PROPERTIES OF SOIL:

SOIL 1
DENSITY () = 18 KN/m^3
EMBANKMENT HEIGHT(L1) = 0.5 m.
AN OF FRICTION OF SOIL () = 35 Deg.
SOIL 2
DENSITY () = 8 KN/m^3
EMBANKMENT HEIGHT(L2) = 1.5 m.
AN OF FRICTION OF SOIL () = 35 Deg.
SOIL 2
DENSITY () = 11 KN/m^3
EMBANKMENT HEIGHT(L2) = D m.
AN OF FRICTION OF SOIL () = 37.50 Deg.

COMPUTE ACTIVE PRESSURE AND PASSIVE PRESSURE:


Ka = (
tan^2 45 -
2
) = Ka; = 0.368


Kp = (
tan^2 45 +
2
) = Kp; = 2.716

COMPUTATION OF D theory:
Q'1 = L1Ka = Q'1; = 9.936

Q'2 = (L1 + L2) Ka = Q'2 ; = 14.352

Q'2
L3; = 0.382
(Kp - Ka)

Q'3 = (L1 + "L2) Ka + L3Ka = Q'3 ; = 15.49

P = 1/2(Q'1L1) + Q'1L2 + 1/2(Q'2 - Q'1)L2 + 1/2Q'2L3

z =
1
P [7.452(0.382 +1.5+1/3) +14.904(0.382+1.5/2 ) +3
z = 1.33 m.

Q'4 = Kp(L1 + 'L2) + L3(Kp-ka) Q'5; = 120.29

Q'4
A1 = A1; = 3.198
'(Kp - Ka)
8P
A2 = A2; = 6.09
'(Kp - Ka)

6P[2z'(Kp - Ka) + Q'4


A3 = A3; = 23.58
'^2(Kp - Ka)

P[6zQ'4 + 4P]
A4 = A4; = 10.13
'^2(Kp - Ka)

L4^4 + A1L4^3 - A2L4^2 - A3L4 - A4 = 0 L4 = 2.288

COMPUTATION OF LENGTH OF PILE:


FACTOR OF Safety = 1.3
L = L1 + L2 + F.S.(L3 + L4) L = 6.85 m.

say: 7.50 m.
KN/m^2

KN/m^2

m.

KN/m^2

P; = 28.63 KN/m

+1/3) +14.904(0.382+1.5/2 ) +3.312(0.382+1.5/2)+ 2.956(0.382+2/3) ]

KN/m^2
Name of Project:

Net Length:

SUMMARY OF QUANTITIES
QUANTITY
ITEM No. DESCRIPTION UNIT WALL/REVETMENT/PILE TOTAL
CAP/EXTENDED COL

200 AGGREGATE SUB BASE COURSE cu.m. 55.00


311(1)a PORTLAND CEMENT CONCRETE PAVEMENT (unreinforced) sq.m. 547.00
103(3) FOUNDATION FILL cu.m. 1.56
103(6) PIPE CULVERT & DRAIN EXCAVATION cu.m. 15.24
104(1)a EMBANKMENT (FILL) cu.m. 210.16 210.16
404(1)a1 REINFORCING STEEL BAR (GR. 40) kg. 10,188.86 10,188.86
404(1)b REINFORCING STEEL BAR (GR. 60) kg. 4,256.49 4,256.49
405(1)b3 STRUCTURAL CONCRETE, CLASS "A" cu.m. 223.51 223.51

502(1)a MANHOLE each 1.00

507(1) RUBBLE CONCRETE cu.m. 1,620.59 1,620.59

509(3)a STEEL SHEET PILE(Furnished, FSP -IV,A36) ln.m. 6,417.00 6,417.00

509(3)b STEEL SHEET PILE(Driven, FSP -IV,A36) ln.m. 6,417.00 6,417.00

Spl-1 SLOPE PREPARATION (CUT) cu.m. 6,217.45 6,217.45


Spl-2 GRAVEL BACKING cu.m. 872.33 872.33
Spl-3 BOULDER FILL cu.m. 94.16 94.16
Spl-4 CRANEWAY ln.m. 273.20 273.20

Spl-5 HEXAPOD cu.m. 177.63 177.63

CONCRETE RAILING m. - 273.20


RY OF QUANTITIES

REMARKS

RCCP = 1.99 cu.m.; MANHOLE = 0.45 cu.m.


