Control de riesgos
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 1
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
ndice
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 2
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Una vez revisados los conceptos anteriores, se abordar una aproximacin al tema
del uso de herramientas computacionales para reconocer de manera general sus
capacidades y la conveniencia de utilizarlas en los procesos de anlisis y
administracin de riesgos.
Temario
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 3
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Marzo 2008
Los derechos mineros a extraer petrleo fueron comprados por BP en la venta de
Manejo de Minerales del Servicio de Arrendamiento # 206, que se celebr en el
estadio Superdome de Luisiana en Nueva Orleans.
Febrero 2009
BP presenta en 52 pginas un plan de exploracin y de impacto ambiental del pozo
Macondo, localizado en el Can del Mississippi del bloque 252 en el sector
estadounidense del Golfo de Mxico, cerca de 41 millas (66 km) de la costa de
Luisiana, con el Servicio de Manejo de Minerales (MMS), un brazo del
Departamento del Interior de Estados Unidos que supervisa la perforacin mar
adentro. Segn el plan, era "poco probable que un derrame accidental de petrleo
superficial o subterrneo ocurriera a raz de las actividades propuestas". En el caso
de un accidente se llevara a cabo el plan indicado que, debido a que el pozo est
a 48 millas (77 km) de la costa y a que se cuenta con la capacidad de respuesta
necesaria, no se esperaran impactos adversos significativos. El Departamento de
Interior eximi a la operacin de perforacin del Golfo de Mxico de BP de un
estudio de impacto ambiental detallado despus de concluir que un derrame masivo
de petrleo era poco probable.
Octubre 7, 2009
BP comienza la perforacin del pozo Macondo con la plataforma "Marianas".
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 4
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Noviembre 9, 2009
El huracn Ida daa la plataforma lo suficiente como para tener que ser
reemplazada.
Febrero 2010
Equipo de perforacin Horizonte en Aguas Profundas, propiedad de Transocean,
comienza la perforacin en una profundidad de agua de aproximadamente 5,000
pies (1,500 m) en la perspectiva Macondo. El pozo planificado iba a ser taladrado a
18,000 pies (5,500 m) por debajo del nivel del mar, y se pretenda conectarlo y
suspenderlo para su posterior explotacin submarina.
Marzo 2010
Fecha prevista para la terminacin del pozo que se haba presupuestado un costo
de $ 96 millones.
Abril 2010
Marvin Volek, empleado de Halliburton advierte que el uso de BP de cemento
"estaba en contra de nuestras mejores prcticas."
BP perfora la ltima seccin del pozo 18,360 pies (5,564 metros) bajo el nivel del
mar, pero los ltimos 1,192 metros necesitan ser envueltos. Halliburton
recomienda una cubierta carcasa Alineadora / Abrazadera que proporcionan 4
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 5
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
barreras redundantes al flujo. BP elige hacer una sola lnea con menos barreras
que es ms rpido de instalar y de $7 a $10 millones ms barato.
El informe de Gagliano dice que "se considera que el pozo tiene un problema de
flujo de gas SEVERO". Schlumberger opera con una tripulacin para llevar
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 6
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Respuesta al derrame
Abril 2010
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 7
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
BP reporta una fuga de 1,000 barriles (42,000 galones de los EE.UU.; 160 mil
litros) al da.
Un brillo de aceite se ve que cubre 580 millas cuadradas (1,500 km2) y est a 70
kilmetros al sur de las costas de Mississippi y Alabama y fue de 31 millas (50
kilmetros) de las Islas Chandeleur de alta sensibilidad ecolgica. BP inicia el
proceso para crear dos pozos de alivio.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to the 8
Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc., 2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Mayo 2010
BP anunci que la ms pequea de las tres fugas conocida haba sido limitada.
Esto no redujo la cantidad de petrleo que flua hacia fuera, pero se permiti que
el grupo de reparacin centrara sus esfuerzos en las dos fugas restantes.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 10
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Obama firma una orden ejecutiva que establece la Comisin Nacional bipartita
sobre el derrame de petrleo y perforacin mar adentro de Horizonte en Aguas
Profundas de BP, con el ex Gobernador de la Florida, el senador Bob Graham y el
ex administrador de la Agencia de Proteccin Ambiental de William K. Reilly como
co-presidentes. El propsito de la comisin es "considerar las causas de la
catstrofe y ofrecer opciones en materia de seguridad y las precauciones
ambientales".
BP anuncia el plan para forzar que barro pesado avance con el barreno en un
proyecto llamado "matar arriba".
