H = 7.10 M
1. DATOS DE ENTRADA
DIMENSIONAMIENTO PLANTEADO DEBIDO A RESTRICCIONES
Datos de Suelo DEL TERRENO EN AMBOS LADOS
= 1.80 tn/m3 = 1.80 tn/m3
= 32 = 32
suelo = 0.80 kg/cm2
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
Ka
Wa = 0.30 1800 8.1 4374 kg/m
Kp
Wp = 3.00 1800.00 2.70 = 14580 kg/m
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
B MresM act
e=
2 P = 35887.8 = 17032.266670687
P = 35,887.80 kg 2 1.05
d = Mo/P 1.054 m
e = B/2 - d 0.521 m
kp
wu = 1.8 0.30 1800 7.1 = 6,901.20 kg/m
d Vu
Vc = 0.85 0.53 14.49137675 100 65 = 42,434.37 > 24,499.26 CORRECTO
b x d = 100 x 65
Ka s h
M max /2= ( )
6
x1.7 x(5h c )3 K a =tan 2 45 ( 2 )
=
v
hc = 1.4
Lc = 2.05 m
Lc = hc + d usar Lc = 2.1 m
2 6 1/2" @ 0.25 m
A st =
3
1 3 3/8" @ 0.25 m
A st =
3
Abajo: = 0.0018 x 100 x 70 = 12.6 cm2 / m
DISEO DE LA PUNTA
=
wu = 1.67 17032.27 = 28443.88534 kg
Vu = Wu ( B3-d) = 25599.50 kg
b x d = 100 x 90
Vu = Wu ( B3-d) = -6651 kg
b x d = 100 x 90
Mu = Wu x B3xB3/ 2 = 5620.095
Refuerzo transversal
En cada cara 9
DISEO MUROS DE CONCRETO ARMADO
H = 6.50 M
= 32 = 32
suelo = 0.80 kg/cm2
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
Ka
Wa = 0.30 1800 7.5 4050 kg/m
Kp
Wp = 3.00 1800.00 2.70 = 14580 kg/m
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
27318 49121.7
B MresM act
e=
2 P = 27318 = 14168.0929056363
P = 27,318.00 kg 2 0.96
d = Mo/P 0.964 m
e = B/2 - d 0.461 m
kp
wu = 1.8 0.30 1800 6.5 = 6,318.00 kg/m
d Vu
Vc = 0.85 0.53 14.49137675 100 50 = 32,641.83 > 20,533.50 CORRECTO
b x d = 100 x 50
Ka s h
M max /2= ( )
6
x1.7 x(5h c )3 K a =tan 2 45 ( 2
= )
v
hc = 1.282
Lc = 1.78 m
Lc = hc + d usar Lc = 1.8 m
DISEO DE LA PUNTA
=
wu = 1.67 14168.09 = 23660.715152 kg
Vu = Wu ( B3-d) = 21294.64 kg
b x d = 100 x 90
Vu = Wu ( B3-d) = -9864 kg
b x d = 100 x 90
Mu = Wu x B3xB3/ 2 = 3082.5
Refuerzo transversal
En cada cara 9
DISEO MUROS DE CONCRETO ARMADO
H = 5.10 M
= 32 = 32
suelo = 0.80 kg/cm2
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
Ka
Wa = 0.30 1800 5.9 3186 kg/m
Kp
Wp = 3.00 1800.00 2.50 = 13500 kg/m
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
21426 36195.9
B MresM act
e=
2 P = 21426 = 7598.5816264917
P = 21,426.00 kg 2 1.41
d = Mo/P 1.410 m
e = B/2 - d -0.035 m
kp
wu = 1.8 0.30 1800 5.1 = 4,957.20 kg/m
d Vu
Vc = 0.85 0.53 14.49137675 100 40 = 26,113.46 > 12,640.86 CORRECTO
b x d = 100 x 40
Ka s h
M max /2= ( )
6
x1.7 x(5h c )3 K a =tan 2 45 ( 2
= )
v
hc = 1.006
Lc = 1.41 m
Lc = hc + d usar Lc = 1.5 m
DISEO DE LA PUNTA
=
wu = 1.67 7598.58 = 12689.631316 kg
Vu = Wu ( B3-d) = 13958.59 kg
b x d = 100 x 70
Vu = Wu ( B3-d) = -3880.8 kg
b x d = 100 x 70
Mu = Wu x B3xB3/ 2 = 2425.5
Refuerzo transversal
1. DATOS DE ENTRADA
Datos de Suelo
= 1.80 tn/m3 = 1.80
= 32 = 32
suelo = 0.80
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
W s/c = 0.30
E s/c = 90
M s/c = 531
Ka
Wa = 0.30