RCCP
Compacted as per Item 104
ssp =
9m./pc,.Zx=8
74 cm^3/m,
L= 9m:
EXCAVATION
END
= 9.56 cu.m.
PROTECTION
= 18.00
+12.00+12.0
0

ssp =
9m./pc,.Zx=8
74 cm^3/m,
L= 9m:

END
PROTECTION
= 18.00
+12.00+12.0
0
Cut Volume
Compacted Material

Volume of Gravel Metalling = 394.98 cu.m. (5x 0.15m)


RSB = 905.2 Kgs.
CONCRETE = 92.008cu.m.
RSB = Kgs.
Name of Project:
Location:

CUT FILL BF
STATION DIST.
Area Volume Area Volume Area Volume
+ 263.60 23.23 0.39 0.00
16.40 418.38 7.72 0.00
+ 280.00 27.79 0.55 0.00
20.00 589.51 5.50 0.00
+ 300.00 31.16 0.00 0.00
20.00 611.03 2.06 0.00
+ 320.00 29.95 0.21 0.00
20.00 595.62 4.12 0.00
+ 340.00 29.62 0.21 0.00
20.00 551.58 2.06 0.00
+ 360.00 25.54 0.00 0.00
20.00 439.04 5.71 0.00
+ 380.00 18.36 0.57 0.00
20.00 299.95 15.37 12.44
+ 400.00 11.63 0.97 1.24
20.00 428.72 18.42 12.44
+ 420.00 31.24 0.88 0.00
20.00 515.00 18.20 4.32
+ 440.00 20.26 0.94 0.43
20.00 398.32 20.97 9.24
+ 460.00 19.57 1.15 0.49
20.00 373.04 28.80 11.45
+ 480.00 17.73 1.73 0.65
20.00 362.69 32.00 12.36
+ 500.00 18.54 1.47 0.58
20.00 381.09 26.26 10.75
+ 520.00 19.57 1.15 0.49
16.80 253.48 22.97 21.16
+ 536.80 10.60 1.58 2.03
23.20 270.57 29.29 40.53
+ 560.00 12.72 0.94 1.47
20.00 247.27 20.97 31.13
+ 580.00 12.01 1.15 1.65
20.00 236.57 24.12 33.84
+ 600.00 11.65 1.26 1.74
20.00 213.51 31.34 40.34
+ 620.00 9.70 1.88 2.30
20.00 194.00 37.50 45.91
+ 640.00 9.70 1.88 2.30
20.00 179.92 42.79 50.94
+ 660.00 8.29 2.40 2.80
20.00 165.84 48.08 55.98
+ 680.00 8.29 2.40 2.80
20.00 185.52 40.94 49.25
+ 700.00 10.26 1.69 2.13
20.00 206.34 33.14 42.19
+ 720.00 10.37 1.62 2.09
20.00 207.48 32.48 41.86
+ 740.00 10.37 1.62 2.09
SUB TOTAL 273.20 6,217.45 210.16 94.16
say:
CUT = 6,217.45 cu.m. 6,218.00 cu.m. Slope Preparation
FILL = 210.16 cu.m. 211.00 cu.m. embankment
BF = 94.16 cu.m. 95.00 cu.m. Boulder Fill
GB = 872.33 cu.m. 873.00 cu.m. gravel backing
item 405 = 223.51 cu.m. 224.00 cu.m. Structural Concrete Class "A"
item 507 = 1,620.59 cu.m. 1,621.00 cu.m. rubble concrete
item 200 = 54.64 cu.m. 55.00 cu.m. aggregate sub base course

HEXAPODS = 177.63 X 35% = 62.00 pcs.