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 11
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
El fiscal general de Estados Unidos, Eric Holder dijo que su oficina iba a investigar
el posible procesamiento criminal. Especficamente dijo que estn investigando
Ley de Agua Limpia, Ley de Contaminacin por Petrleo de 1990, Tratado de Aves
Migratorias, as como la Ley de Especies Amenazadas. Mary Landry
contralmirante de la Guardia Costera se retira como Coordinador Federal en el
lugar del siniestro y es sucedida por su ayudante James A. Watson. La temporada
2010 de huracanes del Atlntico comienza.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 12
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Obama en su tercer viaje a Luisiana desde que el desastre comenz, visita Grand
Isle, Luisiana por segunda vez en dos semanas y critica a BP por el pago de $ 50
millones para la publicidad televisiva y la planificacin a pagar de $ 10,5 mil
millones en dividendos trimestrales. Obama en su discurso semanal por radio, dijo
que 20,000 personas estn involucradas, se ha autorizado el despliegue de 17,500
soldados de la Guardia Nacional, que 1,900 barcos estaban trabajando en el
derrame y 4,3 millones de pies (1,303 km) de boyas se haban desplegado. Thad
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 13
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Tanto la Guardia Costera como BP dicen que el aspirador captura 10 mil barriles
(420,000 galones de los EE.UU.; 1,6 millones de litros) al da. The Daily Mail
public en un artculo: "Tuve suerte si hice $ 1,000 al mes antes del derrame. BP
Ahora me paga 1,200 dlares al da ": los pescadores sacan el mayor provecho
del vertido de petrleo del Golfo" lo cual detalla cmo algunos locales como los
pescadores se estn beneficiando de la catstrofe, sealando que en la industria
pesquera del Golfo han estado disminuyendo antes del derrame. El documento
tambin informa que los registros del gobierno indican que han sido 491 las aves
muertas, 227 tortugas muertas y 31 mamferos muertos, entre ellos delfines. A
diferencia de The New York Times que informa en un artculo titulado "BP paga los
reclamos, pero la satisfaccin no est incluida. BP cuenta con 25 oficinas de
reclamaciones a travs del Golfo y ha pagado $ 46 millones a 17,500 residentes.
BP dijo que todava est procesando otras 17,500 reclamaciones ms. BP est
pagando a capitanes de barcos de pesca 5,000 dlares / mes y a marineros de
cubierta de 2,500 dlares. El gobernador de Mississippi, Haley Barbour, le dice a
"Fox News Sunday" que "no hemos tenido prcticamente ningn aceite". Acaban
en la costa de Mississippi. Hayward dice a la BBC que no ha hablado directamente
con Obama desde que el derrame comenz. Hayward dice que los cientficos de
BP no tienen "ninguna evidencia" de plumas.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 14
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Subtemas
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 15
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
6. Documentacin de riesgos
Este proceso mejora la eficiencia del enfoque de riesgos a lo largo del ciclo de vida
del proyecto y as optimizar de manera continua las respuestas a los riesgos.
Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management
Institute, Inc., 2013, Figure 11-21, page 349.
ste proceso se desarrolla de manera continua durante el ciclo de vida del proyecto,
puesto que los riesgos van mutando conforme se cumplen las etapas del mismo y
nuevos roles o funciones son desempeadas por los agentes de la organizacin
que desarrolla el proyecto.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 17
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Es por esto, que la estrecha comunicacin entre los responsables de cada riesgo y
el administrador de proyectos, es clave para el control.
Controlar un riesgo implica activar planes de contingencia, corregir los efectos del
riesgo, e incluso, cambiar el proyecto mismo.
La validacin de supuestos.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 18
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Durante la ejecucin del proyecto se observan las variables que se relacionan con
el desempeo del mismo. El monitoreo y control de riesgos permite detectar
riesgos que al inicio no haban sido considerados o juzgados como probables. Para
estos riesgos recin definidos hay que aplicar toda la metodologa del anlisis de
riesgos y en consecuencia, delinear sus respectivos planes de respuesta al mismo.
Todo lo anterior se plasma en cada actualizacin del plan de administracin
del proyecto.
Informacin sobre el desempeo del trabajo: Da cuenta, entre otras cosas, del
estado de los entregables, del avance del programa, de los costos incurridos, de la
bitcora de problemas, de las advertencias de peligro, de las notificaciones de
escalamiento, de las listas de acciones y casos de contingencia.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 19
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Estos datos pueden ser afectados por las tareas para controlar el desempeo.
