = 8.6 x 107
27 x 8.6x 107 = ~ 232.2 x 107
= ~ 2.32 x 109
So, this investment would cost about 2.3 billion baht.

Project Implementation Plan


For this project, as we mentioned before, we are going to use the electrical trams
to travel instead of using car to decrease the pollution. So in the city, we would separate
the trams lane and walk lane, which we will put the trams lane in the middle and walk
lane compress on two side. There will have the trams stations in the main road and
significant places so it would be convenient for people to travel. We also going to create
the transition lines for more various routes.

Division of Duties List

Writing the proposal Tanyaton Panyadilok


Tatpicha Phokeeratikul
Acquiring the materials Tanaporn Manoonsumrit
The scale drawing Paphawarin Khwansri
Weerapoom Pongruengkiat
Creating a model for the proposal Tanyaton Panyadilok
Tatpicha Phokeeratikul
Tanaporn Manoonsumrit
Paphawarin Khwansri
Weerapoom Pongruengkiat

Reference
McKie, R. (2014, May 31). Edinburgh's tram system opens 375m over budget
and three years late. Retrieved March 31, 2017, from https://www.theguardian.com/uk-
news/2014/jun/01/edinburgh-tram-system-open