Himachal Green 31.10263 77.17950 COMMU
PRI 2 MBPS
Pradesh Channel 309 064 SP
LIM
Prod Bandwi C
Circle Lead ID Segment Lat Long
uct dth
Operation
and 31.42902 75.71260 INDI
Punjab MPLS 256 KBPS
Maintenanc 059 679
e
NO UBR is running at customer end. LOS clear with 12M (Mast) from BTS 1(GSM: N_PB_CHO_001, 3G:
N_PJB_3G_CHOM_COV_0001).AC is available and Battery bank is available. NO UBR is running at BTS 1(GSM:
N_PB_CHO_001, 3G: N_PJB_3G_CHOM_COV_0001).
LOS clear with 6M (Mast) from BTS 2(N_PB_ADM_001).AC is working and Battery Bank is available. 1UBR is running at
BTS 2(N_PB_ADM_001) with 65Deg. 1UBR running in customer direction with 65Deg.
Owner is ready for 6M & 12M pole installation. Representative at customer end is Shri Shyam Sunder
Gandhi(9814060440)
Dear Sir,
L2 feasibility survey for Yadu Corporation Private Limited( Hoshiarpur, Punjab) is completed.
Remarks:
1 UBR is running at customer end with 27M(Mast) at 35 Deg.LOS is clear with 30M(tower) GBT from BTS 1 (GSM:
N_PB_MKR_003 ).AC is working and Battery bank is available. No UBR is running at BTS 1(GSM: N_PB_MKR_003). LOS is
clear with 30M(tower) GBT from BTS 2(CDMA: CBPJ_51, GSM: N_PB_MKR_001).AC is working and Battery bank is
available. 2 UBR is running at BTS 2(CDMA: CBPJ_51, GSM: N_PB_MKR_001) with 345Deg. 1UBR running in customer
direction with 345Deg. Owner is ready for 30M GBT tower installation. Representative at customer end is Mr. Vijay
(9115110507)
Note:- Owner building is under construction mode so he wants to remove the existing Mast from RoofTop. And owner is
saying to install the GBT tower for connectivity.
Manish Gupta
1 UBR is running at customer end. LOS is clear with 15M(Mast) from BTS 1 (CDMA: CBHP_1006).AC is working and Battery
bank is available. 3 UBR are running at BTS 1(CDMA: CBHP_1006). 1 UBR is running in customer direction. LOS is clear
with 18M (Mast) from BTS 2(CDMA: CBHP_1012).AC is working and Battery bank is available. 1 UBR is running at BTS
2(CDMA: CBHP_1012) in customer direction. LOS is clear with 21M (Mast) from BTS 3(CDMA: CBHP_1004).AC is working
and Battery bank is available. No UBR is running at BTS 3(CDMA: CBHP_1004). Representative at customer end is
Mr. Ashok Tribhuwan (9222230118).
Note: L2 survey completed for ENSER COMMUNICATIONS PRIVATE LIMITED. But the
customer end is a Tinshade structure so we cannot mount 18M mast on it and there
is no space in ground also .So the feasibility for this site is not clear.