Todas las reuniones de equipo deben tener como tema principal el analizar el
riesgo del proyecto. Por otro lado, los cambios conllevan a ulteriores anlisis
cualitativos y cuantitativos bajo los nuevos escenarios planteados.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 20
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Lo que es importante es que el equipo debe tener claro cmo se har y cules son
los objetivos de las auditoras de riesgos del proyecto.
Toda desviacin con respecto a los planes son pistas que indican qu tan cerca
se est de las metas inicialmente propuestas desde el punto de vista tcnico.
- Anlisis de reserva: Los riesgos tienen siempre una consecuencia en las reservas
que se hicieron para enfrentar contingencias.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 21
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
- Reuniones sobre el estado del proyecto: Cada reunin sobre el estado del
proyecto debe aprovecharse para incluir un tiempo de anlisis y toma de
decisiones relacionadas con la administracin de los riesgos del proyecto.
La habilidad de dar seguimiento y responder a los riesgos es algo que mejora con
la prctica. Al analizar el estado del proyecto, el equipo debe participar en los
siguientes puntos relacionados con la administracin de riesgos:
Monitoreo de riesgos.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 22
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 23
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
La clasificacin de riesgos debe ser reevaluada de tal forma que los riesgos
nuevos y los importantes puedan ser controlados apropiadamente.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 24
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 25
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Al cierre del proyecto se generan las versiones finales del registro de riesgos y de
los formatos del plan de administracin de riesgos, sus respectivas listas de control
y la estructura de desglose de riesgos
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 26
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 27
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 28
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 29
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 30
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
La intencin de este tema, es brindar una visin general de cmo los paquetes
computacionales pueden ser de utilidad simplificando y profundizando las tareas de
anlisis para la toma de decisiones con aplicacin especfica en la administracin
de los riesgos.
Subtemas
Por ello es importante contar con los medios para adelantarse a esta posibilidad
e implicar las consecuencias de demorar actividades y su impacto en los costos.
Cabe mencionar que este curso no recomienda ningn software en particular, sino
que se mencionan algunos de manera especfica como ilustracin del poder que
han desarrollado y cmo podran ser aplicados tanto en el anlisis de riesgos como
en el proceso de administracin de riesgos.
- MS Project Manager
- Primavera, entre otros.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 32
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
- @Risk
- Oracle Crystal Ball
- Vanguard System
- RENO
- GoldSim
Otro grupo se enfoca a la administracin del riesgo como una funcin integral,
enlazada a la operacin de la empresa. Como ejemplo encontramos a Enterprise
Risk Register.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 33
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Dado que el campo es muy extenso, y con la idea de dar un vistazo que aclare la
aplicacin de las herramientas computacionales, solo se expondr la descripcin
de un sistema computacional de apoyo al anlisis de riesgos.
Para saber ms
En cierto sentido, GoldSim es como una hoja de clculo "visual" que le permite
crear y manipular los datos y ecuaciones de forma muy grfica.
Como puede verse en el ejemplo anterior basado en cmo los distintos objetos en
el modelo estn relacionados, de forma automtica indica GoldSim sus influencias
e interdependencias conectndolas visualmente de una manera apropiada.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 35
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Elementos GoldSim
Los datos.
Como se ver ms adelante, puede vincular estos objetos para hojas de clculo y
bases de datos a fin de importar datos.
Elementos de funcin
Requieren una o varias entradas para realizar un clculo con stas y generan una
o ms salidas.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 37
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
En forma similar, en una celda de una hoja de clculo cuando se define una
expresin, se pueden utilizar una amplia variedad de operadores y funciones
matemticas. Incluso emplear operadores condicionales como: >, <, = y "si,
entonces". Ejemplo:
Tabla de bsqueda: define una superficie de respuesta que especifica cmo una
salida vara en funcin de hasta tres entradas. Esto quiere decir que la superficie de
respuesta puede tener 1, 2 3 dimensiones.
Ejemplo 1: Embalse
El retraso del material acepta como entrada de un flujo de material, por ejemplo:
litros / da, $ / ao, reproductores / hr. Y se mueve a travs de una cinta
transportadora o conducto y luego el flujo de salidas.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 39
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Estos pasos se presentan a travs de una animacin en ingls, que puede verse
en:
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 40
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Dimensiones y unidades
Cuando los elementos se han creado y los datos se han ingresado en GoldSim,
las dimensiones y las unidades han sido especificadas, ya que una de las
caractersticas ms potentes de esta herramienta es que el programa es
dimensionalmente consciente.