Ea = 3186
Ma = 9398.7
Kp
Wp = 3.00
Ep = 10260
Mp = 9747
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
Zonas L H
1 0.5 5.1 1800
5 1.8 300
B MresM act
e=
2 P
P = 19,482.00 kg
e = B/2 - d 0.319 m
kp
wu = 1.8 0.30 1800 5.1 =
Vu = 4957.20 2.55 =
Mu = 12640.86 1.7 =
d
Vc = 0.85 0.53 14.49137675 100 40
b x d = 100 x 40
K h
6 ( )
M max /2= a s x1.7 x(5h c )3 K a =tan 2 45( 2
= )
v
K h
6( )
M max /2= a s x1.7 x(5h c )3 K a =tan 2 45 ( 2 )
=
v
hc = 1.006
Lc = 1.41 m
Lc = hc + d usar Lc = 1.5 m
Refuerzo Horizontal As = t bt d
Arriba: = 0.0018 x 100 x 30 =
2/3 As
1/3As 2 3.6
A st =
3
1 1.8
A st =
3
Intermedio: = 0.0018 x 100 x 37.5 =
2 4.5
A st =
3
1 2.25
A st =
3
Abajo: = 0.0018 x 100 x 45 =
2 5.4
A st =
3
1 2.7
A st =
3
Acero de montaje: 36 36 x 1.59 = 57.24 < S
5/8" @ 0.25m
DISEO DE LA PUNTA
=
wu = 1.67 9226.29 = 15407.91073 kg
Mu = 15407.91073002 1.62 = 24960.82 kg.m
Vu = Wu ( B3-d) = 16948.70 kg
b x d = 100 x 70
Vu = Wu ( B3-d) = -3880.8 kg
b x d = 100 x 70
Mu = Wu x B3xB3/ 2 = 2425.5
Refuerzo transversal
tn/m3
kg/cm2
m
m
tn/m3
300 = 90 kg/m
5.90 = 531 kg
2.95 9398.7 kg
0.95 = 9747 kg
19482 34446.3
CORRECTO
CORRECTO
= 19482 = 9226.2938503095
2 1.06
0.922629385
0.319 CORRECTO
4,957.20 kg/m
12,640.86 Kg
21,489.46
Vu
= 26,113.46 > 12,640.86 CORRECTO
OK!
5.4 cm2 / m
8.1 cm2 / m
5.4 cm2 / m
6.75 cm2 / m
8.1 cm2 / m
cm2
8" @ 0.30m
8" @ 0.30 m
pulg cm area
3/8 0.95 0.71
1/2 1.27 1.27
5/8 1.59 1.99
3/4 1.91 2.87
1 2.54 5.07
DISEO MUROS DE CONCRETO ARMADO
H = 3.50 M
= 32 = 32
suelo = 0.80 kg/cm2
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
Ka
Wa = 0.30 1800 4.1 2214 kg/m
Kp
Wp = 3.00 1800.00 1.60 = 8640 kg/m
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
9630 8815.5
B MresM act
e=
2 P = 9630 = 8365.8904910366
P = 9,630.00 kg 2 0.58
d = Mo/P 0.576 m
e = B/2 - d 0.174 m
kp
wu = 1.8 0.30 1800 3.5 = 3,402.00 kg/m
d Vu
Vc = 0.85 0.53 14.49137675 100 25 = 16,320.91 > 5,953.50 CORRECTO
b x d = 100 x 25
Ka s h
M max /2= ( )
6
x1.7 x(5h c )3 K a =tan 2 45 ( 2)=
v
hc = 0.69
Lc = 0.94 m
Lc = hc + d usar Lc = 1.00 m
DISEO DE LA PUNTA
=
wu = 1.67 8365.89 = 13971.03712 kg
Vu = Wu ( B3-d) = 2794.21 kg
b x d = 100 x 50
Vu = Wu ( B3-d) = 0 kg
b x d = 100 x 50
Mu = Wu x B3xB3/ 2 = 1687.5
Refuerzo transversal
1. DATOS DE ENTRADA
Datos de Suelo
= 1.80 tn/m3 = 1.80 tn/m3
= 32 = 32
suelo = 0.80 kg/cm2
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
Ka
Wa = 0.30 1800 2.7 1458 kg/m
Kp
Wp = 3.00 1800.00 0.90 = 4860 kg/m
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
5604 4089.9
B MresM act
e=
2 P = 5604 = 5933.3182189172
P = 5,604.00 kg 2 0.47
d = Mo/P 0.472 m
e = B/2 - d 0.128 m
kp
wu = 1.8 0.30 1800 2.2 = 2,138.40 kg/m
d Vu
Vc = 0.85 0.53 14.49137675 100 20 = 13,056.73 > 2,352.24 CORRECTO
b x d = 100 x 20
Ka s h
M max /2= ( )
6
x1.7 x(5h c )3 K a =tan 2 45 ( 2)=
v
hc = 0.434
Lc = 0.63 m
