Rev.
Doc. No. : 001/LOC-FI/TG/2011
0
15-April- Page 1/3
DATE
Jln. Raya Bekasi Timur KM. 17 Klender 2011
Jakarta Timur, 13930 PREP'D NS
Telp. 021-46835541 Fax. 021- CHK'D HRD
46835542 APP'D YS
DESIGN MANUAL
FAN FIN COOLER FOR GAS TURBINE COOLING SYSTEM
MUARA TAWAR PROJECT

1. Purpose
This specification concerns the Lube Oil cooling by water circulation.
The purpose of the system is the cooling of the following elements :
Generator bearings lubricating oil,

2. Description
2.1 Constitution
Lube Oil are cooled in paralel.
The off-base cooling system is mainly composed of :
Fin fan cooler modules
An atmospheric expansion tank
All interconnecting piping, instrumentation and valves

2.2 Fin fan coolers modules


a). Mechanical equipment
Modules are installed in parallel and made of :
fans (blades in aluminium)
plenum and framework (mild steel)
supporting frame
air and water compact heat exchanger
Cooling fluid Water
Additive 35 l/m3 (Nalco 2000)
Total cooling water flow 154 m3/h
rate
Total heat to be dissipated 289.8 kW

Heat exchanger outlet 46 C for a max ambient air temperature


temperature of 37 C
Heat Transfer Coefficient 53.70 W/m.K

REV DATE PAGE DESCRIPTION PREPD CHK APPD


D
0 13-April- Issued for Bid Proposal NS HRD YS
2011
Page 2 of 3

Reserve or fouling factor %


Type of draft Induced
Tubes material Copper, 12mmOD x 0.35mmThickness
Fins type Plate
Fins material Aluminium Epoxy, 0.25mmThickness
Fin pitch 4 mm
Collectors material Copper
Bundles protection Epoxy-Coating
Acoustic pressure Maxi 82 dB(A) at 1 m

b). Electrical equipment


Fans are direct driven by electrical motors. In each module, fan motors
divided into two groups :
Block Module 1
Permanen 011 88FC1
t 012 88FC2
013 88FC3
Controll 2 FAN FC1-
3

Motors Characteristic Value Unit


Power 15 KW
Number of motor 18 pcs
Voltage 400 VAC
Frequency 50 Hz
Speed 750 Rpm
Anti-condensation heaters 1A-1B-1C TR Cn (n is the 230 VAV
index of the corresponding motor)
Fan Blade Characteristic, divided by 6 group ( 1
goup as stanby unit)
Fan blade material Alumuni
um
Fan blade diameter 1240 Mm
Wind Flow per Impeller 2 x 30 m3/s
Total Wind Flow per Turbine 60 m3/s
Number of fan blade, 1(one group) as standby unit 2 Pcs

c). Instrumentation
Temperature indicator 1A-1B-1C measures the water temp. at fin fan
coolers inlet.
Temperature indicator 1A-1B-1C measures the water temp. at fin fan
coolers outlet.

REV DATE PAGE DESCRIPTION PREPD CHK APPD


D
0 13-April- Issued for Bid Proposal NS HRD YS
2011
Page 3 of 3

Pressure indicator 1A-1B-1C measures the water pressure at fin fan


coolers inlet.
Pressure indicator 1A-1B-1C measures the water pressure at fin fan
coolers outlet.
Resistance thermal detector 1A-1B- measures the fin fan coolers
water outlet temperature (type : PT100 3 wires).
An alarm High cooling water temperature is displayed if fin fan
coolers outlet water temperature higher than 45 C.
An alarm Cooling water temperature sensor is trouble is displaied if
water temperature is below 20 C or above 80 C.
Each module can be isolated with butterfly valves at the inlet 1A-1B-1C
and at the outlet

2.3 Expansion Tank (Make Up Water Tank)


a). Mechanical equipment
The expansion tank is installed on the GT air inlet filter structure.
Expansion tank volume is designed to permit the coolant dilatation due
to temperature variation and ensures a minimal pressure in the circuit.
o Capacity : 0.9 m3
o Material : Mild steel

b). Instrumentation
Level indicator 1A-1B-1C indicates the water level in the expansion
tank
The low level switch 1A-1B-1C send an alarm expansion tank low
water level on The GT control panel if the level is under the low
level.
Setting point : 200 mm under the centre line of the expansion tank.
3. Fluid
Water Quality and control : according to Gas Turbine Manufacturer
specification
Additive : Nalco 2000 as anti-corrosion product for the first filling and the
make-up.
Supplier : NALCO COMPANY, Indonesia

4. Reference documents
Performance Data Basis Data for Water Base Generator Cooler Design

REV DATE PAGE DESCRIPTION PREPD CHK APPD


D
0 13-April- Issued for Bid Proposal NS HRD YS
2011