CONCRETE 62.00 X 1.48 = 92.01 cu.m.
RSB 62.00 X 14.60 = 905.20 kgs.
L = 273.20 m. length of project
L = 9.00 m. length of piles
NO. OF PILES: L = 9.00 m.
273.20
no. of piles = = 683.00 pcs. X 9.00 m. = 6,147.00
0.4
total = 6,147.00
GB 405.00 507.00
Area Volume Area Volume Area Volume
3.19 0.82 5.93
52.37 13.43 97.27
3.19 0.82 5.93
63.86 16.38 118.62
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
53.64 13.74 99.66
3.19 0.82 5.93
74.08 18.98 137.62
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
63.86 16.36 118.64
3.19 0.82 5.93
872.33 223.51 1,620.59

Craneway
Length of project =
Width of craneway =
Thickness of craneway =
ln.m.
ln.m.
Name of Project:
Location:

GIVEN:
Size of Pile Cap = 0.50x0.50mx980Pile Cap
WIDTH OF FSP-III = 0.40 m. @ 9 lin.m./pc.
LENGTH OF PROJECT = = 273.20 m.
S OF STIRRUPS = 0.20 m.
REINFORCING STEEL BARS:
@PIL'E CAP # OF PCS. DIAMETERUNIT WT. WT. LENGTH A B C
(kg./m.) (kg.) (mm)
STIRRUP 1366 12 0.888 1,989.33 1,640.00 120 350 350
Longitudinal BARS 7 16 1.578 273,100.00
159.366667 16 1.578 3,017.77 12,000.00 Given , Length of RSB
SPLICE 159.366667 16 1.578 160.95 640.00
DOWELS BARS 1366 16 1.578 1,077.77 500.00

CONCRETE SLOPE
TRANS TOP 1821.33333 12 0.888 3,016.35 1,865.00 120 1125 500
TRANS BOT. 1366 12 0.888 2,116.70 1,745.00 120 300 925
LONGITUDINAL 12 12 0.888 273,100.00
273.20 12 0.888 2,911.22 12,000.00 Given length of RSB
273.20 12 0.888 155.27 640.00
TOTAL = 14,445.35 kgs.
say 14,446.00 kgs.

grade 40 = 10,188.86 say 10,189.00


grade 60 = 4,256.49 say 4,257.00
D E F STIRRUP

350 350 120

of RSB STR

120
200 200

STR
Name of Project: AND DRAINAGE SYSTEM
Location:

STATION DESCRIPTION 103-(3) 103-(6) 500(1) REMARKS


INSTALL 1L- 610 MM x 15.00M RCCP 43.50
545 + 880.00 2 - 910 mm x 15 m RCCP 5.340 - 15 PROVIDE MANHOLE@ RS
43.50
INSTALL 1L- 610 MM x 8.00M RCCP
546 + 400.00 1 - 610 mm x 8 m RCCP 1.328 15.24 8 PROVIDE MANHOLE@ RS

SUBTOTAL 1.328 15.240 8.000

TO ESTIMATE 1.40 15.30

Project Length: 273.20


Name of Project:
Location:
Area, Item 103-
Length, Item
(6) Pipe
103-(3)
Station Culvert & Trench Width Multiplier
FOUNDATION
drainage
FILL
Excavation
545+880 15.00 0.00 3.56 0.10
546+400 8.00 9.18 1.66 0.10
TOTAL

Item 103 - 3: Foundation Fill =

SAY

Item 103 - 6: Pipe Culvert & Drain Excavation =

SAY
VOLUME

Pipe Culvert &


Foundation Fill
Drain Excav.

