Академический Документы
Профессиональный Документы
Культура Документы
au
Switchboards Division
Capability Overview
REMOTE MONITORING
Switchboard construction, component
GENERAL PRODUCTS SWITCHBOARD PRODUCTS
fit-out and electrical wiring
Copper fabrication used in cutting,
punching and bending the copper and
aluminum conductors for high-current
switchboards
GENERATORS EARTHWORKS
Switchboard quality control and testing
TRENCHING
Site Servicing
POWER MONITORING
State-of-the-art Brady digital printer,
PUMPS DUST SUPPRESSION UON Switchboards site servicing
SWITCHBOARD providing ground-breaking productivity
GENERATORS HDPE INSTALLATION
capability extends right through from
SWITCHBOARDS in label making for wire markers
COMPRESSORS
PUMP STATION CONTROL PANEL installation to commissioning. We offer
AIR COMPRESSOR preventative maintenance programs for Epilog laser equipment used in
BLOWERS WORKSHOP TRANSFORMER SOLAR POWER electrical switchgear and switchboard producing the traffolyte, stainless
WATER TREATMENT
GENERATORS
systems, including, upgrading and/ steel labels and cable markers
THE VILLAGE
FUEL TANKS
or extensions of existing switchboard
STANDPIPE PUMP installations, analyses, testing and repairs.
WATER TREATMENT
Our programmed maintenance package
LOAD BANKS
covers inspections, thermographic
RO PLANT
investigation to identify faulty busbar
POWER STATION
joints and cable terminations. We also
HDPE LINING
PUMP SETS
WASTE WATER
perform tests for circuit breakers and
AIR COMPRESSOR MOBILE POWER SOLUTIONS busbar systems. With a team of over 20 Engineering
LEVEL CONTROL
dedicated staff servicing our clients needs,
the UON Switchboards team consists of UON Switchboards is equipped with
experienced, medium and low voltage our own Engineering team from various
electrical technicians with extensive technical backgrounds allowing us to
knowledge in safety procedures, including provide exceptional solutions for all your
PNUEMATIC DRILLING
all technical and legislative facets of switchboards, transportable switch room
DEWATERING the electrical industry. and substation-kiosk requirements.
BORE HEADWORKS
IR SYSTEM
UNDERGROUND DEWATERING
Integration
Certification
UON Switchboards complies with all the relevant Australian and international
in Action
standards, up to 6300AMP 100KA fault level. Our switchboard solutions are
type tested and comply with AS3439:1:2002 & IEC/EN 61439 standards,
including arc fault containment and temperature rise testing.
Bore Pump Control Panel Commercial Switchboards Power Generation Load Bank Solution
Manufacture of 42 Motor Control Centre
and Energy Metering and Fuel Control
UON was required to install a complete load
Switchboards for a major mine site Manufacture 97 Commercial Switchboards for UON was required to design, bank solution for a power station in the north-
in the Newman area in WA. All motor a major shopping centre south of manufacture and install the outdoor west of WA. The scope of work included the
control switchboards were engineered Fremantle. The scope of supply included the modular switchboards for a major mine supply of five x 6.5MW load bank systems,
and designed in-house by UONs skilled 2500A site main switchboards through to the site in the north-west area of WA. The including five x 7MVA transformers and five x
and talented staff. The clients delivery tenancy power distribution switchboards. The outdoor modular switchboard solution 11kV switchboards. UON manufactured the
expectation put UON Switchboards to the project delivery expectation was fast- tracked provided the client with the flexibility outer enclosures and assembled the five x
test in this instance. However with years by the development company putting pressure to relocate the power distribution and 11kv switchboards, including the wiring of the
of experience in project delivery, on the UON team to meet the updated delivery motor control switchboards along with protection relays. Also included in the scope
the challenge was executed professionally schedules. Working closely with our client, the required machines in a quick, of work was the communications integration
and on time, with no compromise to focusing on quality communication through the cost-effective method, making the between the medium voltage supply end and the
safety and quality throughout the project. process, UON was able to successfully meet complete system sustainable to the low voltage load bank units. Site installation will
the clients delivery expectations on time. client redeployment program. shortly be underway for this complete solution.
Safety
Every day,
we think safe,
we act safe.
Simplicity Positivity
We value simplicity. We focus on what
We integrate many we can do, not what
needs into one we cant.
solution.
Our Values
Accountability Teamwork
We take We work together
responsibility for as one team, with
the outcome. each other and with
our clients.
Client Service
We value our
clients and understand
their needs and
expectations.