Prod Bandwi Cus

Circle Lead ID Segment Lat Long


uct dth N

EN
Himachal Green 31.10263 77.17950 COMMU
PRI 2 MBPS
Pradesh Channel 309 064 SP
LIM

Prod Bandwi C
Circle Lead ID Segment Lat Long
uct dth

Operation
and 31.42902 75.71260 INDI
Punjab MPLS 256 KBPS
Maintenanc 059 679
e

NO UBR is running at customer end. LOS clear with 12M (Mast) from BTS 1(GSM: N_PB_CHO_001, 3G:
N_PJB_3G_CHOM_COV_0001).AC is available and Battery bank is available. NO UBR is running at BTS 1(GSM:
N_PB_CHO_001, 3G: N_PJB_3G_CHOM_COV_0001).
LOS clear with 6M (Mast) from BTS 2(N_PB_ADM_001).AC is working and Battery Bank is available. 1UBR is running at
BTS 2(N_PB_ADM_001) with 65Deg. 1UBR running in customer direction with 65Deg.
Owner is ready for 6M & 12M pole installation. Representative at customer end is Shri Shyam Sunder
Gandhi(9814060440)

Dear Sir,

L2 feasibility survey for Yadu Corporation Private Limited( Hoshiarpur, Punjab) is completed.

Remarks:
1 UBR is running at customer end with 27M(Mast) at 35 Deg.LOS is clear with 30M(tower) GBT from BTS 1 (GSM:
N_PB_MKR_003 ).AC is working and Battery bank is available. No UBR is running at BTS 1(GSM: N_PB_MKR_003). LOS is
clear with 30M(tower) GBT from BTS 2(CDMA: CBPJ_51, GSM: N_PB_MKR_001).AC is working and Battery bank is
available. 2 UBR is running at BTS 2(CDMA: CBPJ_51, GSM: N_PB_MKR_001) with 345Deg. 1UBR running in customer
direction with 345Deg. Owner is ready for 30M GBT tower installation. Representative at customer end is Mr. Vijay
(9115110507)

Note:- Owner building is under construction mode so he wants to remove the existing Mast from RoofTop. And owner is
saying to install the GBT tower for connectivity.

Thanks and Regards

Manish Gupta

Arden Tele Services LLP

1 UBR is running at customer end. LOS is clear with 15M(Mast) from BTS 1 (CDMA: CBHP_1006).AC is working and Battery
bank is available. 3 UBR are running at BTS 1(CDMA: CBHP_1006). 1 UBR is running in customer direction. LOS is clear
with 18M (Mast) from BTS 2(CDMA: CBHP_1012).AC is working and Battery bank is available. 1 UBR is running at BTS
2(CDMA: CBHP_1012) in customer direction. LOS is clear with 21M (Mast) from BTS 3(CDMA: CBHP_1004).AC is working
and Battery bank is available. No UBR is running at BTS 3(CDMA: CBHP_1004). Representative at customer end is
Mr. Ashok Tribhuwan (9222230118).

Note: L2 survey completed for ENSER COMMUNICATIONS PRIVATE LIMITED. But the
customer end is a Tinshade structure so we cannot mount 18M mast on it and there
is no space in ground also .So the feasibility for this site is not clear.