5.340 -
1.328 15.24
1.33 15.24

1.33

1.40 CU.M.

15.24

15.30 CU.M.

273.20 273.20
Name of Project: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION AND DRAINAGE STRUCTURES AND DRAINAGE SYSTEM
Location: LAL-LO, CAGAYAN

STONE MASONRY (WITHIN PIPE)


RIGHT SIDE

Stone Masonry Excavation


Area Pipe Length Parapet VOL. OF PIPE TO BE
STATION DIST. HT. SUBTRACTED FOR Total Vol.
Multiplier across SM Volume HEADWALLS

Area Volume Area Volume


0 + 341.78 3.00 3.565 2.60
3.45 12.30 8.97 1.02 1.20 0.863 1.22 11.94
0 + 345.23 3.00 3.565 2.60
12.30 8.97 0.86 1.22 11.94

SUMMARY
Page Vol. of Headwall Vol of Excavation
1 11.94 cu.m. 8.97 cu.m.
Total 11.94 cu.m. 8.97 cu.m.

20
0
Err:509

D R A I NA G E S C H E D U L E

STATION DESCRIPTION 103-3 103-6 500 504-1b

532 + 409.00 2 - 910 mm x 20 m RCCP 7.12 183.27 40 17.00

532 + 487.50 2 - 910 mm x 22 m RCCP 7.83 136.95 44 11.00

14.95 320.22 84.00 28.00

TO ESTIMATE 15.00 325.00 84.00 28.00


DULE
REMARKS
REMOVE & REPLACE EXISTING 1-610MM X 17.00M. RCCP BY 2-910MM X 22.00M.
RCCP.

REMOVE & REPLACE EXISTING 1-610MM X 11.00M. RCCP BY 2-910MM X 22.00M.


RCCP.
0
Err:509

VOLUME
Station Length, Item 103-3 Area, Item 103-6 Trench Width Thickness Pipe Culvert & Drain
Foundation Fill
Excav.
532 + 409 20.00 51.48 3.56 0.10 7.12 183.27
532 + 487.5 22.00 38.47 3.56 0.10 7.83 136.95
42.00 14.95 320.22

Item 103 - 3: Foundation Fill = 14.95

SAY 15.00 CU.M.

Item 103 - 6: Pipe Culvert & Drain Excavation = 320.22

SAY 325.00 CU.M.


RIGHT SIDE excavation
height description
station height excav
546 + 400 2.22 2.48

SUB TOTAL

SUMMARY EXCAVATION 5.58


FOUNDATION FILL 0.23
RSB 193.59
CONCRETE 2.99
# OF PCS 1.00
excavation concrete rsb
vol excav vol u bar ties cover wt
5.58 2.99 105.49 78.85 9.24 193.59

5.58 2.99 193.59

Project Length: 273.20


foundation fill # of pcs

0.225 1

0.23 1.00
Name of Project:
Location:

ITEM 311(1)a: PROTLAND CEMENT CONCRETE PAVEMENT (un


STATION LIMIT
STATION 546 + 263.60 - 546 + 536.80
TOTAL

273.20 x 2

TOTAL
ETE PAVEMENT (unreinforced)(0.15m THK)
LENGTH (M.)
273.20
= 273.20

= 546.40 SQ.M.

546.40
SAY = 547.00 SQ.M.

Project Length: 273.20


972.80
CONCRETE(cu.m)
GUARD RAIL
COLUMN BEAM
STATION DISTANCE PCS VOL LENGTH VOL
546 + 263.6
273.2 138 7.76 238.7 7.16
546 + 536.8
TOTAL 273.2 7.76 7.16

Item no. 404(1)a Reinforcing Steel : 2640.18


Item no. 405(1)a3 Structural Concrete : 14.92
LENGTH OF RSB RSB(kgs)
COLUMN BEAM COLUMN BEAM
VERTICAL TIES HOR. STIRRUP 12mm 10mm 12mm 10mm

717.6 1030.86 954.8 844.29 637.23 635.01 847.86 520.0826

637.23 635.01 847.86 520.08

Project Length: 273.20


kgs
cu.m