Los modelos complejos GoldSim pueden tener cientos o miles de elementos y con
el fin de gestionar, organizar y ver un modelo, es esencial agrupar los elementos
en subsistemas.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 41
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Qu es un contenedor?
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 42
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Se puede observar que GoldSim proporciona una vista del navegador del sistema
que se est modelando, de modo que la jerarqua del sistema puede ser visto
como un rbol:
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 43
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Por ejemplo, crear un elemento que representa los ingresos de la empresa para
cada uno de los ltimos cinco aos, o un elemento que represente la poblacin de
salmones en cada uno de 20 arroyos.
Para hacer frente a este tipo de problemas, GoldSim permite crear y manipular
vectores y matrices (denominadas colectivamente como matrices).
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 44
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Por ejemplo,
Para este ejemplo, esto convertira la matriz (una matriz 2-D) a un vector (una matriz
de 1-D), que representa la poblacin de salmones total (agregado para todas las
corrientes) para cada ao.
En cuanto a bases de datos, permite tambin que los elementos de entrada sean
vinculados directamente a una base de datos compatibles con ODBC (Open Data
Base Connectivity, por sus siglas en ingls).
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 46
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Una vez definido el vnculo, se podr instruir a GoldSim para que descargue los
datos en cualquier momento e internamente registre la hora y fecha en que ocurri
la descarga.
Debe tenerse en cuenta que esta capacidad aumenta en gran medida el poder y la
flexibilidad de la herramienta empleada, lo que permite que casi cualquier
programa pueda vincularse dinmicamente con GoldSim.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 48
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Esto incluye:
Por ejemplo: elementos que han cambiado, cules fueron los elementos
eliminados?, elementos que se han aadido, entre otras cosas.
Permite tambin establecer una condicin de activacin (por ejemplo, "X <0 o Y
<0") que hace que el modelo pueda hacer una pausa y mostrar un mensaje
definido por el usuario, posteriormente se puede explorar y ver el resultado hasta
la fecha.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 50
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Esto incluye:
Esto puede ser til si se conocen los principios de la simulacin, los parmetros
que cambian rpidamente, y por lo tanto, necesita un intervalo de tiempo ms
pequeo.
Por ejemplo, se podra preparar GoldSim para que utilice un intervalo de tiempo
de 1 da si X es mayor que Y, y de 10 das si X es inferior o igual a Y.
Por ejemplo, si una parte del modelo presenta una dinmica de cambio muy
rpida (lo que requiere una intervalo de tiempo de 1 da), mientras que el resto
del modelo representado cambia lentamente (lo que requiere una intervalo de
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 51
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Optimizacin de modelos
Para este tipo de corridas, se especifica una funcin objetivo (un resultado
especfico que se desea minimizar o maximizar), una restriccin opcional (una
condicin que debe cumplirse), y una o ms variables de optimizacin (variables
en el modelo que tienen control sobre ellos).
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 52
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Optimizacin de modelos
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 53
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Anlisis de sensibilidad
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 54
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Se pueden:
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 55
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Capacidades de presentacin
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 56
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
La interfaz permite que el modelo sea utilizado fcilmente por alguien sin que tenga
que estar familiarizado tanto con el entorno de modelado GoldSim o los detalles
del modelo especfico.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 57
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los usuarios no necesitan tener una versin con licencia de esta herramienta
computacional para ver y ejecutar un modelo tipo "tablero de control", simplemente
es necesario descargar el reproductor gratuito GoldSim.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 58
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 59
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Si ese reto no se logra, no tiene sentido til sino al contrario, es perjudicial utilizar el
modelo para representar al sistema.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 60
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.
Una atencin adecuada a los riesgos del proyecto permitir tener al proyecto bajo
control y a todos sus riesgos en una situacin tal que stos sean controlables o
manejables. La aplicacin correcta de los procesos de entrada, salida,
herramientas, y tcnicas de la administracin de los proyectos sern clave para el
xito del proyecto.
Los materiales utilizados en el curso Control de riesgos estn basados en Project Management Institute, A Guide to 61
the Project Management Body of Knowledge (PMBOK Guide) -Fifth Edition, Project Management Institute, Inc.,
2013.
* Las definiciones son tomadas del Glossary of the Project Management Institute, A Guide to the Project Management
Body of Knowledge, (PMBOK Guide) Fifth Edition, Project Management Institute, Inc., 2013.
PMP, PgMP, CAPM, PMBOK y PMI son marca registrada del Project Management Institute, Inc.