Академический Документы
Профессиональный Документы
Культура Документы
Contents
Introduction
This new joiner document helps newly on-boarded employees of Rio testing team
in obtaining the access and to get an over view of varies tool used in testing
process.
Acquire Employee ID / v- Id
Complete Security 101 Training within 5 days from onboarding and update
1. Access Details
Access to various systems is documented in this section.
Double click on the item and select save settings button and select
language English- US
Click on join a SG
Select and click on Join. Next click on submit. An email will be sent
within 24 hours to confirm the VSTF access approval.
Once Access is provided do the following to connect to RIO project
in VSTF
Please follow the Steps to add new server SESIT in VSTF to track
FQR15 work items
Open Visual Studio
Run the file and click Install SAP Gui 7.30 under step 1.
SAP GRC request Procedure (For Production DO NOT raise access unless
approved by your Lead)
Please check with your POC to find out the list of systems for which the access
need to be raised. Below is the procedure to raise GRC requests MS1, MS2, MSU
and MST systems & Roles (sample).
You will get the screen as below. For the SAP Access click on Access
Requests/Model User.
Click on Next.
Give the model user as v-naveem (Confirm the model user to be entered
with the POCs. Depends on the systems for which the access is being
raised) and press enter key. You will get the following systems that you can
request the access for.
Select the Landscapes required by consulting your supervisors and click
the arrow highlighted.
Click Next.
Change the Valid To: year from 9999 to a year ahead from the valid
date from.
Give the description as in the below screen shot: (Mention VSTF also
if possible).
Click on Next and check the details and submit the request.
Click Next.
Provide the description why you need access.
Click finish.
1.6 MS share point access
To obtain the access to MS Share point drop a note to the below people.
Anjani Vadlapudi- v-anvadl@microsoft.com
Click on attachments.
Browse the file and give the comment and the click OK.
Once file is attached to the test VSTF, click on save to update the
changes.
Then go to WorkQueriesNewBug
Enter the BUG Details and upload the Attachments
SAVE
Binaries for
VS11Beta - TestCaseMigratorPlus(Excel-MHT) V1.2 RTM.zip
MTM Format:
MTM Format.xlsx
Click on MTM Migrator plus
Click next
Upload your test cases document under specify file path for excel
work book.
Click next.
Deselect Create links between work items check box and click next.
Select multiple test steps are present in single cell separated by
new line charter check box and click on next button.
Click next
Select your success test case>> Right click on the test case and
then pass it. So the test case will be marked as passed and will appear in
passed cases.
Select your blocked test case>>Right click on it and click block test,
then the test case will be marked as blocked.
How to fail the test case in MTM?
Choose the failed test case>> Right click on the test case and then
click fail test, the test case will be marked as failed.
Select the failed test case and click on Open test case on top or
double click on test case.
The below screen comes up. Then click Create bug
Test plan
format.xlsx
Test evidence
format.docx
7. CPM Tool
After transport request review is complete, the transports have to
be released through CPT tool.
Click Release SAP CR arrow will appear on the right side as shown
in the below screen shot, click on it.
8. SAP landscape
MS SAP landscape has ECC 6.0 running MS SAP core business processes.
9. Roles and Responsibilities
PM
Gather requirements from Business
Design solution, author Functional spec and conduct FS review
Unit testing in MS1
Configuration and documentation
Movement of TRs to MSU and maintaining TR list
Dev
Development of objects/work items in MS1
Adherence to coding standards / MS Best Practices
Unit testing in MS1
Creation and release of Dev item transport
Bug fixes
Test
Author test plan and conduct TP review
Adherence to MS Best Practices
Preparation of test rationale
Testing carried out in MSG/MPG/MST/MPU
Raise functional issues and bugs
Documentation of testing results
Sending the test evidence for functionality owners for their review
and providing SIT sign off to in CPM.
The blow file paths will be used for different releases in FY 2016, the respective
area path and iteration path have to be used for testing.
During testing if the test is failed, tester has to raise a bug for the failed test
cases and attached the test evidence. While raising the bug, the below
guidelines are kept is mind and log the defect.
Field Details
Assigned To Select the name of the resource who
would be working on it
Priority 1 to 4
Area Auto picked by MTM
Iteration Auto picked by MTM
State Proposed
Active
Resolved
Severity 1 to 4
Reason New / Approved
Triaged Pending / Triaged
Root cause Choose the appropriate option
Repro Steps Steps to Reproduce
Symptom
System Info Environment details
History To provide further details, give your
comments.
Attachments Evidence document for the issue
Links Link Test case
Severity 3 System not operating per Offline and Online bugs that are
specification with same as severity 3 include:
Medium
or less impact than Sev-2
Features not working completely
issues (key portions of
as specified, but core elements
feature works)
work
Low likelihood of
Documentation bugs that are severity
data corruption or
3 include:
loss
Major typographic or formatting
Clear workaround is
errors, incorrect
available
alphabetization/sorting
An individual sample which isn't
available or Less visible broken
links