Lc = hc + d usar Lc = 0.65 m
2 3 3/8" @ 0.30 m
A st =
3
1 1.5 3/8" @ 0.30 m
A st =
3
Abajo: = 0.0018 x 100 x 25 = 4.5 cm2 / m
2 3 3/8" @ 0.30 m
A st =
3
1 1.5 3/8" @ 0.30 m
A st =
3
Acero de montaje: 36 36 x0.71 = 34.2 < S
3/8" @ 0.30m
DISEO DE LA PUNTA
=
wu = 1.67 5933.32 = 9908.6414256 kg
Vu = Wu ( B3-d) = 495.43 kg
b x d = 100 x 40
Vu = Wu ( B3-d) = 892.8 kg
b x d = 100 x 40
Mu = Wu x B3xB3/ 2 = 1116
Refuerzo transversal
1. DATOS DE ENTRADA
Datos de Suelo
= 1.80 tn/m3 = 1.80 tn/m3
= 32 = 32
suelo = 0.80 kg/cm2
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
Ka
Wa = 0.30 1800 2 1080 kg/m
Ea = 1080 1 1080 kg
Kp
Wp = 3.00 1800.00 0.60 = 3240 kg/m
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
3012 1528.8
B MresM act
e=
2 P = 3012 = 5510.2915451895
P = 3,012.00 kg 2 0.27
d = Mo/P 0.273 m
e = B/2 - d 0.127 m
kp
wu = 1.8 0.30 1800 1.7 = 1,652.40 kg/m
d Vu
Vc = 0.85 0.53 14.49137675 100 15 = 9,792.55 > 1,404.54 CORRECTO
b x d = 100 x 15
Ka s h
M max /2= ( )
6
x1.7 x(5h c )3 K a =tan 2 45 ( 2)=
v
hc = 0.335
Lc = 0.49 m
Lc = hc + d usar Lc = 0.50 m
DISEO DE LA PUNTA
=
wu = 1.67 5510.29 = 9202.1868805 kg
Vu = Wu ( B3-d) = 920.22 kg
b x d = 100 x 20
Vu = Wu ( B3-d) = 658.8 kg
b x d = 100 x 20
Mu = Wu x B3xB3/ 2 = 296.46
Refuerzo transversal
1. DATOS DE ENTRADA
Datos de Suelo
= 1.80 tn/m3 = 1.80
= 32 = 32
suelo = 0.80
Ka = 0.30
Kp = 3.00
0.45
Datos de muro
W s/c = 0.30
E s/c = 90
M s/c = 144
Ka
Wa = 0.30
Ea = 864
Ma = 691.2
Kp
Wp = 3.00
Ep = 3240
Mp = 972
3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
Zonas L H
1 0.3 1.3 1800
5 1.8 300
B MresM act
e=
2 P
P = 2,349.00 kg
e = B/2 - d 0.035 m
kp
wu = 1.8 0.30 1800 1.3 =
Vu = 1263.60 0.65 =
Mu = 821.34 0.43333333 =
d
Vc = 0.85 0.53 14.49137675 100 10
b x d = 100 x 10
K h
6 ( )
M max /2= a s x1.7 x(5h c )3 K a =tan 2 45( 2)=
v
K h
6( )
M max /2= a s x1.7 x(5h c )3 K a =tan 2 45 ( 2
=)v
hc = 0.256
Lc = 0.36 m
Lc = hc + d usar Lc = 0.40 m
Refuerzo Horizontal As = t bt d
Arriba: = 0.0018 x 100 x 15 =
2/3 As
1/3As 2 1.8
A st =
3
1 0.9
A st =
3
Intermedio: = 0.0018 x 100 x 15 =
2 1.8
A st =
3
1 0.9
A st =
3
Abajo: = 0.0018 x 100 x 15 =
2 1.8
A st =
3
1 0.9
A st =
3
Acero de montaje: 36 36 x0.71 = 34.2 < S
3/8" @ 0.30m
DISEO DE LA PUNTA
=
wu = 1.67 3733.11 = 6234.2972051 kg
Mu = 6234.297205139 0.03125 = 194.82 kg.m
Vu = Wu ( B3-d) = 311.71 kg
b x d = 100 x 20
Vu = Wu ( B3-d) = 529.2 kg
b x d = 100 x 20
Mu = Wu x B3xB3/ 2 = 238.14
Refuerzo transversal
tn/m3
kg/cm2
m
m
tn/m3
300 = 90 kg/m
1.60 = 144 kg
0.8 691.2 kg
0.3 = 972 kg
2349 1028.475
CORRECTO
CORRECTO
= 2349 = 3733.1120988857
2 0.31
0.3733112099
0.035 CORRECTO
1,263.60 kg/m
821.34 Kg
355.91
Vu
= 6,528.37 > 821.34 CORRECTO
cm2
OK!
2.7 cm2 / m
2.7 cm2 / m
2.7 cm2 / m
2.7 cm2 / m
2.7 cm2 / m
cm2
2" @ 0.25m
2" @ 0.30m
pulg cm area
3/8 0.95 0.71
1/2 1.27 1.27
5/8 1.59 1.99
3/4 1.91 2.87
1 2.54 5.07