Вы находитесь на странице: 1из 1

SHOP DRAWING

CONSULTANT :

CHANGI AIRPORT PLANNERS AND ENGINEERS PTE LTD


60 Airport Boulevard #048-049,
Changi Airport Terminal 2, Singapore 819643
s r een i gne & s r enna l p t r op r i a Tel: (65) 6541 1922 Fax: (65) 6545 5369

CONSULTANT :
OF PARALLEL TAXIWAY NO.2
E 3142.000 Surbana International Consultants Pte. Ltd.
25M 25.449M 15.332M 2.219M
SHOULDER
NEW FLEXIBLE PAVEMENT FOR RUNWAY, STOPWAY AND PERMANENT TAXIWAYS

E 3167.000

E 3142.000

E 3116.551
E 3115.339

E 3101.219

E 3098.900
CONSULTANT:

JURONG Consultants Pte Ltd


8 Jurong Town Hall Road #08-00, The JTC Summit
Singapore 609434
TEL: (65) 6267 8333, FAX: (65) 6267 8283
105.000
1.10% 1.25% 104.910
104.725 104.750 104.681 CONSULTANT :
104.581 104.407
104.475 2.50% MOTT MACDONALD SINGAPORE PTE LTD
104.431 104.401
104.400
104.281 104.276 104.297 4.67% 104.326
104.222 1 Grange Road, #07-01 Orchard Building, Singapore 239693
104.123 104.125 104.117 104.100 104.081 104.126 Tel: (65) 6293 1900 Fax: (65) 6293 1911

103.881 104.197
103.825 103.781 104.022
103.681 103.897
103.697 Project Ref : ED / C2 / 2013 / 2
103.350
103.497 SSKBJV Ref : Conject Ref :
103.075 SUBSOIL DRAIN
103.031 103.297
102.850 103.054
This drawing has been checked for compliance with the design intent and the
102.575 102.531 following comments apply:
102.350
102.075 102.031 No comment.
You may proceed with construction subject to full compliance with all
Authority requirements, Contract drawings and Specifications.
Submit the requisite number of copies of this cleared drawing.

Revise and re-submission.


This drawing requires revision and re-submission in accordance with
250mm THK HOT MIX ASPHALT CONCRETE the comments marked hereon and/or contained in the covering letter.
This drawing is not cleared for construction.
350mm THK CEMENT TREATED BASE COURSE EXISTING TOPOGRAPHICAL LINE 100mm HOT MIX ASPHALT CONCRETE
300mm THK PLANT-MIXED GRADED GRANITE AGGREGATE BASE Checking does not relieve the contractor of the responsibilities for ensuring
300mm THK PLANT-MIXED GRADED GRANITE AGGREGATE BASE full compliances with all Authority requirements, technical specification,
750mm THK COMPACTION MINIMUM 98% OF MODIFIED AASHTO DENSITY 200mm THK COMPACTION MINIMUM 98% OF MODIFIED AASHTO DENSITY contract drawings and all relevant contract documents.
The contractor is responsible for all dimensions, which shall be confirmed
500mm THK COMPACTION MINIMUM 95% OF MODIFIED AASHTO DENSITY 200mm THK COMPACTION MINIMUM 95% OF MODIFIED AASHTO DENSITY
and corrected at the job site, fabrication, processes, techniques of
500mm THK COMPACTION MINIMUM 90% OF MODIFIED AASHTO DENSITY CH. 5+588.870 200mm THK COMPACTION MINIMUM 90% OF MODIFIED AASHTO DENSITY constructions and the co-ordination of his work with that of all other trades.

HORIZONTAL 1 : 300
Approved By :
VERTICAL 1 : 60
...................................................... ..................................
108.048 Name & Signature Date

SUBMITTAL NO.

OF PARALLEL TAXIWAY NO.2


E 3142.000
25M 20.933M 15.133M 7.058M
SHOULDER
NEW FLEXIBLE PAVEMENT FOR RUNWAY, STOPWAY AND PERMANENT TAXIWAYS

E 3167.000

E 3142.000

E 3121.067
E 3119.856

E 3105.934

E 3098.900
105.000
1.25% 1.25%
104.750 104.738
104.687 104.638 2.50% 104.542
104.437 104.488 2 Revise & Resubmit Base on RFA-4561 08MAY2017
104.400 104.338 104.359
104.259 104.2844.
104.188 61%
104.099 104.087 104.100 104.138 104.084
104.032 104.033 1 Add informations 28MAR2017
103.938 103.959 103.958
103.787 103.838 103.759 103.758
103.738 REV. DESCRIPTION DATE
103.559
103.350 103.359 COMMENTS AND CORRECTIONS MADE ON THIS SHOP DRAWING DO NOT RELIEVE THE
SUBSOIL DRAIN C O N T R A C T O R / S U B - C O N T R A C T O R O F H I S
103.037 103.088 CONTRACTUAL RESPONSIBILITIES AND FROM COMPLIANCE WITH
REQUIREMENTS OF THE SPECIFICATIONS AND DRAWINGS, THIS CHECK IS ONLY FOR
102.850 103.172 REVIEW OF GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND
GE NERA L COM PLIA NCE WIT H T HE DE SIGN INTE NT OF T HE S PE CIFICAT IO NS A ND
DRAWINGS, THE CONTRACTOR/SUB-CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND
102.537 102.588 CORRELATING ALL QUANTITIES AND DIMENSIONS SELECTION FABRICATION PROCESSES
AND TECHNIQUES OF CONSTRUCTION COORDINATION HIS WORK WITH THAT OF ALL
102.350 OTHER TRADES AND PERFORMING HIS WORK IN A SAFE AND SATISFACTORY MANNER
SHOP DRAWINGS ARE CHECKED FOR HIGHLIGHTED AREAS ONLY, UNLESS HIGHLIGHTED
FOR DEVIATION FROM WORKING DRAWINGS, WE ASSUME THAT ALL DESIGN INTENTS &
102.037 102.088 D I M E N S I O N A L C O - O R D I N A T I O N S A R E C O M P L I ED W I T H .
.

GENERAL NOTES :
1. RFA-4561 COMMENTS:
- Longitudinal Profiles and Sections are not tally in Entrance Taxiway
EXISTING TOPOGRAPHICAL LINE No.1.
- The crossfall of Parallel Taxiway No. 2 and Crossover Taxiways will not
be reviewed this RFA as per discussion with Dr. Baik on 1st March
2017, until the revised design was approved by PDCO. 17 April 2017
75mm THK CLOSE TURFING LIGHT COMPACTION 200mm
200mm THK COMPACTION MINIMUM 90% OF MODIFIED AASHTO DENSITY
CH. 5+555
HORIZONTAL 1 : 300
VERTICAL 1 : 60

OF PARALLEL TAXIWAY NO.2


23.733M E 3142.000 16.267M 15.133M 11.701M
SHOULDER
NEW FLEXIBLE PAVEMENT FOR RUNWAY, STOPWAY AND PERMANENT TAXIWAYS
E 3167.000

E 3142.000

E 3125.733
E 3124.523

E 3110.601

E 3098.900
105.000
1.25%
1.25%
104.796
104.912 PROPOSED DEVELOPMENT OF CHANGI EAST TO
104.703 104.750 104.696 104.659 EFFECT 3 RUNWAY OPERATIONS AT
2.50%
104.546
104.453 104.396 104.417 SINGAPORE CHANGI AIRPORT - PACKAGE ONE
104.400 104.317 104.342
104.196 3.56%
104.103 104.084 104.100 104.145 104.142
104.019 103.996 104.017 104.000 CLIENT :
103.896 103.925
103.803 103.796 103.817 CHANGI AIRPORT GROUP (SINGAPORE) PTE LTD
103.725 Singapore Changi Airport PO Box 168
103.617
Singapore 918146
103.350 103.417 Tel: (65) 6595 6868

103.146
103.053 LAND OWNER :
SUBSOIL DRAIN
102.850 CIVIL AVIATION AUTHORITY OF SINGAPORE
102.646 102.903 Singapore Changi Airport PO Box 1
102.553 Singapore 918141
Civil Aviation Authority of Singapore
Tel: (65) 6542 1122
102.350
102.146
102.053 CONTRACTOR :
SAMSUNG - KOH BROTHERS JOINT VENTURE
SAMSUNG C&T 3 Church Street, #21-01 Samsung Hub, Singapore 049483
Tel: (65) 6550 8217 Fax: (65) 6538 3779

DRAWING TITLE :
SHOP DRAWING
PAVEMENT SECTIONS
AREA 4 (PART 1)
CH. 5+520 PARALLEL TAXIWAY No.2 (PROFILE E3-E4) (4 OF 4)
HORIZONTAL 1 : 300 SCALE:
VERTICAL 1 : 60 APPROVED BY J. KWON AS SHOWN A1

CHECKED BY J. BAIK DATE: 29JUL2016


DRAWN BY C.YOO
DRAWING NO. RW-SSKBJV-CN-P01-Z_PV-A14-XS-0444
PROJECT NO. PSC0041 PHASE 1 PACKAGE 1 REVISION 2
CAD REF.

Вам также может понравиться